Contract No. 1992-11ITEM NO./,�, tq , /, Kodiak /s/and Borough AGENDA STATEMENT Meeting of: April 16, 1992 i 'ZV7 fra e 0 92-/l ITEM TITLE: Contract Award - High School Alteration Project, Phase II, KIB - 410 - 451 SUMMARY STATEMENT Bids were received and opened March 31, 1992 at 3:00 p.m. for the construction of the High School Alteration Project, Phase II to be constructed this summer. Jay -Brant General Contractors is the low bidder for the project. Recommend award of the contract for construction of the High School Alterations Project, Phase II, KIB 410 - 451 to Jay -Brant General Contractors in an amount not to exceed $469,200 for the Base Bid plus Alternate # 1. FISCAL NOTES I ] N/A Expenditure Account Required $ 469,200 No 410-451-452-150-038-005 APPROVAL FOR AGENDA: Mayor RECOMMENDED ACTION: Kodiak Island Borough MEMORANDUM April 6, 1992 To: Assemblymembers Thru: Jerome M. Selby, Mayor Fm: Ray Camardella, Director��' Engineering/Facilities Re: High school Alteration Project - Phase II Bid Award Bids were opened on March 31, 1992 at 3:00 p.m. in the Borough conference room for the High School Alteration Project - Phase II. Nine bids were submitted for the project, with three of the bidders filling out the bid schedule incorrectly as noted on the attached bid tabulation sheet. Two of the contractors that bid incorrectly, H. Watt & Scott, Inc. and Gaston & Associates, Inc. asked that their bids be withdrawn when questioned as to the validity of the submitted schedule. Brechan Enterprises, Inc. has asked that their bid be allowed to be corrected as noted in their attached letter dated March 31, 1992. Correction of Brechan's bid would make their total for the base bid plus alternate #1 $491,683. The low bidder for the project is Jay -Brant General Contractors of Homer, Alaska with a bid of $469,200 for the base bid plus alternate #l. I asked for an attorney's opinion on the legal aspects of recommending the bid award due to the bid errors and the potential for local preference by the Assembly. Attached you will find the legal opinion by Mr. William M. Walker, attorney with Hughes, Thorsness, Gantz, Powell, & Brundin regarding these issues and recommending the award be made to Jay -Brant General Contractors. Prior notice of the local bidders preference was not given to the bidders in either the solicitation or contract specification. cc: file GASTON & AS80CIATES, INC. GENERAL ComAcmn 8811 Hartzell Road Anchorage, Alaska 99507 contractor's Lleeme OA13750 Fax (907) 349-8691 Phone (907) 3441717 MARCS 31, 1992 OFFICE OF THE KAYUf1 KODAK ISLAND BOROUGH 710 MILL SAY ROAD RODIAK, ALAKSA 99815-6398 ATTN: RAY CAN ARD ELLA REFE-RENCE: BID PROPOSAL FOR RIGH SCHOOL ALTERATION PROi:HCT PROJECT NO. XrB - 410 - 45: SUBJECT: WITHDRAWL DUE TO ERROR DEAR MR. CAMARDELLA GASTON & ASSOCIATES, INC. HE:jcBY WZ71M.RANS THEIR BID ON T&e :UC�JE REFERENCED PROJECT DUX TO AN ERROR ox TSS SID SCSEDVZZ . n:D SCHEDULE ITEM 8 LISTED OUR PRICE 80R THE ALTERNATE ONLY AND NOT TEE COMBINED AMOUNT SOX TV& "BASE SID PLUS kLATERNAT3 70. i" AS REQUESTED. SINCERRELY, -L/, e, / (/'� H. LEE ?EDERSON VICE PR8SIDZNT PPP PROPOSAL ZODIAS WITHDRAWL BRECHAN ENTERPRISES, INC./ GENERAL CONTRACTORS 2705 Mill Bay Road • Kodiak, Alaska 99615 March 31, 1992 Honorable Jerome Selbv. Mayor Kodiak Island Borough 710 Mill Bay Road Kodiak, AK 99615 RE: Kodiak High School Alteration Phase II Project No. KIB - 410 - 451 Dear Sirs: This letter is to advise you that we made a clerical error in the preparation of the bid which opened at 3:00 P.M. today. Attached herewith is the job cost sheet prepared by Mr. Grant deLine for the above referenced project. You will note on the second page that it indicates Base 375,782, Alt 115,901 and carrot symbol for the sum of the two numbers. Our secretary mistakenly entered the alternate price instead of the sum. As the general provisions provide for the correction of clerical error, we hereby request that you consider our Bid for the Base plus the Alternate at the sum of $491,683. AS the bid preparation documents are confidential in nature, we would request that you preserve their integrity. Sincerely yours, BRECHAN ENTERPRISES, INC. ch el rAehZan President Enclosure MCB/css BRECHAN ENTERPRISES, INc.IGENERAL CONTRACTORS • 2705 Mill Bay Road, Kodiak, Alaska 99815 Ph. (907) 4883215 • FAX (907) 4864889 Alaska Business License #001858 • Alaska Contractors License #AA441 We Aro An Equal Opportunity Employer p TO: KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, AK 99615 ATTN: Resident Project Rep. CONTRACTOR'S CERTIFICATION OF COMPLETION DATE 11-4-92 PROJECT KODIAK HIGH SCHOOL — PHASE II JOB NO. 410-451 CONTRACT N0. C92-011 OWNER KODIAK ISLAND BOROUGH FROM: JAY—BRANT GENERAL CONTRACTORS (Firm or Corporation) This is to certify that 1, BOB BRANT am an authorized official of JAY—BRANT GENERAL CONTRACTORS working in the capacity of PARTNER and have been properly authorized, by said firm or corporation to sign the following statements pertaining to the subject contract: I knowof my own personal knowledge, and do hereby certify, that the work of the contract described above has been performed, and materials used and installed in every particular, in accordance with, and in conformity to, the contract drawings and specifications. The contract work is now complete in all parts and requirements, and ready for your final inspection. I understand that neither the determination by the Engineer -Architect that the work is complete, nor the acceptance thereof by the Owner, shall operate as a bar"to claim against the Contractor under the terms of the guarantee provisions of the contract documents. By R.J. BRANT TITLE PARTNE FOR JAY—BRANT GENERAL CONTRACTORS DISTRIBUTION: 1. Proi. Mgr. ' 2. Field Ofc. 3. File 00671 CONTRACTOR'S CERTIFICATE OF COMPLETION Page 1 of 1 rC I ti :0 C 11 � RELRASE ON CONTRACTS Whereas, by the terms of contract dated 28 APRIL 19392 entered into by the Kodiak Island Borough (hereinafter referred to as the Contracting Agency), and JAY -BRANT GENERAL CONTRACTORS (hereinafter referred to as the Contractor), in the amount of FOUR HUNDRED EIGHTY-EIGHT THOUSAND TWO HUNDRED EIGHTEEN DOLLARS$ 488,218.00 ) including any/or all executed Change Orders for the construction of KODIAK HIGH SCHOOL - PHASE II project at , Alaska, IT IS PROVIDED THAT: Upon Completion of all work required hereunder, the amount due the Contractor under this Contract shall be paid upon the presentation of a properly executed and duly certified voucher therefore, after the Contractor shall have furnished the Contracting Officer with a release of all claims against the Contracting Agency arising under and by virtue of this Contract other than such claims, if any, as may be specifically excepted by the Contractor from the operation -of the release in stated amounts to be set therein. NOW THEREFORE, in consideration of the payment by the Contracting Agency to the Contractor of the balance due under the Contract to wit the sum of FIFTY-ONE THOUSAND FIVE HUNDRED TWENTY-NINE DOLLARS --------T ($51,529.00 ), the Contractor hereby remises, releases, and forever discharges the Contracting Agency, its architects, engineers, agents, employees, and independent contractors of and from all manner of debts, dues, and sum or sums or money, accounts, claims, and demands whatsoever, in law and. in equity, under or by virtue of said contract, and warrants good title to all material, suppliers, and equipment installed or incorporated in the project and all work delivered to the premises, together with all improvements and appurtenances constructed thereon, to the Contracting Agency free of any claims, liens or that neither it nor any person, firm, or corporation furnishing material or labor for any work covered by this Contract has any right to a lien upon the premises nor any improvement thereon, except: NONE The Contractor further certifies that all Federal, State and Local taxes incurred in the performance of this contract, including but not limited to withholding and employment security taxes, have been paid. IN WITNESS THEREOF, the hand and seal of the Contractor have been hereunto set this FOURTH day of NOVEMBER , 19392 . BY: JAY -BRANT GENERAL CONTRACTORS R.J. BRANT JR. (Siatu a of C actor) 006& RELEASE ON CONTRACTS Page 1 of 1 KODIAK i$LAND BOROUGH PERIODIC ESTIMATE 710 MILL BAY ROAD BASIC CONTRACT FOR KODIAK, ALASKA 99615 PARTIAL PAYMENT Name and Location of Project: KODIAK HIGH SCHOOL RENO. - PHASE II Project No. 410-4 Name of Contractor JAY -BRANT GEN. CONT'RS Address HOMER, ALASKA Contract No. C92-011 Periodic Estimate No. THREEfor Period 8-24 1992 to 11-4 1992 Time of Contract -- Calendar Days Completion Date AUG 20, 92 Item Description of Work Contract Previous This Completed Balance No. Amount Applications Application To Date To Finish Material Labor 1. MOBILIZATION 48,799 48,000 799 0 48,799 0 2. DEMOLITION 27,490 27,490 0 0 27,490 0 3. CARPENTRY 33,406 33,406 0 0 33,406 0 4. FRAMES & DOORS 12,223 12,223 -0 0 12,223 0 5. DOOR HARDWARE 7,143 7,143 0 0 7,143 0 6. GLAZING 8,674 8,674 0 0 8,674 0 7. CEILING & FLOORS 51,108 51,108 0 0 51,108 0 8. GWB & PAINTING 18,137 18,137 0 0 18,137 0 9. CHALK/TACKBOARDS 6,677 6,677 0 0 6,677 0 10. GYM PADS & CURTAII 30,607 30,607 0 0 30,607 0 11. CABINETS & APPL'S 26,235 26,235 0 0 26,235 0 12. MECHANICAL -ROUGH 50,859 50,859 0 0 50,859 0 13. FINISH 15,000 15,000 0 0 15,000 0 14. ELECTRICAL -ROUGH 35,549 35,549 0 0 35,549 0 15. FINISH 19,000 19,000 0 0 19,000 0 MEZZANINE 16. FRAME & CONCRETE 52,035 40,000 12,035 0 52,035 0 17. GWB AND PAINT 7,312 0 7,312 0 7,312 0 18. MECHANICAL 9,740 9,740 0 0 9,740 0 19. ELECTRICAL 9,206 6,000 3,206 0 9,206 0 ----------------------------------------------------------------------------------------- TOTALS 469,200 1 445,848 23,352 0 1 469,200 1 0 UU541 Periodic Estimate for Partial Payment 2� z, )JIIWyPage 1 of 3 KODW ISLAND BOROUGH PERIODIC ESTIMATE 710 HILL BAY ROAD CHANGE ORDER NO. FOR KODIAK, ALASKA 99615 PARTIAL PAYMENT Name and Location of Project•KODIAK HIGH SCHOOL RENOVATION -PH. Il Project No.410-4 Name of Contractor JAY -BRANT GEN. CONTRACTORSAddress HOMER, ALASKA Contract No. C92-011 Periodic Estimate No.THREE for Period 8-24 1992 to 11-4 19 92 Time of Change Order 30 Calendar Days Adjusted Completion Date 9-20-92 Item) Description of Work 1 Contract) Previous I PP This I CompletedI Balance I Amount Applications A lication To Date To Finish Material I Labor ----------------------------------- -------------------------- --- ------------------------- - 19,018 0 TOTALS 119,018 ( 13,825 I - 00541 - Periodic Estimate for Partial Payment #tr i'(!(�f._ Page 2 of 3 13,025 25 15,1931 0 2( RFP'S #11 -##020 115,193 1 1- I -1 0 ----------------------------------- -------------------------- --- ------------------------- - 19,018 0 TOTALS 119,018 ( 13,825 I - 00541 - Periodic Estimate for Partial Payment #tr i'(!(�f._ Page 2 of 3 Name and Location of Project: KODIAK HIGH SCHOOL - PH. II Project No. 410-451 Periodic Pay Estimate No. THREE - FINAL 1. Basic Contract Amount 469,200 2. Total Amount of Change Orders 19,018 3. Adjusted Contract Amount 488,218 4. Analysis of Work Performed a. Total Work Completed to Date .................................... b. Total of Change Orders Completed to Date ........................ c. Subtotal........................................................ d. Less 0 R Retained .............................................. 19.018 488,218 N e. Less Previous Payments .......................................... 436,689 f. Amount Payable this Estimate .................................... 51,529 5. Time of Contract a. Time of Basic Contract calendar days: Completion Date: 8- b. Total time of Change Orders 30 calendar days: Adjusted Completion Date 9-20-92 CERTIFICATION OF CONTRACTOR: I certify that all items and amounts are correct in accordance with the contract requirements and that the undersigned have complied with the labor provisions of said contract, or that there is an honest dispute with respect to such provisions, and that all items have been paid for which previous Certificates for payment were issued and payments received,1and tt t the current payment is now due. " _c Contractor's Signature J. Project Inspector Facility Coordinator Contracting Officer Date 11-4-92 Date Date 1� //W f L Date Date 7 2_ 00541 Periodic Estimate for Partial Payment Page 3 of 3 KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. CONTRACT CHANGE ORDER Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract ' - Previous Changes Contractor - - - This Change -- Adjusted Contract Description of Change Cost The time provided for completion of the contract is (unchangad)iin mesad) (domwed) by calendar days This document shall become an amendment to the contract and all provisions of the contract will apply thereto Accepted By: - Contractor's Representative Date ---- Recommended: Facility Coordinator Data - Approved By: Contracting Officer Date Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, ALASKA 99613 vrolect Name, Numoor & Location GG"E'N CONTRA_CTRS_ 9_07 _235_8731 P.02 I CONTRACT CHANGE ORDER Cu"La6l Nv. 9%—�� 1 Change Greer Pio Y.. 1 KODIAK HIGH SCIiOOL ALTERATIONS, PHASE II KODIAK AK KIR-410-451 Contractor JAY—BRANT GENBRAL CONTRACTORS 460 G1311HSTAHE HOMER AK 99603 --- Amount Of Contract & Change OrOers Original Contract $ 469,200 Previous ChahgOs —0— This Change 13,825 I Adjusted Contract 4831025 1 Descriptl0n Of Change �^ Coat INSTALL MAINTENANCE PLATFORM IN NEW HOME EC ROOM $ 2,957 CABINET UNIT HEATER RELOCATE, RM 109 11014 VENTILATION CONTROLS, RMS 102 — 104 1,925 FURR OUT SOUTH WALL, RM 104, TO ACCOMODATE PLUMBING 2,909 MEZZANINE AREAr BEAM RELOCATE 1,819 "J" BEAD FOR TOP OF DRYWALL 367 BLOCK pRL*FARATION FOR PAINTING (BLOCKFSLL). 515 MOVE LIGHTS UNDER MR77ANTNr 1,745 STAIN DOORS 574 CONTRACT EXTLNSION FROM AUG 20 TO SEPT. 20, 1992 N/A TOTAL CHANGE ORDER $13825 The time provided /or eomp/edan bataAe &A$00baleen to Na eon ACCOP140 dYl Co rac is Rawmmended i7F& Facility Approved By: Contracting OffICer Copies• Orloirial to Ficlilly COOrdlnatpl Canary to COnlraClot pink to PF6180 inaeaetor by 31 'S bate SEPTEMBER 9, 1992 Date 4— 9 - %�- Date T� / THIS CONTRACT, made the Kodiak Island Mayor, party of the Alaska. OWNER - GENERAL CONTRACTOR C O N T R A C T this 28 day of Borough, acting first part, and. APRIL A.D., 1� by and through JAY -BRANT GENERAL CONTRACTORS r 4 RECEIVED APR 29 1992 BmffiW"h PARTNERSHIP A MRRQRRTXQN, jx%0xpNxRtmd under the laws of the State of Alaska its successors and assigns, party of the second part, hereinafter called the Contractor. WITNESSETH: That the Contractor, for and in consideration of the payment or payments herein specified and agreed to by the party of the first part, hereby covenants and agrees to furnish and install all the materials and to do and perform all the work and labor required in the construction of the High school Alteration Project, Phase II, Project KID - 410 - 451 in the Kodiak Island Borough, Kodiak, Alaska, for the sum of Dollars ($469,200 )• The Contractor further covenants and agrees that the entire construction shall be done under the administration and to the complete satisfaction of the Kodiak Island Borough subject to inspection at all time and approval by any participating agency of the Government of the United States of America, and in accordance with the laws of the State of Alaska and rules and regulation of said Federal Agency. The Contractor further covenants and agrees that all of said work and labor shall be done and performed in the best and most workmanlike manner and that all and every of said materials and labor shall be in strict and entire conformity in every respect with the Contract documents: that he will abide by and perform all stipulations, covenants, and agreements specified in said Contract documents, all of which are by reference hereby made a part of this Contract, as to all premises therein: and in case any of said materials or labor shall be rejected by the Borough Mayor or his assistant or authorized representative, as defective or unsuitable, then the said materials shall be removed or replaced with other approved materials and the said labor shall be done anew, to the satisfaction and the approval of the Borough Mayor or his representatives, at the cost and expense of the Contractor. The Contractor further covenants and agrees that all of said materials shall be furnished and delivered and all and every of the said labor shall be done and performed, in every respect, to the satisfaction of the herein aforementioned Borough Mayor, on or before August 20, 1992. It is expressly understood and agreed that in case of the failure on the part of the Contractor for any reason, except with the written consent of the Borough Mayor, to complete the furnishing and delivery of said materials and the 532SP 'age 1 of 3 doing and performance of the said work before the aforesaid date, the party of the first part shall have he right to deduct from any monies due or which may become due the Contractor, or if no monies shall be due, the party of the first part shall have the right to deduct from any monies due or which may become due the Contractor, or if no monies shall be due, the party of the first part shall have the right to recover said deduction to be made, or said sum to be recovered not as penalty, but as damages. Provided, however that upon receipt of written notice from the Contractor of the existence of causes over which said Contractor has no control and which must delay the completion of said work, the Borough Mayor may at his discretion, extend the period hereinbefore specified for the completion of the said work, and in such case the Contractor shall become liable for said liquidated damages for delays commencing from the date on which said extended period shall expire. It is distinctly understood and agreed that no claim for additional work or materials, not specifically herein provided, done or furnished by the Contractor, will be allowed by the Borough Mayor, nor shall the Contractor do any work or furnish any material not covered by this contract, unless such work is ordered in writing by the Borough Mayor. In no event shall the Contractor incur any liability by reason of any verbal directions or instructions that he may be given by the Borough Mayor, or his representatives, nor will the said party of the first part be liable for any materials furnished or used, or for any work or labor done, unless said materials, work or labor are required by said Contractor on written order furnished by the Borough Mayor. Any such work or materials which may be done or furnished by the Contractor without written order first being given shall be at the said Contractor's own risk, cost and expense and he hereby covenants and agrees that without such written order he shall make no claim for compensation for work or materials so done or furnished. Any dispute arising under this contract which is not disposed of by agreement between the Contractor and the Project Manager shall, at the request of the Contractor, be decided by the Contracting Officer who shall reduce his decision in writing and mail or otherwise furnish a copy thereof, to the Contractor. The Contracting Officer reserves the right to make written request to the Contractor at any time for any additional information needed to make his decision. The decision of the Contracting Officer shall be final and conclusive unless, within 30 days from the date of receipt of such copy, the Contractor mails or otherwise furnishes to the Kodiak Island Borough Assembly, a written appeal. The Notice of Appeal shall include specific exceptions to the Contracting Officer's Decision, including specific provisions of the contract relied upon. General Assertions that the Contracting Officer's Decision is contrary to law or, to fact, are not sufficient. The decision of the Kodiak Island Borough Assembly shall be rendered within 120 days of the Notice of Appeal. The decision 532SP Page 2 of 3 shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, or capricious, or arbitrary, or so grossly erroneous as necessarily to imply bad faith. The Disputes article does not preclude consideration of questions of law in connection with decisions provided for above. Nothing in this contract, however, shall be -construed as making final the decisions of the Kodiak Island Borough Assembly or its representative on a question of law. At all times during the time that a dispute is pending and in the process of being resolved or decided, the Contractor shall proceed diligently with the work so as to achieve, if a all possible, performance of the work within the contract allotted time. The Contractor hereby agrees to receive the prices set forth in the proposal as full compensation for furnishing all the materials and labor which may be required in the prosecution and completion of the whole work to be done under this contract, and in all respects to complete said contract to the satisfaction of the Borough Mayor. It is further distinctly agreed that the said Contractor shall not assign this contract, nor any part thereof, nor any right to any of the monies to be paid him hereunder, nor shall any part of the work be done or materials furnished under this contract. The bonds given by the Contractor in the sum of 50% Payment Bond, and 50%, Performance Bond, to secure the proper compliance with the terms and provisions of this contract, are hereto attached and made part thereof. IN WITNESS WHEREOF, The Kodiak Island Borough Mayor, by authority in him vested, has executed this contract on behalf of the Kodiak Island Borough, and the said has hereunto set their hands and seals, the day and year first above written. KODIAK ISLAND BOROUGH By B ough Mayor By Eng ing/Facilities Director ATTEST: By (20-n tc Borough Clerk 532SP 'age 3 of 3 CONTRACTOR JAY -BRANT GENERAL CONTRACTORS ITEM NO. /.?, R. /, Kodiak /s/and Borough AGENDA STATEMENT Meeting of: April 16, 1992 ITEM TITLE: Contract Award - High School Alteration Project, Phase II, KIB - 410 - 451 SUMMARY STATEMENT Bids were received and opened March 31, 1992 at 3:00 p.m. for the construction of the High School Alteration Project, Phase II to be constructed this summer. Jay -Brant General Contractors is the low bidder for the project. Recommend award of the contract for construction of the High School Alterations Project, Phase II, KIB 410 - 451 to Jay -Brant General Contractors in an amount not to exceed $469,200 for the Base Bid plus Alternate # 1. FISCAL NOTES I ] N/A Expenditure Account Required $ 469,200 No 410-451-452-150-038-005 APPROVAL FOR AGENDA: Mayor RECOMMENDED ACTION: Kodiak Island Borough MEMORANDUM April 6, 1992 To: Assemblymembers Thru: Jerome M. Selby, Mayor �� Fm: Ray Camardella, Director/ C/ Engineering/Facilities Re: High School Alteration Project - Phase II Bid Award Bids were opened on March 31, 1992 at 3:00 p.m. in the Borough conference room for the High School Alteration Project - Phase II. Nine bids were submitted for the project, with three of the bidders filling out the bid schedule incorrectly as noted on the attached bid tabulation sheet. Two of the contractors that bid incorrectly, H. Watt & Scott, Inc. and Gaston & Associates, Inc. asked that their bids be withdrawn when questioned as to the validity of the submitted schedule. Brechan Enterprises, Inc. has asked that their bid be allowed to be corrected as noted in their attached letter dated March 31, 1992. Correction of Brechan's bid would make their total for the base bid plus alternate #1 $491,683. The low bidder for the project is Jay -Brant General Contractors of Homer, Alaska with a bid of $469,200 for the base bid plus alternate #1. I asked for an attorney's opinion on the legal aspects of recommending the bid award due to the bid errors and the potential for local preference by the Assembly. Attached you will find the legal opinion by Mr. William M. Walker, attorney with Hughes, Thorsness, Gantz, Powell, & Brundin regarding these issues and recommending the award be made to Jay -Brant General Contractors. Prior notice of the local bidders preference was not given to the bidders in either the solicitation or contract specification. cc: file KODIAK ISLAND BOROUGH 710 Mill Bay Road Kodiak, AK 99615 HIGH SCHOOL ALTERATION, PHASE II RIB - 410 - 451 MARCH 31, 1992 3:00 P.M. FIRM BASE BID BASE BID & ALT. #1 A & E ESTIMATE $ 469,835.00 $ 622,789.00 BLAZY CONSTRUCTION 464,406.00 594,250.00 INTNL. STEEL ERECTORS 427,500.00 558,200.00 JAY -BRANT GEN. CONTRACTORS 370,900.00 469,200.00 HOLDEN COMPANY 415,548.00 528,104.00 CLARION COMPANY 478,434.00 612,062.00 H WATT & SCOTT 395,550.00 104,272.00 BID ERROR, WITHDRAWN GASTON & ASSOCIATES 387,000.00 112,000.00 BID ERROR, WITHDRAWN BRECHAN ENTERPRISES 375,782.00 115,901.00 BID ERROR, CORRECTION REQUESTED IDITAROD DEV. CO. 530,842.00 644,995.00 CGASTON & ASSOCIATES, INC. GENERAL CONTRACTORS 8511 Hartzell Road Anchorage, Alaska 99507 Contractor's License OA13750 Fax (907) 349.8691 Phone (907) 344-1717 MARCS 311 1992 OFFICE OF THE MAYOR KODAK ISLAND BOROUGH 710 MILT. sAY ROAD KODIAK, ALAKSA 99615-6396 ATTN: RAY CAMARDELLA REFHRENCE: BID PROPOSAL FOR HIGH SCHOOL ALTERATION PROJECT PROJECT NO. KIB - 410 - 45: SUBJECT: WITHDRAWL DUE TO ERROR DEAR MR. CAMARD£LLA GASTON & ASSOCIATES, INC. HEREBY WITHDRAWS THEIR BID ON Tails AnCVE REFERENCED PROJECT D17K TO AN ERROR ON THE SID SCHEDULE, S:D SCHEDULE ITEM B LISTED OUR. PRICE ?OR THE ALTERNATE ONLY ANN NOT THE COMBINED AMOUNT FOR THE "BASE 3,-D PLUS ALATERNAT= NO. i" AS REQUESTED. SINCERELY, _1/'/' 7Z�- / H. LEE PEDERSON VICE PRESIDENT ?WP PROPOSAL KODIAK WITHDRAWL 3-31-92 Ray Camardclle Kodiak Borough Re= Kodiak Hiah School Bid Gentlemen - Please withdrzaw our previously School alt.erAtinn it Appears OW, the bid s(-hodule, submitted bid for the High we, mcide; an Error ire riiiino RECEIVED NAR 31 1992 = W. I KDDEAKISLAND BOROUGH' P.O. Box 112627 • Anchorage. Alaska 99511 • 907-346-1734 BRECHAN ENTERPRISES, INC. IGENERAL CONTRACTORS 2705 Mill Bay Road • Kodiak, Alaska 99615 March 31, 1992 Honorable Jerome Selbv, Mayor Kodiak Island Boroug:. 710 Mill Bay Road Kodiak, AK 99615 RE: Kodiak High School Alteration Phase II Project No. KIE - 410 - 451 Dear Sirs: This letter is to advise you that we made a clerical error in the preparation of the bid which opened at 3:00 P.M. today. Attached herewith is the job cost sheet prepared by Mr. Grant deLine for the above referenced project. You will note on the second page that it indicates Base 375,782, Alt 115,901 and carrot symbol for the sum of the two numbers. Our secretary mistakenly entered the alternate price instead of the sum. As the general provisions provide for the correction of clerical error, we hereby request that you consider our Bid for the Base plus the Alternate at the sum of $491,683. As the bid preparation documents are confidential in nature, we would request that you preserve their integrity. Sincerely yours, BRECHAN ENTERPRISES, INC. -./re President Enclosure MCB/css BRECHAN ENTERPRISES, INC./GENERAL CONTRACTORS • 2705 Mill Bay Road, Kodiak, Alaska 99615 Ph. (907) 486-3215 • FAX (907) 486.4889 Alaska Business License #001858 • Alaska Contractors License #AA441 We Are An Equal Opportunity Employer ,JAY -BRAN 1- GENERAL CONTRACTORS 460 GRUBSTAKE AVE., HOMER, ALASKA, 99603 (907) 235-8400 FAX (907) 235-8731 April 1, 1992 Kodiak Island Borough 710 Mill Bay Road Kodiak, Alaska 99615 Attn: Ray Cammardella Re: Kodiak High School Alterations, Phase II Gentlemen: We have been advised that we are the apparent low bidder on the above referenced project. We would like to confirm that our price for the base bid is $370,900 and our price for the base bid plus alternate #1 is $469,200. We also understand that our price is well below the engineer's estimate and would appreciate notification of when we can expect the project to be awarded. Sincerely, Jay -Brant General Contractors Don Marlatt RECEIVED, AN KODlA No