Loading...
CHINIAK AK BK 1 LT 1A - ZCP 7/1/2019Kodiak Island Borough Print Form Submit by Email Community Development Department f 710 Mill Bay Rd. Rm 205 d� Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2020-003 Property Owner/ Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Single Family Residence The following information is to be supplied by the Applicant: Travis Diemer PO Box 8993, Kodiak, AK 99615 907-539-4047 Subdv: Chiniak Block: 1 Lot: 1A 42742 Chiniak Hwy Description of Proposed Action: Fill from Chiniak Rd. construction Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR2 KIBC 17.60 PROP_ID Lot Area: 2.29 ac Front Yard: 50' Lot Width: Not Applicable Bld'g Height: 35' Rear Yard: 20' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3 Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Side Yard: 20' Subd Case No. Plat No.: Bldg Permit No. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 2601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such proiects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Plan— (J I �' Date: Jul 1, 2019 List Other: Signature: �( This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION. Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Jul 1, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room -* 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: $60.00 ❑ $120.00 5.01 to 40.00 acres: $180.00 ❑ $90.00 ❑ 40.01 acres or more: ❑ $120.00 $240.00 10 A I I Y JUL -I Wg KOVIAK144MUNHUUGH CrluAlli CMMA0TAArArr It V y�e �/ � v