FY2008-18 Kodiak Island Borough School District New Pool~DD~J- /~ =_ Document A101TM -1997 Standard Form of Agreement Between Owner and Contractor where fhe basis of payment is a STIPULATED SUM AGREEMENT made as of the Tenth day of January in the year of Two Thousand Eight (In words, indicate day, month and year) BETWEEN the Owner: (Name, address and other information) Kodiak Island Borough 710 Mill Bay Road Kodiak, AK 99615-6398 Telephone Number: (907) 486-9300 Fax Number: (907) 486-9374 and the Contractor: (Name, address and other information) Janssen Contracting Co. Inc. 1520 Post Road Anchorage, Alaska 99501-1710 Telephone Number: (907) 276-2737 Fax Number: (907) 279-1822 The Project is: (Name and location) Kodiak Island Borough School District New Swimming Pool Kodiak, AK The Architect is: (Name, address and other information) ECI Hyer, Inc. 101 W. Benson Blvd., Suite 306 Anchorage, AK 99503 Telephone Number: (907) 561-5543 Fax Number: (907) 562-3213 The Owner and Contractor agree as follows. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. Inst. AIA Document A101 TM -1997. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized ~ reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the / maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/1M2008 under Order No.1000317647_1 which expires on 8/21/2008, and is not for resale. User Notes: (3018319283) ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. I/nless stated elsewhere in the Contract Documents, insert any requirements for earlier Substantial Completion of certain portions of the Work.) The Contractor shall achieve Substantial Completion of the entire Work not later than Portion of Work Substantial Completion Date Substantial Completion 7/29/2009 Final Completion 8/12/2009 subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time or for bonus payments for early completion of the Work.) The Contractor and the Contractor's surety shall be liable for and shall pay the Owner the sums hereinafter stipulated as liquidated damages for each calendar day of delay until the work is substantially complete: one thousand dollars ($1,000) per day. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Eleven Million Six Hundred Eighty-three Thousand Eight Hundred Ninety- five Dollars and Zero Cents ($ 11,683,895.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: AIA Document A101 TM -1997. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized .2 reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the / maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/14/2008 under Order No.1000317647_i which expires on 8/21/2008, and is not for resale. User Notes: (3018319283) (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires) Base Bid: $11,370,700 Add Alternate No. 2, Additional paving in service alley $ 128,840 Add Alternate No. 4, Furnish and Install All Tile Pool Finish $ 79,590 Add Alternate No. 6, Furnish and install "Epic Span" cellular roof decking in lieu of standard acoustic roof decking within Natatorium 117. $ 104,765 Total: $11,683,895 § 4.3 Unit prices, if any, are as follows: Description Units Price ($ 0.00) N/A ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the First day of a month, the Owner shall make payment to the Contractor not later than the Thirtieth day of the same month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than Thirty (30 )days after the Architect receives the Application for Payment. § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent 5.00% ). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.8 of AIA Document A201-1997; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent (5.00% ); The Contractor shall remain responsible for transportation and protection of materials and provide insurance protecting the Owner's interests. .3 Subtract the aggregate of previous payments made by the Owner; and AIA Document A101 T"~ -1997. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Inlt. Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3 reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the / maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/14/2008 under Order No.1000317647_i which expires on 8/21/2008, and is not for resale. User Notes: (3018319283) .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-1997. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AIA Document A201-1997 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-1997. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) The Owner may reduce or eliminate further retainage once the project reaches 50% completion. However, the Owner reserves the right to reinstate retainage on subsequent pay applications if the Contractor's performance or progress so warrants. § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when: .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-1997, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. .3 The Owner shall withhold 10% of the final pay application until Owner receives signed notification of project completion from the Alaska Department of Labor. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 6 TERMINATION OR SUSPENSION § 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-1997. § 8.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-1997. ARTICLE 7 MISCELLANEOUS PROVISIONS § 7.1 Where reference is made in this Agreement to a provision of AIA Document A201-1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. AIA Document A101 TM -1997. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 4 reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the ~ maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/14/2008 under Order No.1000317647_1 which expires on 8/21/2008, and is not for resale. User Notes: (3018319283) § 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) (Ten point five percent 10.5%) per annum (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) § 7.3 The Owner's representative is: (Name, address and other information) Ken Smith, P.E. Project Manager Kodiak Island Borough 710 Mill Bay Road Kodiak, AK 99615-6398 Telephone Number: (907) 486-9341 Fax Number: (907) 486-9347 Email: ksmith@kib.co.kodiak.ak.us § 7.4 The Contractor's representative is: (Name, address and other information) Harry T. Tibbs Janssen Contracting Co. Inc. 1520 Post Road Anchorage, Alaska 99501-1710 § 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 7.6 Other provisions: ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS § 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, aze enumerated as follows: § 8.1.1 The Agreement is this executed 1997 edition of the Standazd Form of Agreement Between Owner and Contractor, AIA Document A101-1997. § 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AIA Document A201-1997. § 8.1.3 The Supplementary and other Conditions of the Contract aze those contained in the Project Manual dated September 18, 2007 ,and are as follows Document Title Pages Project Manual Kodiak Island Borough School District See 8.1.4 New Swimming Pool Bid Documents AIA Document A101 T~" -1997. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Ir11t. Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 5 reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the / maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/14/2008 under Order No.1000317647_1 which expires on 8/21/2008, and is not for resale. User Notes: (3018319283) § 8.1.4 The Specifications are those contained in the Project Manual dated as in Section 8.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: See attached Exhibit A -Table of Contents (Table deleted) § 8.1.5 The Drawings are as follows, and are dated September 18, 2007 unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: See attached Exhibit B -List of Drawings (Table deleted) § 8.1.6 The Addenda, if any, are as follows: Number Date Pages Addendum No. 1 9/27/2007 2 Addendum No. 2 10/10/2007 46 Addendum No. 3 10/24/2007 15 Addendum No. 4 10/31/2007 28 Addendum No. 5 11/8/2007 19 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 8. § 8.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201- 1997provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) This Agreement entered into as of the day and year first written above. OWNER ( tgnature) (Printed name and title) CONTRACT (Signature) Harry Tibbs Vice President (Printed name and title) ~~~ ~ LAN D ~~~ ®~ ., ~ - .~ /_ ~ ~ ~~,~ Init. AIA Document A101TM -1997. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the ~ maximum extent possible under the law. This document was produced by AIA software at 15:42:32 on 01/14/2008 under Order No.1000317647_i which expires on 8121/2008, and is not for resale. User Notes: (3018319283) NOTICE TO PROCEED KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, AK 99615-6398 To: Janssen Contracting Co., Inc. 1520 Post Road Anchorage, AK 99501-1710 Project: New Kodiak MS/HS Swimming Pool Contract No.: 2008-18 DEED Project No. DR OS 110 Amount of Contract: Not to Exceed $11,683,895.00 You are hereby notified to commence work on the referenced contract on 4 February 2008 and shall fully complete all of the work as per the schedule in the contract. Dated this ~ ~ day of January 2008. By.t~~' Rick L. Gifford Borough Manager ATTEST: Nova Javier, C `•., _;; O 4 t O tiw Y 'y n ~9~~SKA ~ ~g63 Borough Clerk \\dove\Departments\EF1Capital Projects\Bond Issue\Projects\Pool\ContractUanssen\Notice to Proceed.doc Page 1 of 2 ~ a o ACCEPTANCE OF NOTICE Receipt of the foregoing Notice to Proceed is hereby acknowledged By: ~ ~~ ~~~ This .5 day ofd 2008 ~ ~ By: Title: \\dove\Departments\EF1Capital Projects\Bond Issue\Projects\Pool\ContractUanssen\Notice to Proceed.doc Page 2 of 2 ~~ '.,. KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. 2008 18 Change Order No. 1 Project Name, Number & Location KHS/MS New Swimming Pool Contractor Janssen Contracting Inc. Amount of Contract & Change Order Original Contract $ 11,683,895.00 Previous Changes $ -0- This Change $ 8,076.31 Adjusted Contract $ 11,691,971.31 Description of Change Cost As part of the Scope of Work for construction of the new Swimming Pool, a $8076.31 certain amount of tree removal on the site was required and has been accomplished. The trees that remain are now no longer supported by the removed trees and pose a safety hazard. This Change Order is for the removal of all trees remaining on the site. Attached is the Contractor's Proposal and the Sub Contractor's breakdown of the cost for the additional tree removal. The E/F Department recommends a Contract Change Order in the amount of $8076.31 to Contract 2008-18 for the firm of Janssen Contracting, Inc The time provided for completion of the contract is (® unchanged) (^ increased) (^ decreased) by calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply thereto. Accepted By: See attached AIA Form Contractor's Representative liti~~~ ~ Recommend Engineering/Facilities Directo /l n ~- , ~ Approved By: 1Glanager (Less n .10,000 - for all change ers on this contr If the change order or orders exc A. The mayor and deputy presi B. The mayor and one (1) asse C. The deputy presiding officer D. Any two (2) assembly memo Approved By: Mayor Date ai~ Jt9~ ~~ Date S~/`~ o~ Finance Director /, Date ~ I~~ ~ ~ -) dollars, it will require the signatures of ~~ ~: e _. in t enc f the deputy presiding officer; s e er in the absence of the mayor; or gng~ ayor and deputy presiding officer. Deputy Presiding Officer Date Revised by MIS 06/14/06 ® TM =_= Document G701 - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 001 OWNER: Kodiak Island Borough School District DATE: May Ol, 2008 ARCHITECT: New Swimming Pool 800 Mill Bay Road CONTRACTOR: Kodiak, AK 99615 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 3005 FIELD: ^ Janssen Contracting Co. Ino. CONTRACT DATE: January 30, 2008 OTHER: ^ 1520 Post Road CONTRACT FOR: General Construction Anchorage, Alaska 99501-1710 THE CONTRACT IS CHANGED AS FOLLOWS: (7nchcde, x~here :Yplicable, any amrlisputed amount attributable to previoush~ erecaUed Construction Change Directives) The original Contract Sum was $ 11,683,895.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 11,683,895.00 The Contract Sum will be increased by this Change Order in the amount of $ 8,076.31 The new Contract Sum including this Change Order will be $ 11,691,971.31 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is July 29, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guazanteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Conshuction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ECI Hyer, Ina Janssen Contracting Co. Inc. Kodiak Island Borough ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 101 W. Benson Blvd., Suite 306 Anchorage, AK 99503 ADD SS ~. BY (Sig atur ) Terry ,Principal (Typed name) 1520 Post Road Anchorage, Alaska 99501-1710 ADDRESS BY (Signature) Tom Tibbs, Project Manager (Typed name) May O1, 2008 May O1, 2008 DATE DATE ~• y. ~O O ?J ~• Y/ ~ ~~ _ ~~~~ 710 Mill Bay Road Kodiak, AK 99615-6398 ADDRE .- ~- BY (Signature) / Risk (ti ffnrrl _ (Typed name) Hager Ma Ol, 2008 DATE ~~~_ AIA Document G701T"~ -2007. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:10:06 on 05/01/2008 under Order No.1000317647_1 which expires on 8/21/2008, and is not for resale. User Notes: (1194851628) KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. 2008 18 Change Order No. 2 Project Name, Number & Location KHS/MS New Swimming Pool Contractor Janssen Contracting Inc. Amount of Contract & Change Order Original Contract Previous Changes This Change Adjusted. Contract $ 11,683,895.00 8,076.31 1,193.53 $ 11,693,164.84 Description of Change Cost As per Architect's Supplemental Information #0005 (attached), the Contractor is $ 1,193.53 requested to provide a floor drain FD-land piping in Hall 110. The E/F Department recommends a Contract Change Order in the amount of $ 1,193.53 to Contract 2008-18 for the firm of Janssen Contracting, Inc The time provided for completion of the contract is {® unchanged) (^ increased) (^ decreased) by calendar days. [ This document shall become an amendment to the contract and all provisions of the contract will apply thereto. Accepted By: ~ ..L-~'"~'~---°"'-' Date ~~' 1. 4~ `. Contrac is Representative Recommended: ``" Date ~/~`~~~ ~• gineenng/Facilities Director Finance Dire for °'~"~~~'""~... '~. ~f~~.. ... ,> `~_ " ~_~. Approved By: Attest: `~- ate Manager (Les an ,tlo,ooo - Torat Borough C •k '. `~ for alE Chang rders on this contract) ~~ .-. 1 ~: ~ ~ If the change order or orders exceeds ten thousand (10,000) dollars, it wil equ a the s~r s~Sf: A. The mayor and deputy presiding officer; B. The mayor and one (1) assembly member in the absence of the deputy presidin c ~~3 C. The deputy presiding officer and one (1} assembly member in the absence of the ~ ~ 1 D. Any two {2) assembly members in the absence of the mayor and deputy presiding of i ~ ( , ~~ Approved By: ~ ~ _ ~ ~ _ ~~ ".. ayor Deputy Presiding Officer Revised by MIS 06111/06 KODIAK ISLAND BOROYI'GH 7l 01V.U~,L BAY ROAD KODIAK, ALASKA 996]5 Project Name,l~Iamber & Location KHS/MS New swimming tool Contractor Janssen Contr~sctin Inc. CONTRACT CHANGE QRDER Contract No. 2008 I8 Change Order No. 3 Amount of Contrail ~$ Change Order original Contract Previous Changes $ 11,b83,895.00 S 9,269.84 ~ This Change $ 1,522.24 Adjusted Contract $ 11,694,687.08 Description of Change Cost As pet RFI #O1 S (attachtxl), the Contractor is requested to provide additional S 1,522.24 anchor rods for columns at Grid Ci. RFP 005 - The time provided for, catupletion of the eorttx~sct is unchanged) increased) ( decreased) by calendar days. - - This document shall become art amendment to the contract sod all visions of the oontract will a 1 thereto. r Accepud ]3y-. ,~~ Date ~~ D Contractor's Repre:~utative Recommended: ' ~- Date 7 "~ P ~ d P' Fngitteering/F'$cilities Direr or ce Diret:to ~ - Approved lay: ~--~.~.t ~ LA , Manager {uas :rkan i1 ,o - „m¢- Date ~~ ~"! .0 rk for ~ chtuige tirtlers oo t CO 1~~ ~ • ,~ J ' • .,. ri if fire change order or orders exec tho T ~ liars, ft will require the signatures of A. The mayor and deputy prey' o ; B. The mayor and one (1) assembl meLab o e deputy Presiding officer; C. The clcpaty presiding officer and ~~e (1) assembly r in the absence of the mayor; or D. Any two (2) assembly members in nc~ absenee_of thc-ma r and d ty siding officer. .. Approved $y: L Date 9 2 2 ` Yor ~ uty Pre ng OfHctr x~~sat byMIS o~t~o6 AlA Document G701° - 2001 Change Order PROJECT l.Narne and addf7ess): CNAHaE ORDER NUTABER: 003 OWNER: ~ Kodiak Island Bomugh School I?istrict DATE: August 14, 20U$ ARCHfFECT: ~ New Swimming Pohl 800 Mill Bay xnad CONTRACTOR: .Kodiak, AIC 99615 FIELD: ^ TO CONTRACTOR fName anti uJdresr): ARCHITECTS PROJECT NdYBER: 30t)5 Janssen Contracting Cn. Inc. CONTRACT DATE: January 30, 2()08 OTHER: ^ 1520 post Ruud CONTRACT FOR: General Cnnstn7etitm Anchorage, Alaska 49501-1710 THE CONTRACT iS CHANGEd) AS FOLIOWS: (lricirrde, Fvhere appticaGte, any undispuird umnu7g attribuiaGie to previously executed Construction Chfmge!)irectivet) The origintil Catttraci Sum was A i l,bi13,$95.00 37ie net lunge by previously uuthotized Change Orders Z 9,2b9.84 The ContractSumgrinr to this t~7angc Omer was S I I,b93,16r3:84 'Pha ContractSktm will be itictexsed by this Change Chdcr in the amount of S:1,522::4 The new Contract Sum including this Ch7mgr tJrdrx will be ~ 11,694,087.08 The Contract "f t7tte will ]x increased by .T~ro { 0) days. ThF; data of Sub,4tantial Cotrtpletion as of ]hc date of this Change t?ider U7erefore is July 29, 2009 NOTE:'This (~ia7ige grder dues not ineltide chtrngas in the Contracr$uF7t, Contraet'I"ixne or Guaranteed Maximum Puce winch ha~~e been autltorized by Conairur~tion Change DimcYive until @7e cixst and time hive been agreed upon by 6nth tha Clm7er and t'ontractor; th whuh case x Change thtjer is oxecuted ro supersede the ContitrtFCtioxt {1ta7tge Directive, NdT YALib UNTiL SiGN£D [iY THE ARCHITECT, CONTRACTOR AND OWNER ECE Hyer, TnG ARCHITECT (FYrm Hume) tOl. '~. Benson Blvd., Suite-306 Anchof7t~e, AK 99503 ADD ESS 6Y (Si re) Janssen. Conaactiu~Co. l<itc. CONTRACTOR (Firm sixrms) 1520 Post Roxd Anchot~,e, Alaskn 44501-1710 ADDRESS ~_J ~ ,~ B (Si~natur ~ //~.! Kodiak isl7tnd Boraugit OWNER. (Firm rutnre) 710 Mild Bay RuadO Kodiak, AK 94615J6348 ADDRESS BY (.Signature) Terry K. Hyuyr, AIA Harry T.1~6hs (Typed name) (Typed nar/resJ _ _ ~- (Typed nan:ei August 14, 2008 ~ //~ ~ / d ~'/ GATE DATE DATE kIA bootsmeM t378t TM - 20DY. CopYr3gltit rat 979, 798%, X20170 and 2D01 by Tho American Irrs[Rkrte of Architects. All rgtet7: r7rsnrvitd. YYARNIPrF;- This k3A` 7c-cement k prcHeciexl by t7.5. CopyrFgh£ t..aw and tnta; nF:tianirr 7rnaiirt~. Unauih~rS7.gd rapraduatian 6r rYiSiriCUtion 7! this AFAR' tMaumgni, or nny p~r.FoFt of ik, naa;y rtiaFutt in severe cFvN antlcrrm7nal pena7ika, afld wi31 itb prosxcuted io t7te m9ximunl extent possiltie antler the Ixx. This document was prodrxed by AIA software at t q:t76:09 on OQS(7+t/2noe under Order No.t00asaR836 ,I which expSres cnnl20f2009, and is not for resale. t15at' NotBS: (2fl365t34987} r nvr vvr,-` JANSSEN C~NTRACTINr CnMPANY INr. - -- , TITLE AND LOCATION: New Kodiak Swimming Pool RFP #: RFP-005 OWNER: Kodiak Island Borough Ken Smith DATE- 6/19/08 CONTRACTOR: Janssen Contracting Co Inc CONTRACT NO: 03119 ARCHITECT: ECI / Hyer, InC. Jae Shin RFI / ASI# fi 015 DESCRIPTION OF WORK: Change anchor rods and base plate size at grid G columns discribed in RFI, 015 SUBCONTRACTOR'S: MatJLabor O 8~ P °/a A Universal welding $ 1,219.30 15°~ (Subcontractor Cost) B $ - 15% (Subcontractor Cost) C' $ - 15% (Subcontractor Cost) D $ - ~ 15% (Subcontractor Cost) E $ - 15°k (Subcontractor Cost) F SUB TOTAL LINES A - E: 8~ PP G MATERIALS: H LABOR: I EQUIPMENT AND TOOLS: 11 MISCELLANEOUS: SUB TOTAL LINES G - I: CONTRACTOR MARK UP 8% ON SUBCONTRACTOR TOTAL COSTS: 1 s°~ 15% 15°~ 15°k 8% L SUBTOTAL; LINES A - K: M BOND COST: SUB TOTAL 1.5% OF LINE L N GRAND TOTAL -LINES L & M: O TOTAL COST PROPOSAL from universal om TITLE: Universal Wdding & FabricaHoo 2720 Hurst Rd North Pole, AK 99705 Phone: 907-488-2934 Fax: 907-488-7856 Change Order To: Tom Tlbbs Janssen Contracting Co., Inc. Phone: 907-276-2737 Fax:907-279-1822 Subject: RFI15 Date: 7/10/2008 Page 1 of I CO #: 5 Job #: 07-0001 Kodiak Pool SupplyBrect Structural& Misc Steel Change Requested By: Janssen Contracting Company Sent Via: Email Description of Change: Material Cost = 5507.13 Labor= 5712.17 Material and labor TlCost= S1219.30 Overhead BtProfit S 182.90 Sub TI Cost= SI,402.20 The change will cause an increase of E1402.00 to Ute contract amount. A signature below indicates acceptance of all changes shown herein. Any work associated with this change will begin upon receipt of a signed copy of this C.O. in our office. Accepted By Universal Welding & Fabrication Kodiak Island Borough School District l~ew Swimming Pool Contractor RE[~UEST FOR INFORMATION RFI, No.015 Engineering and facilities Dept. Architect; ECUHyer, Inc Janssen Contract 7fQ M311 Bay Road 101 W Benson B1vd., Suite 306 1520 Post Road. Anchorage Alaska 99SO3 Anchornge Alaska _99503 Anchorage Alaska 99501 Kodiak Atas>ca 99615-6398 Contact., :lae Shirt YYYY/8+1M/QD TITLE: Canopy Column Anchors DATE: 24A8/02/21 PROJECT: School District New Swimming Pool Project No. 03119 TO: Kodi&k Isianil borough lKen Smith ORIGINATOR: JCCI/Univergal Welding DravF-ing page and speciflcatian section associated with the request, 51:1, 51.2, Detail 12/55.1 RLQUES"I': llrawing Sl.i refers to detail 12/S5.1 which shows the top of the concrete pilasters on grid G for the canopy columns are at elevation -4'-$". Drawing S I.1 shows the top of the footing for the same pilasters to be at elevation -?'~8"-from grids 1 to 5 and from grids fi to 8 the footings-are at even lower levels. Deta112IS5.1 also shows that the'/,".diameter anchar bolts stop 2" from'the. top of the- footing which makes. the end of the anchors b'-1 Q" below the top of the.: pilaster. This seems kind of long. Is the depth for the anchor bolts correct? ANSV Use a~ ~~~.~: ~ ~~~~~~, ,~~t- ~f~r~ ~,~ ah~f ~~c~.~ t~'/~ C.11 ~ L'T'r+'ls."Y S ~t. ~ ~"e ~ i.,~ • ! +`"'t ~' ~ yn ~,~-,(~y"" ~t3 ~ } y, .r~' (( ( ~ f ~ sl l-,a~ C..cl!: i~ ~ ci oV~ ~~~ t ~ ~Gt C ~ ~ ~ Rat' ! ,r~ Answered $y: ~ ecc~ ~i,~'tt~ S Printed Name Signature Date This is not an authorization to proceed with any work involving additi©nal cost and / or time. Ptotification must lae given in accordance with ContraM llocnments if any clarification, variation or Architects/Engineers responses cause any change to the Contract Documents. ~~ KUDIAK ISLANb BpROUG1~. CO~R,4,~T CHANGE dRDER 71Q MILX., I3riY RQAb KODYAK, ALASKA 49615 Contract N'o. 2008 1 x Change Order No. 4 project Name, Number & Location I~S/MS Ncw Swimming Pool Contractor Janssen Contractin Inc. Amount of Contract & Change Order O>t7iginal Contract S 11,683,895.00 previous Changes $ 10,792.08 This Change $ 9,494.53 Adjusted Contract ~ 11,704,181.61 bescription of Change Asper 12,x'1 #068 and Rp'P 006 (attached) increase thickness of Zee channels for roof parapets. Cost $ 9,494.53 The tune provided for completion of the contract is ( unchanged) ( increased) ([] decreased) by calendar days. This document shall bcc:ome an amendment to the contract and all rovisions of the contract will a l thereto. Accepted Py; Datc / ~p Contractor's Reor~sentative • Reconimcnded: -~7 ,~ ,`,~ 7 -( P'- ce- Dxtc ~ DngineeringlFacilitics Dire or `S~ND i;c 17irector ApprovedgY, ~~~ ~, •A.ttest: /-- --tiV~-ti.~ Date _~ - Manager jLess Than SIO 0 ~4 '•. • r- r erk v for nli chEinge orders ou the c • • .. , C -- ~ ? If the change order or orders exc ris t thousa - ~ ,0 dollars, it will require the signatures af~ A. The mayor and deputy presi is ~. The mayor and one (1) asscmb of the deputy presiding officer; C. The deputy presiding officer and o s ~b ember in the abscc,ce of the mayor; or D. Any two (2) assembly members in the absence of the mayor and deputy-aresidine officer. Approved By: ~ _ ~ L;'~~~~~~`'', Date `~ ~/~~ ~~~ J ayor Deputy 1'r siding Officer Revised by M1S 06/24/06 KODiAK YSLAND BOROUGH CONTRACT CHANGE ORDLR 710 MILL BAY ROAR K.ODIAK, ALASKA 99615 Contract No. 2008 18 _ Change Order No. 5 Project Name, Number & I.ocatAOn A,x~uount of Contract & Change Order 1CHS/MS New Swimming Pool Original Contract $ 11.,683,895.00 Previous Changes ~ 20,286.61 Contractor Janssen Contracting Tnc. This Change Adjusted Gon,tract $ 36,456.62 ~ 11,740,638.23 Description of Change Cost RFP #7-Changes to the attachment of the wall deck to the vertical edges where there are changes in the concrete foundation wall elcvalion. $ 1,507.28 12x1' #8-lnclude scoreboard as Contractor furnished item. $26,823.27 RFP #9-Additional edge angles. ~ 1,770.91 IZFP #] 3-Deletion of some of the light fixtures in Admin./Rcccpli~n #115 ($ 504.06) RFP #14-Additional reinforcement in retaining wall. $ 3,784.73 Rh'P ft15-Deletion of !wo type NA fixtures in the natatorium. ($ 209.04) ItFP #16-Add insulation to heal; exchangers HX-1 & HX-2 in boiler rootn. $ 3,575.21 RFP #18-Changes to door locations, added benches ~ deleted door closers. $ 291.68) The time provided for completion of the eonrract is (^ u~~changed) ( inerCatsed) ( decreased) by 3 calendar days. 't'his docuauent shall becurnC au arncnclmcnt to the contract and all provisions of the contract will apply thereto. ~ Accepted By: C'ontract/o~r'/s Reeorrunended: -_i '~(/v Approved By; [,ngineering/Facilitics 1 Manager ([.e,., T-~ o, Cpr sll cl~tingc ar on this five ~N ~ ~~ r~o . • ~~ - T. Date / d f _ y ~,=y llalc ~ ~ Date L' / -a .~~ -- If the change order or orders exceeds to sa~+ 0,000) dollars, it will require tl:e signatures of A. The ntayor and deputy presiding officer; B. The mayor and one (1) assembly member in the absence of the deputy presiding officer; C. The deputy presiding officer and one (1) assembly member in the absence of the mayor; or D, Auy twu (2) assembly members in the absence of the mayor and do ty residing officer. n Approved a3y: f ~~~~---- f / ,~ ~~ ` Date ~ ~ "~~~ ~d Revised by MIS DG/14/Ofi KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER 710 MILL. BAY ROAD KODIAK, ALASKA 99615 Contract No. 2008 18 Clone Order No. 7 Project Name, Number Location •Amount of Contract Change Order ICI-1S/MS New Swimming Pool Original Cfmtract 11,683,895.00 03119 Previous Changes 17g,680.77 Contractor This Change 109,037,53 Janssen Contracting Inc. 03 /1 Adjusted Contract 11,971,723.30 ‘.1 0 Description of Change Cost RFP 22-Perfarin electrical work indentified on the mechanical drawings, but not on the electrical drawings. 3,334.00 RFP 31- Add mixing valves per ASI-0058. 1: 2,224.41 RFP 32-Provide a credit for deletion of end walls ss railing on ends a bleachers. 1,624,61) RFP 33 Paint shiny surfaces of metal deck 4% metal studs behind wall panel in 5,4$0.94 natatorium. RFP design modification to coaching lane bridge per RFT 121. 1 2,601.27 RFP 39-Install ceiling monied transfer grilles per RH 119. 1,369.23 RFP 41-Additional site work North side of VocEd builehng. 95,652.29 i The time provided for completion of the coutractis (IE unchanged) (Ei increased) 0 decreased) by 0 calendar days. This L document shall become an amendment who contract and all provisions of the contractvill apply thereto. Accepted By: 2,7 7, ....oze,_ Date 41,,,kyloy Contivtor's R resentative t. ,..t. Date 4 7 -2( 0 7 Recommended: ,,,ro gineering/Facilities Diree 1 r .ji Approved By: et, :„L( iii f cD .,..:A.itrid), ri. 1111 I Date anager tiees ,l' rO000= -ly 17 4' for all change on thiscontrat If the .change order or orders exceeds ten r i 4 00) dollars, it 'Kill require the signatures of: A. The mayor and deputy presiding officer, B. The mayor and one (1) assembly member in the absence of the deputy pre -Wing officer, C. The deputy presiding officer and one (1) assembly member in the absence of the mayor, or D. Any 0 (2) asset. .Iy members in the absence of the mayor and deputy presiding officer. ti/ I i Approved By: 1 Lid Date q' Mayor II .uty Presi. ,1 1 ii .•1010 Revised by KS 06/14/06 IKODIAIK ISLAM BOROUGH CONTRACT CHANGE ORDER 710 MILL ]SAY ROAD KODIAIK, ALASKA 99615 Contract No. 2008 18 Change Order No. 9 Project Name, Number & Location Amount of Contract & Change Order KHS/MS New Swimming Pool Original Contract $ 11,683,895.00 03119 Previous Changes $ 448,741.39 Contractor Janssen Contracting Inc. This Change $ 3,272.56 420 -500 452 -150 03119 6 Adjusted Contract $ 12,135,908.95 ]Description of Change Cost RFP 064 - Provide & install mixing valve in lifeguard locker room. $ 838.08 RFP 065R1- Investigation of A/V system malfunction. $ 2,434.48 The time provided for completion of the contract is (z unchanged) (❑ increased) (❑ decreased) by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply thereto. Accepted By: Date - - f ingineering/Facilities o actor's Representative ND Recommended * o� Director Finance Direct r Approved By: Attest: 4 40v L e , e Manager (Less Than ,000 - Total Boro gh lerk e i for all change ordersP6 this contract) If the change order or orders exceeds ten thousand (10,000) dollars, ited� t J ' signatures of A. The mayor and deputy presiding officer; B. The mayor and one (1) assembly member in the absence of the deputy presiding officer; C. The deputy presiding officer and one (1) assembly member in the absence of the mayor; or D. Any two (2) assembly members in the absence of the mayor and deputy presiding officer. Approved By: Date 9 LZ p 14 yor Duty Presiding Officer Revised by MIS 06/14/06 A G701 ® 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 09revl OWNER: Kodiak Island Borough School District DATE: August 31, 2010 ARCHITECT: New Swimming Pool Kodiak AK CONTRACTOR: TO CONTRACTOR (7Vame and address): ARCHITECT'S PROJECT NUMBER: 3005 FIELD: ❑ Janssen Contracting Co. Inc. CONTRACT DATE: January 30, 2008 1520 Post Road CONTRACT FOR: General Construction OTHER: ❑ Anchorage, Alaska 99501 -1710 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable. any undisputed amount attributable to previously executed Construction Change Directives) includes the following RFP's - RFP 064 & 065r1 The original Contract Stun was $ 11,683,895.00 The net change by previously authorized Change Orders $ 448,741.39 The Contract Sum prior to this Change Order was $ 12,132,636.39 The Contract Sum will be increased by this Change Order in the amount of $ 3,272.56 The new Contract Sum including this Change Order will be $ 12,135,908.95 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is August 1, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ECl Hyer, Inc. Janssen Contracting Co. Inc. Kodiak Island Borough ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 101 W. Benson Blvd., Suite 306, 1520 Post Road, Anchorage, Alaska 710 Mill Bay Road, Kodiak, AK Anchorage, AK 99503 99501 - 1710 99615 - 6398 ADDRESS DDRESS -- �, ADDRE S BY (Sign ure)l 13 (Si lure) BY (Srgnature) Terry Hyer Harry T. Tibbs, Project Manager Rick Gifford. (Typed name) (Typed n me) (Typed name 8t31/I0 ! �/ 0 a2 / /U DATE DATE DATE SLANp A Q = 0 4 = r: . C Ile QIA AIA Document G701 *" — 2001. Copyright ® 1979. 1987, 200 d T� c rz MtJtute of Architects. All rights reserved. WARNING: This AIA" Cocumcml is protector, by U.S. Copyright Law and lnternatlon ea.ie . Unr. ad reproduction or distrtpution of this AIA" Cucument, or any potion of . It, muy result In sevem civil and criminal penalties, and w;n ,.osecuted to the maximcrn extent Poesibie undur the law. This document was produced by AIA software at 15:32:27 on 08/31/2010 under Order No.1546466275 1 which expires on 08120/2011, and is not for resale. User Notes: (1866689370) JANSSEN CONTRACTING COMPANY, INC. TITLE AND LOCATION: New Kodiak Swimming Pool RFP #: RFP -064 OWNER: Kodiak Island Borough Ken Smith DATE: 5/5/10 CONTRACTOR: Janssen Contracting Co Inc CONTRACT NO: 3119 ARCHITECT: ECI / Hyer, Inc. Jae Shin RFI DESCRIPTION OF WORK: Add new mixing valve to P -6 fixture in lifeguard room. SUBCONTRACTOR'S: Mat. /Labor O & P % A Tundra P &H $ 671.30$ — � 1°OQ:7o 15% (Subcontractor Cost) B 15% (Subcontractor Cost) i C 14 - t 15% (Subcontractor Cost) D $ - ;$ 15% (Subcontractor Cost) E $ $ - 15% (Subcontractor Cost) F SUB TOTAL LINES A - E: 377 - 671 30` �$4 = : �t;00 CONTRACTOR'S: Mat. /Labor O & P G MATERIALS: I �$ . - 15% .t H LABOR: R$ - " 15% i I EQUIPMENT AND TOOLS: I $ - ( 15% 11 MISCELLANEOUS: ;$ - 15% J SUB TOTAL LINES G - I: 17 7-77-71, 7$f K CONTRACTOR MARK UP 8% ON SUBCONTRACTOR TOTAL COSTS: .$LT J5� L7�0 8% GRAND TOTALS: L SUBTOTAL; LINES A - K: "� 671330 t$� -1[54 M BOND COST: SUB TOTAL 1.5% OF LINE L h$ %. _' "23 9,5 N GRAND TOTAL - LINES L & M: r r 18_38:08;; O TOTAL COST PROPOSAL$? ; 838 108 . ; NOTES: CONTRACTOR REPRESENTATIVE: Tom Tibbs TITLE: Project manager GIBS® NEW SWIMMM POOL REQUEST FOR PROPOSAL PROJECT MANAGER: Ken Smith, PE RFP NO: 64 ARCHITECT /ENGINEER: ECI /flyer, Inc. DATE: 01/15/10 CONTRACTOR: Janssen Contracting Co., RELATED Inc. DOCUMENT: DIRECTION TO CONTRACTOR: Within Ten (10) calendar days, please submit an itemized proposal to make the following changes to the Contract. A response is required even if you do not anticipate a change to the Contract Time or Sum by this Request for Proposal. This document does not constitute a Notice to Proceed by the Owner. DESCRIPTION OF PROPOSED CHANGE: Please provide a proposal to add the following: In the Lifeguard Locker Room, provide a CW & HW thermostatic mixing valve to shower P -4. Provide access for the mixing valve. Utilize one of the installed CW or HW pipes to serve as the single tempered water (TW) pipe to the shower. Cap & abandon the other pipe in place. Provide Powers mixing valve as shown in the attached mfr cut sheet, or approved equal. Set TW temperature to 105 degrees F. Mount valve upright. REASON FOR CHANGE: COMMENTS: 3 pages total, 1/15/10 APPROVAL AND REVIEW: Action Company Signature Date Architect /Engineer Representative Review ECI /Hyer Project Manager Recommendation for Approval Ken Smith, PE DISTRIBUTION after approval: ® Architect /Engineer Contractor ® Owner ❑ File tJ O �"/ V"/ EIl 11S� o •' e l-IVDR000ARD® Series LM490 Thermostatic Ternpering Valves for Hot Water D istribution fP ireducctk SpeCE noattooml Features ® _ WT, • Advanced thermal actuator improves performance at low flow _Vi Solid �> r t 1 • brass construction enhances durability: -;tom � ��' �; ••,�.�,- �-,''� • Adjustable temperature selection with lack down • Union connections for easy maintenance �; .ft�,,�, , ..,,,. •:,... ,� 5.: �' • Integral checks and screen prevents cross -flow and contamination • Available in 1 / 2", 3 /4, 1" 15 20 25mm with NPT, Sweat PEX 4uick- Connect and CPVC union connections a Specifications m �" `s `"' ` i . A9SE Advanced Thermal AcWWn Temperature Adjustment: Series LM490 90° -160° F (32° C to 71 ° C) Series LM490 -10 60 120° F (16° C to 49° C) Approach Temperature: 5 °F (3°C) above set point Check Valves: Integral Max. Operating Pressure: 125 psi (861 kPa) Construction: Cast Brass Body Max. Hot Water Temperature: 200 °F (93 °C) Approval: CSA 8125 Certified Minimum Flow: 0.5 gpm (1.90 Ipm) when tested in accordance Listing: ASSE 1017 with ASSE 1017 -2003 U NION CONNMIONS Female NPT Sweat CPVC PEX Quick - Connect 1/2" 3/4" 1" 1/2" 3/4" 1' 1/2" 3/4" 1" 1/2" 3/4" 1" 1/2" 3/4" 1" (15) (20) (25) (15) (20) (25) (15) (20) (25) (15) (20) (25) (15) (20) (25) LM490 -1 LM491 -1 LM492 -1 LM490 -2 LM491 -2 LM492 -2 LM490 -3 LM491 -3 LM492 -3 LM490 -4 LM491 -4 LM492 -4 LM490 -5 LM491 -5 LM492 -5 LM490 -101 LM491 -101 LM492 -101 LM490-102 LM491 -102 LM492 -102 LM490.103 LM491 -103 LM492 -103 LM490.104 LM491 -104 LM492 -104 LM490.105 LM491 -105 LM492 -105 Capacity o 'r�tSURE DROP Jk O ITHE VALVE (CV)1 psi 5psi 10psi 15psi 20psi 30psi 45psi 60psi (7 kPa) (34 kPa) (69 kPa) (103 kPa) (138 kPa) (207 kPa) (310 kPo) (414 kPa) 3.42 7.6 gpm 11.0 gpm 13.0 gpm 15.0 gpm 19.0 gpm 23.0 gpm 27.0 gprn (29lpm) (421pm) (49lpm) (571pm) (721pm) (871pm) (1021pm) POWERS - www.powerscontrols.com f I Dimensions o Model LM4904 LM491 -1 LM492 -1 LM490 -2 LM491.2 LM492 -2 LM490 -3 LM491 -3 LM492 -3 LM490.4 LM4914 LM492 -4 LMM101 LIMO -101 LM492 -101 LM490.102 LM491 -IM LM492 -102 LM490.103 LM491 -103 LM492 -103 LM490 -104 LM491 -104 LM492 -104 1/Y' NPT 3/4" NPT V NPT Connections Female Female Female 1/Z" Sweat 3/4" Sweat 1 "Sweat 1/T' CPVC 319" CPVC 1 °CPVC 1/Z PEX 314 "PIX 1 "PIX 4 -7/8 4 -7/8 5 -5/16 4 -13/16 5 -5/16 5.13/16 4 -3/4 5 -1/4 5 -11/16 5.1/4 5 -1/2 5 -7/8 (124mm) (124mm) 035mm) I (123mm) (135mm) (148mm) (121 mm) (133mm) (144mm) (133mm) (140mm) 049mm) °B „ 5- 7/16 5-7116 5 -5/8 5 -3/8 5 -5/8 5 -7/8 5 -5/16 5.9116 5 -13/16 5.9116 5 -11/16 5 -7/8 037mm) 037mm) 043mm) (137mm) 043mm) 049mm) 036mm) 042mm) 047mm) 042mm) 1145mm) (150mm) "C° 3 -3/16 3 -3 3.3/8 3 -1/8 3 -3/8 3 -5/8 3 -1/16 3 -5/16 3 9/18 35118 3 -7/16 3 -5/8 (80mm) (80mm) (86mm) (80mm) (86mm) 192mm) (79mm) (85mm) (90mm) (85mm) (88mm) (93mm) Model LM490 -5 LM401 -5 L.M492 -5 LM49D.105 LM491 -105 LM492 -105 I Connections Quick -Co / nect Quick- Connect Quick- Connect Ha Wafer 1"let „ 6-5/8 6 -15/16 7 -1/8 Coldwaiertnlet (168mm) 077mm) (181mm) Note: 7 6 -1/4 6 -7/16 6 -1/2 Dimensions are shown 11/4" e I I i 059mm) (163mm) 065mm) Dimensions in brackets are In mm 4 4- 3/16 4-1/4 c I 002mm) 006mm) 008mm) TenpaM outlet Ordering Information m Model LM49 � - F] F-1 (900 160 0F) (32 °C - 71 °C) --- Model LM49 10— 2 0 (60 - 120° F) Valve (16 °C - 49 °C) 1/ 2" ......................... .I............................. 0 3/ 4 .......................... ............................... 1 1" ........................... ............................... 2 Inlets Union NPT Female ........... ............................... 1 Cabinet & Piping UnionSweat ................. ............................... 2 .... ............................... 0 None Union CPVC ................. ............................... 3 ............... A Stainless Steel, Recessed Union PD( ................... ............................... 4 B............. Stainless Steel, Wall Mount Quick - Connect ............... ............................... 5 E ..........Stainless Steel, Semi - Recessed Checkstops (Pairs) P ................ s Mo None ...................................................... 0 .P .... ainted, Semi-Recessed d D Paint, Wa M o 1/2" Straight, NPT (LlV1490 -1 & LM490.101 only) ................ A F ................. 1/2" Straight, Sweat (LM490 -1 & LM490 -101 only) .............. C 1/2" Angled, Sweat (LM490 -1 & LM490 -101 only) ............... D Checks come standard Typical Specification o Thermostatic tempering valve shall be constructed of solid brass. The valve shall feature advanced paraffin -based actuation technology and union connections for ease of maintenance. All internal components shall be corrosion - resistant. Valve shall feature integral checks to prevent cross -flow and inlet screens to filter out debris. The valve shall be CSA B125 certified and ASSE 1017 listed. Capacity of the valve shall be 23.0 gpm (87.0 Ipm) at 45psi (310 kPa) differential. Valve shall perform to a minimum flow of 0.5 gpm (2 Ipm) to ASSE 1017 -2003. Control temperature shall be adjustable Project: between 90 - 160 °F (32 - 71eC) for LM 490 and 60 -120 °F (16 - 49 °C) for LM490 -10 Series.The valve Contractor: shall feature a vandal - resistant lockable handle to prevent tampering. The valve shall be a Powers ArchitecVEngineer: HydroGuard Model LM490 ( LM491 ( 20mm), LM492 (1 ", 25mm), LM490 -10 (1 /2 ",15mm), LM491 -10 ( /4", 20mm) or LM492 -10 0 ", 25mm). Any alternate must have a written approval prior to bidding. �/�� �0 l"/ l�/ EfSTM o 9001 CERTIFlED a division of Watts Wafer Technologies, Inc. usA: Phone: 1 .800.669,6430 • Fax 1.847.229.0526 • www.powerscontrois.axn Canada: Phone: 1.888.208.8927 • Fax 1.888.882.1979 • www.powerscontrols.ca ES- P- LM490_LM490 -10 0802 0 2008 Powers I PROPOSAL JANSSEN CONTRACTING COMPANY, INC. TITLE AND LOCATION: New Kodiak Swimming Pool RFP #: 65R1 OWNER: Kodiak Island Borough Ken Smith DATE: 4/30/10 CONTRACTOR: Janssen Contracting Cc Inc CONTRACT NO: 3119 ARCHITECT: ECI / Hyer, Inc. Jae Shin RFI DESCRIPTION OF WORK: Cost to investigate damaged amp that was found to be ruined by the user. Backup previous sent. SUBCONTRACTOR'S: MatJLabor O & P A investigation cost from 3 way elect $ 1,950.00 $ . 292:50 ; 15% (Subcontractor Cost) f B - � ` (Subcontractor Cost) t $ 15% C i $ - 15% (Subcontractor Cost) D $ 15% (Subcontractor Cost) E $ - 1`$ - 15% (Subcontractor Cost), F SUB TOTAL LINES A - E = ' T L2925 0; CONTRACTOR'S: Mat. /Labor O & P G MATERIALS: F$ �' ` 4 15% H LABOR: $ -: } 15% i I EQUIPMENT AND TOOLS: ($ - 15% 11 MISCELLANEOUS: 15% J SUB TOTAL LINES G - l: 11 _ _ 7 - , �, - ; j - r K CONTRACTOR MARK UP 8% ON SUBCONTRACTOR TOTAL COSTS: LS ' 15 8% GRAND TOTALS: L SUBTOTAL; LINES A - K: lsr?ln950 ?00I ; _448 Ok M BOND COST: SUB TOTAL 1.5% OF LINE L; N GRAND TOTAL - LINES L & M: "_t 2;434!48] O }� 2;434:48] NOTES: CONTRACTOR REPRESENTATIVE: Tom Tibbs TITLE: Project manager I �.Pv A 34� 1Y ELECTIRIC OF ALASKA, INC. J F 129 Whitney Road o Anchorage, Alaska 99501 ��� 1 lone: (907) 277 -1694 c Fax: (907) 277-0623 COMMERCIAL January 25, 2010 Janssen Contracting Company 1520 Post Road Anchorage, Alaska 99501 Attn: Tom Tibbs Re: Kodiak Swimming Pool Dear Tom, We requested ATS Alaska to go to Kodi c and troubleshoot the pool stereo problems. When ATS got on site they discovered that son :one had tried to rewire the amplifier (we assume in an effort to increase the volume output, whi - ti was pre -set at the maximum setting that the speakers can handle), and in doing so, they damag d the amplifier, The cost for this trip to troubleshoot the - •oblem is $2,242:50. Please see attached for cost breakdown.: ease let me know if you have any questions. Thank you, David L. Dorland I I Data- I Comm Indust TSCrrPiNECA 11101 3-WAY ELECTRIC OF ALASKA, INC '- KODIAK SWIMMING POOL 229 WHITNEY ROAD ANCHORAGE, ALASKA 99501 01125/10 1 j 5dtl TROUBLESHOOT STEREO - Y. , -T Phone 307) 277-1694 FAX: (907) 277-0623 L 03:17 PM R Zoo i io t 1 MATERIAL TOTAL: Mat Tot 1.950.00 1.00 1,950.00 2 SUBTOTAL 1.950.00 3 ..— ................ I 4 *DIRECT LABOR: 5 AVERAGE RATE Lab Tot 0.00 70.91 1 6 GENERAL FOREMEN Ca'c 0.00 72.901 7 SUBTOTAL 9 TOOLS EXPENDABLE Mal Tot 1,950.00 % 10 SUBTOTAL 11 12 j03 SUBTOTAL 1,950.0c 3 14 'MARKUPS /OVERHEAD: 15 OVERHEAD Line 12 1,950.00 1 /3 16.00 292.50 16 JOB TOTAL 2,242—AC 17 > 18 PROFIT Line 16 2,242.50 'c 19 J09 TOTAL 4 PROFIT Line 18 I 0.00 I 1.00 2,242.50 20 21 BID TOTAL I 2.242.50 f I �� I KIBS® NEW S!AlUMMING POOL REQUEST FOR PROPOSAL PROJECT MANAGER: Ken Smith, PE RFP NO: 65 Rev1 ARCHITECT /ENGINEER: ECI /flyer, Inc. DATE: 4130110 CONTRACTOR: Janssen Contracting Co., RELATED Inc. DOCUMENT: DIRECTION TO CONTRACTOR: Within Ten (10) calendar days, please submit an itemized proposal to make the following changes to the Contract. A response is required even if you do not anticipate a change to the Contract Time or Sum by this Request for Proposal. This document does not constitute a Notice to Proceed by the Owner. DESCRIPTION OF PROPOSED CHANGE: Please provide a proposal for your efforts for investigation of the AN system amplifier malfunction. REASON FOR CHANGE: COMMENTS: This RFP revised to include only the investigative portion which has already been completed. Repair /replace of the amplifier to be owner's responsibility APPROVAL AND REVIEW: Action Company Signature Date Architect /Engineer Representative Review ECI /flyer 4/30/10 Project Manager Recommendation for Approval Ken Smith, PE P P.E. at 10:49 am, Aug 27, 2090 DISTRIBUTION after approval: ® Architect /Engineer ® Contractor ® Owner ❑ File