FY2026-53 Pool Destructive Testing And Repairs Project Construction Documents And Administrative Services With Jensen Yorba WallJensen Contract FY2026-53
Yorba
Wall
Inc. 522 West 10th Street, Juneau, Alaska 99801 907.586.1070 jensenyorbawall.com
Date: February 19, 2026
To: Codi Allen, KIB Project Manager
From: Corey Wall
Re: Kodiak Pool Lifeguard Room Tile Replacement (JYW No. 25008)
Project Scope
Based on the findings from our 2025 Condition Survey of the KIB Pool, it appears that the waterproofing
membrane under the tile floor and walls is either missing or failing, allowing salt water from the pool area to
penetrate and corrode structure and systems below. This proposal will design tile removal and replacement in
small, contained room to better investigate the existing conditions and test the feasibility of a future,
comprehensive tile replacement project.
Scope:
• Research of waterproof membrane and tile assemblies.
• Biddable design documents for a project estimated to be over $50,000 including:
o Removal and replacement of architectural floor finishes and impacted casework.
o Removal and replacement of mechanical floor drain and limited associated piping.
o Installation of new waterproof membrane in conjunction with tile assembly.
• On-site investigation of existing conditions when tile has been removed and concrete deck, steel
framing, and mechanical drain is exposed.
• A final report recommending future steps and assemblies for a building -wide tile replacement project.
Notes:
• No structural framing replacement or modifications are anticipated.
• No electrical work is anticipated.
• Casework will be replaced in the current configuration.
• Existing doors, frames, and hardware will remain.
• Proposal includes a single site visit by the architect during construction after tile demolition with the
assumption that KIB will supply on-site observations and pictures for the rest of the construction
period.
Thank you for the opportunity to assist you! Total Contract Cost: $42,739
W�
AinYe Williams, Boro gh M nager
NUN. Javier, Borough CI rk, Attest
Jensen Yorba Wall
26 PUV26
Date
Date
3.24.2026
Date
page 1 of 1
EEEE
NONE
MEMO
J
Q
N
O
a
O
a
N
w
U_
LU
V)
Z
cn
W
0
Q)
4J �
N �
L W
LiJ
s U
C: 7
Z w v
Q U
LL
J U Ln 2i
H
Z
0
V
�I
zz 00
{/}
txo
•�
o
LL
bto
L
L1J-0
L
M
ifo U
J
N
_
++ Co
co U C
L
O
H
5
Q
L
d
cw
*'
u p
— ro
O
L n LL
U co N � A
L 7
(L i
Lu2-i U Ln
O U
��Ili�ll�llllllil
�■111111■111111■1
�■111111■Illlllil
I:IAAl11AA111
�■illlll■111111■�
Q)
4J �
N �
L W
LiJ
s U
C: 7
Z w v
Q U
LL
J U Ln 2i
H
Z
0
V
,:t vi. R*
1:T RT
Ln Lr
N N
3
N
Q.
a� E
t
U m
J
coo W
W
U.
N
LnW
LUJ V
m >
Q
�W
H
CO N
O H
Qw Z
J of 5W
N N `
U U D
V
LL N O
Ln Ln
E EO
CL a-
0 0
V
> > >
CU E
0 0 CC
o=n c H
a) In
LU E
0 o V
In Ln O
N
O
N
Q1
N
0
lD rl n
zz 00
{/}
txo
•�
o
LL
bto
L
L1J-0
L
M
ifo U
J
N
_
++ Co
co U C
L
O
H
5
Q
L
d
cw
*'
u p
— ro
O
L n LL
U co N � A
L 7
(L i
Lu2-i U Ln
O U
,:t vi. R*
1:T RT
Ln Lr
N N
3
N
Q.
a� E
t
U m
J
coo W
W
U.
N
LnW
LUJ V
m >
Q
�W
H
CO N
O H
Qw Z
J of 5W
N N `
U U D
V
LL N O
Ln Ln
E EO
CL a-
0 0
V
> > >
CU E
0 0 CC
o=n c H
a) In
LU E
0 o V
In Ln O
N
O
N
Q1
N
0
EEEE
NONE
NENG)
J
Q
O
a
O
a
N
w
U_
W
V)
Z
W
0
U
fC
Q
GJ
Gl
H
E
O
O
^w
W
J
O
0 00
a
0
GO 0
Y N
E
i
O 0000
Ln Ln
—i r -I
V? i/-
bA
C v
N �
N� W
�
U W
U
dUA � f0
Z W U t
L U
Ju ci
2j U
n
N
Z
O
U
OA
C
u m
U N
U f0
Lu 2
U
7
U
U
U
U
U
a
U
Q
ca
U
C
M
J
0000 O (n
o m m
M M
0
O
co
W
W
U.
N H
LU W
m U
a�
Z)W
cc.m Vf
m�Z
W
N N
U U
L L �L
Q) Qi v
N N
� c Z
O O
�cl
�Q
•� Z
EF=O
_0-_
aaF-
C: c U
o O D
2 2 H
^�Z
O 00
U U Ln M
U
�E cB J
-0-00 H
vii cn
tD
N
O
N
Q1
N
N
ci
�0■111111■111111■1
�0■111111■Illlllil
�■111111■111111■1
�■111111■111111■1
�■111111■Illlllil
1■111111■111111■1
�■111111■Illlllil
■11111■111111■1
O 0000
Ln Ln
—i r -I
V? i/-
bA
C v
N �
N� W
�
U W
U
dUA � f0
Z W U t
L U
Ju ci
2j U
n
N
Z
O
U
OA
C
u m
U N
U f0
Lu 2
U
7
U
U
U
U
U
a
U
Q
ca
U
C
M
J
0000 O (n
o m m
M M
0
O
co
W
W
U.
N H
LU W
m U
a�
Z)W
cc.m Vf
m�Z
W
N N
U U
L L �L
Q) Qi v
N N
� c Z
O O
�cl
�Q
•� Z
EF=O
_0-_
aaF-
C: c U
o O D
2 2 H
^�Z
O 00
U U Ln M
U
�E cB J
-0-00 H
vii cn
tD
N
O
N
Q1
N
N
ci
RSA
Engineering
February 19, 2026
Jensen-Yorba-Wall, Inc
522 W Tenth St
Juneau, AK 99801
ATTENTION: Corey Wall
Dear Corey,
REFERENCE: KiB Kodiak Pool Tile Test Replacement
Mechanical & Electrical Engineers
RSA Engineering is pleased to offer a fee proposal for mechanical engineering services for the referenced
project. We have based our scope of work on your e-mail correspondence dated 13 February 2026,
along with the following assumptions:
General
• We understand the project to be replacing the floor tile and some portion of the floor slab of the
Lifeguard Room as a test to see what is going under the tile and why the floor drain is rising out
of the floor.
• No site investigations are included in this proposal. We will use the photos we have from the
condition survey we conducted on this facility.
• We anticipate 65% and 95% design submittals on this project prior to providing signed plans for
construction. Specifications will be provided on the sheets.
• Bid phase services include answering bidder questions and preparation of addenda material.
• Construction phase services include submittal review, DCVR review/response, and review of
construction photos.
Mechanical
• We will specify the new floor drain to be installed in place of the existing floor drain. We anticipate
the waste, vent, and trap primer piping will be reused for reconnection within three feet of the
existing floor drain, or at least within the lifeguard room.
Exclusions_
• No travel for site investigations or construction inspections is included in this proposal.
• Commissioning services, LEED services, and cost estimation services are not included.
RSA proposes the following lump sum fees for this project:
Project Tasks Mechanical
65% Design Development $2,216.00
95% Construction Documents $1,372.00
100% Construction Documents $818.00
Design Subtotal: $4,406.00
Bidding and Permitting $264.00
C/A $1,320.00
C/A Subtotal: $1,584.00
GRAND TOTALS: $5,990.00
670 W. Fireweed Ln, Ste 200 Anchorage, AK (907) 276-0521 1 www.rsa-ak.com
February 19, 2026
Please review and advise if this proposal is acceptable by signing below and returning a copy to our office
as our notice to proceed. We look forward to working with you on this project.
mrf/nmd
26-0056/P26-044
Accepted for Jensen-Yorba-Wall, Inc
Sincerely,
Mark R. Frischkorn, P.E.
Vice President, Principal Mechanical Engineer
Page 2 of 2
[PI tD
ENGINEERS, INC.
February 18, 2026
Corey Wall
Principal Architect
Jensen Yorba Wall, Inc
522 Tenth Street
Juneau, Alaska 99801
SUBJECT: KODIAK POOL LIFEGUARD ROOM TILE REPAIRS -STRUCTURAL ASSISSTANCE
Dear Mr. Wall,
PND 252045
PND Engineers, Inc. (PND) appreciates the opportunity to provide this fee proposal for structural assistance with tile
repair in the lifeguard room at the Kodiak Pool building.
PND scope of work will be the following:
1) Review documentation (photos and/or video) of the condition of the existing concrete floor slab after the
existing tile is removed. A site visit by PND during tile removal is not included in this fee proposal, so proper
documentation shall be provided to PND by JYW and/or the owner's onsite representative.
2) Provide brief report describing the condition of the existing concrete slab and how the condition shall be
taken into account if further tile removal in the building is being proposed.
3) Provide input for any structural damage uncovered when the existing tile is removed.
PND proposes to perform the above outlined services on a time and expense basis for $1,500. We will invoice
monthly for hours worked and expenses incurred in accordance with our standard billing rates at the time of service.
Expenses will be invoiced at cost plus 15% administrative markup.
Thank you for considering PND. If you have questions or need additional information, please feel free to contact
me. We look forward to working with you.
Sincerely,
PND Engineers, Inc. I Juneau Office
Brian Nielsen, P.E, S.E.
Vice President/Principal Structural Engineer
9360 GLACIER Hwy., STE. 100• JUNEAU, AK 99801 • P: 907.586.2093
Vol. FY2026, No. 17
Kodiak Island Borough
Assembly Newsletter
March 20, 2026
At Its Regular Meeting Of March 19, 2026, The Kodiak Island Borough Assembly Took The Following
Actions. The Next Regular Meeting Of The Borough Assembly Is Scheduled On Thursday, April 2, 2026,
At 6:30 p.m. In The Borough Assembly Chambers.
PRESENTED The Master Municipal Clerk Certificate And Pin To Deputy Clerk Lina Cruz, MMC
VOICED NON -PROTEST To The State Of Alaska Alcohol And Marijuana Control Office Beverage
Dispensary Liquor License Transfer Of Controlling Interest For Kodiak Hana Restaurant, License No.
4325 And Directed The Clerk To Notify AMCO Of This Decision
AUTHORIZED The Borough Manager To Execute Contract No. FY2026-45 With Brechan Construction
LLC For Landfill Soil Remediation In The Amount Of $61,500
AUTHORIZED The Borough Manager To Execute Contract No. FY2026-46 For Picnic Table Removal
And Replacements With AIM Maintenance LLC For $9,200
AUTHORIZED The Borough Manager To Execute Contract No. FY2026-53 With Jensen Yorba Wall For
Pool Destructive Testing And Repairs Project Construction Documents And Administrative Services In
The Amount Of $42,739
ADOPTED Resolution No. FY2026-14, Authorizing The Manager To Accept The 2026 Volunteer Fire
Capacity (VFC) Grant For The Womens Bay Volunteer Fire Department
ADVANCED Ordinance No. FY2026-20, Rezoning Ouzinkie Block 3 Lot 2 (2209 Second Street) From
R1 Single Family Residential District To B Business District To Public Hearing At The Next Regular
Meeting Of The Assembly
ADVANCED Ordinance No. FY2026-21, Rezoning Ouzinkie Tract C Block 1 Parcel 1 USS 4871 (648 G
Street) From R1 Single Family Residential District To PL Public Use Lands District To Public Hearing At
The Next Regular Meeting Of The Assembly
ADVANCED Ordinance No. FY2026-22, Rezoning Ouzinkie Block 14 Lot 7 (3525 Third Street) From R2
Two Family Residential District to PL Public Use Lands District To Public Hearing At The Next Regular
Meeting Of The Assembly
View our website: Visit our Facebook page:
www.kodiakak.us www.facebook.com/KodiakislandBorough