Loading...
1985-17 Authorizing Staff to Execute a Contract with Arctic Slope Consulting Engineers for Design of the Karluk Electrification Project.t7 �I L KODIAK ISLAND BOROUGH RESOLUTION N0, 85-17-R A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY AUTHORIZING STAFF TO EXECUTE A CONTRACT WITH ARCTIC SLOPE CONSULTING ENGINEERS FOR DESIGN OF THE KARLUK ELECTRIFICATION PROJECT. WHEREAS, Arctic Slope Consulting Engineers have tendered a proposal dated January 22, 1985 to provide design services for the Karluk Electrifica- tion Project for $16,700, and WHEREAS, the legislative funding for the Project is significantly lower than the original cost estimate, and WHEREAS, Arctic Slope Consulting Engineers have previously provided design services for the Karluk IRA Tribal Council for the Karluk Central Power Generation and Distribution Plant. NOW, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough Assembly that the design contract for the Karluk Electrification Project be awarded to Arctic Slope Consulting Engineers in an amount not to exceed $16,700. PASSED AND APPROVED this 7th day of February , 1985 by the Kodiak Island Borough Assembly. ATTEST: J ^ By Bor�ofigh Clerk KODIAK ISLAND BOROUGH C/ Borough Mayor, Deputy