ATS 1408 TR A - ZCP 5/13/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http: / /www.kodiakak.us
Zoning Compliance Permit
Print Form
111
11
lilt
14878
1
Submit by Email
111
Permit No. CZ2011 -062
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Kodiak Fishmeal
915 Gibson Cove Rd., Kodiak, AK. 99615
1.907.486.3171
ATS 1408 Tr A
915 Gibson Cove Rd
Use & Size of Existing Structures: Waterfront Business
Description of Proposed Action: Roof repair
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
ZONING: Industrial PACS_No. 14878
Lot Area: 1.67 acres Lot Width: Not Applicable Bldg Height: Unlimited
Front Yard: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
If YES, do you have an EPA Return Receipt of Notification?
YES "Permit will not be issued until receipt is submitted to KIB" N / A
Coastal Policy Industrial
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Consistent?
Plat No.
Yes
Attachment?
RMSERM
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: May 13, 2011
List Other:
Signature: Bernie Stallard for Kodiak Fishmeal Co.
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
0
Date: May 13, 2011 CDD Staff: Martin
Payment Verification
Zoning Compliance Permit Permit No.
The following information is to be supplied by the Applicant:
Property Owner/ Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Description of Proposed Action:
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: PACS_No. q
Lot Width:,
Rear Yard:
# of Req'd Spaces:
Bld'g Height:
Side Yard: ,
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bldg Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date:
List Other:
Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date:
CDD Staff:
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule