Loading...
1987-05 Amending Contract Arctic Engineers, Inc.KODIAK ISLAND BOROUGH RESOLUTION NO. 87-05-R A RESOLUTION OF THE KODIAK ISLAND BOROUGH APPROVING AN INCREASE AMENDING CONTRACT NO. 135 WITH ARCTIC ENGINEERS. INC. WHEREAS, the Kodiak Island Borough Assembly has directed changes not covered in the original scope of services of this contract to be added to the scope of services of this contract due to the relocation of the facility from Smokies to the Landfill location, and WHEREAS, Department of Environmental Conservation has changed some of the conditions of the Landfill Closeout requirements, and WHEREAS, Arctic Engineers. Inc. caused delay in the Bucon construction contract, and WHEREAS, the cost of the above changes have been evaluated as follows: 1. Printing and sit* inspection not included in original contract Baler $ 16,300.00 Landfill Closeout 16,060.00 2. Redesign due to DEC permit changed conditions 10,000.00 3. Waterline Design 8,700.00 4. Landfill site design 20,000.00 5. Soils and survey work 2,068.00 6. Changes to Baler Building 13,630.00 7. Cost of Acceleration of BucOn (10.313.00) caused by slow review of shop drawings by Arctic Engineers, Inc. $ 76.445.00 RESOLUTION No. 87-05-R Page 1 of 2 NON, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough that the Mayor be instructed to execute the amendment to Arctic Engineers, Inc. in the amount of $76,445.00. PASSED AND APPROVED this 6 day of January 1987. KODIAK ISTkND BOROUGH By <l� Bar Mayor By C Pr sidng Officer ATTEST: Bye! ,. Lf LLLIE L.a.....CMC_ Borough rk RESOLUTION NO. 87-05-R Page 2 of 2