1987-05 Amending Contract Arctic Engineers, Inc.KODIAK ISLAND BOROUGH
RESOLUTION NO. 87-05-R
A RESOLUTION OF THE KODIAK ISLAND BOROUGH APPROVING AN INCREASE
AMENDING CONTRACT NO. 135 WITH ARCTIC ENGINEERS. INC.
WHEREAS, the Kodiak Island Borough Assembly has directed changes
not covered in the original scope of services of this contract to be added
to the scope of services of this contract due to the relocation of the
facility from Smokies to the Landfill location, and
WHEREAS, Department of Environmental Conservation has changed some
of the conditions of the Landfill Closeout requirements, and
WHEREAS, Arctic Engineers. Inc. caused delay in the Bucon
construction contract, and
WHEREAS, the cost of the above changes have been evaluated as
follows:
1.
Printing and sit* inspection not
included in original contract
Baler
$ 16,300.00
Landfill Closeout
16,060.00
2.
Redesign due to DEC permit
changed conditions
10,000.00
3.
Waterline Design
8,700.00
4.
Landfill site design
20,000.00
5.
Soils and survey work
2,068.00
6.
Changes to Baler Building
13,630.00
7.
Cost of Acceleration of BucOn
(10.313.00)
caused by slow review of shop
drawings by Arctic Engineers, Inc.
$ 76.445.00
RESOLUTION No. 87-05-R
Page 1 of 2
NON, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough that
the Mayor be instructed to execute the amendment to Arctic Engineers, Inc.
in the amount of $76,445.00.
PASSED AND APPROVED this 6 day of January
1987.
KODIAK ISTkND BOROUGH
By <l�
Bar Mayor
By C
Pr sidng Officer
ATTEST:
Bye! ,. Lf LLLIE L.a.....CMC_
Borough rk
RESOLUTION NO. 87-05-R