WHEREAS, Kodiak International Shipworks has designed a boat repair
'I facility With office warehouse building to be located at an existing dock
.facility in WOMSns Bay, and
WHEREAS. Kodiak International Shipworks holds transferable
purchase
options for Approximately 44.36 &ergs of land contingent to the dock, and
WHEREAS, the 44.36 acres are currently owaed by Konia9, Inc. (a
pOr o:-
IlNately 42.66 acres) and Lash Corporation (approximately 1.6 acres). and
I
WHEREAS, the North Pacific DeeelopMent Company has requested that the
Kodiak Island Borough purchase the above described land and make it available
Eby lease to the North Pacific Development Company for construction of the
Kodiak International ShiprorKs ship lift and repair facility mail support
,Services building, and
WHEREAS, a 56.3 million financing for the building and ship lift and
repair facility including complete refurbishment of the dock facility are
contingent upon the land purchase and lease by the Kodiak Island Borough.
NOW, THEREFORE, BE IT RESOLVED that the Kodiak Island Borough
(Assembly intends to purchase the 44.36 acres of land and 14545 tA• land to
lLorth Pacific Development Company or its 4541908 for the purpose of construct -
imy and operating a boat repair facility, office building and related indus-
"l activities Subject to the following coaditiogs:
II
i 1 Lead purchase shall'bo aceOMPII$hod using proceeds of the sale
of revenue bonds,
2. Ree ease to the land sale filed shell be used to pay off the
revenue bonds
3. Leese and/or
purchase oilpayment, received from NPDC must equal or
teas the total payback
ek on the revenue bond of principle and
� int *rest.
1. "it's' lease to's shall be for a period not to exceed 40 years.
j S. First positiog of load oweershlp by the Kodiak Island Borough.
AND BE IT FURTHER RESOLVED that Kodiak Island Borough staff is
Created to prepare purchase offers, a lease, revenue bond document$ and other
such documents as are required to further Assembly approval and on the
condition that no bonds will be sold or land purchased or leased prior to final
loan approval or financing for the ship lift and repair facility contingent
only on Kodiak Island Borough purchase and loss* of the land,
PASSED AND APPROVED this 3_ day of Acril less.
KODIAK ISLAND BOROUGH
By.
Borro9h Mayor
By. 1"-_ -�v/
ATTEST: Weriieling Officer
SUMMARY OF EXPENSES ASSOCIATED WITH DESIGN SERVICES
SERVICE DISTRICT NO. 1 WATER AND SEWER IMPROVEMENTS
PROJECT NO. 85-3
March 25, 1986
L WORK TO BE COMPLETED BY URS COMPANY
Task No. and Description
Coat
Amendment 14
1. Coordinate the work with the Borough and regulatory
'..
agencies
2. Establish design criteria for the sewer and water system.
$ 6,679
Identify areas to be served by individual grinder pumps, points
of connection or discharge into existing system, establish
sewer and water system locations.
5,000
3. Prepare draft layout of water and sewer system. Draft layout
will be on a single overall map of the design area Prepared by
URS from existing subdivision and other maps furnished by the
Borough. Scale will be 1" = 1001.
4. Review draft layout with Borough officials, incorporate any
5,645
changes resulting from the review and obtain formal approval
of the water and sewer system layout.
S. Prepare pian and profile sheets far water and
3,133
sewer system.
Prepare plan sheets for water meter vaults and sewage
metering manholes as required. Roadway profile and cross
sections differing from existing roadway to be provided by
the Borough.
6. Prepare technical specifications and contract documents.
29,077
13,858
7. Accomplish field design survey. Survey will include survey of
all existing roadway profiles and cross sections of Kraft Way
for use by the Borough in providing future roadway designs
incorporated into the design of the sewer and water system.
See Task No. S.
8. Submit six copies of the plain and specifications to the
34,029
Borough for review and approval.
9. Incorporate any revisions and additions to the plans and
932
specifications resulting from Borough's review.
2,453
10. Submit copies of the final plans and specifications to ADEC
and other regulatory agencies for review and approval. Make
appropriate revisions and additions.
4,625
11. Furnish the Borough with one set of Mylar and master
specifications to be used for construction bidding purposes.
500
" Total
$ 105,931
IL EXPENSES INCLUDED IN TOTAL COST
I
1. 'Navel, housing, per diem, mileage, etc.
$ 7,945
2. All other expenses including printing, office rent, etc.
6.155
Total
$ 14,100
III. COST SUMMARY - URS COMPANY
1. Administration, coordination, etc.
$ 93,953
Z. Profit at 13 percent
11,978
TOTAL COST NOT TO EXCEED
$ 105.931