Loading...
1985-91 Amending The Kodiak Island Borough Landfill Project Design Contract With Arctic Engineers, Inc.f KODIAK ISLAND BOROUGH RESOLUTION 85-91-R A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY AMENDING THE ISLAND BOROUGH LANDFILL PROJECT DESIGN CONTRACT WITH ARCTIC ENGINEERS, INC. WHEREAS, the Kodiak Island Borough has contracted with Arctic Engi- neers, Inc. for design of the Kodiak Island Borough Landfill Project, and WHEREAS, available design money has been expended due to extra work Mand redesign required for the Baler Facility, and WHEREAS, further design work and construction services are required Ifor construction of the Baler Facility and Landfill Upgrade, and WHEREAS, the cost of design work and construction services as estimated at a dollar value of $ 69,500.. NOW, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough Assembly direct staff to amend the Kodiak Island Borough Landfill Project design con- ct with Arctic Engineers, Inc. in an amount not to exceed $ 69,500. PASSED AND APPROVED this 3rd day of Octoher , 1985 by the Kodiak Borough Assembly. Borough Clerk KODIAK IS BOROUGH BY: B rough Mayor