Loading...
CHINIAK AK BK 1 LT 1B - ZCP 1/25/2019Kodiak Island Borough Print Form Submit by Email Community Development Department 710Mill Bay Rd. Rm 205 Kodiak AK 99615II I I I II II I II I II I II I III III Ph. (907) 486 - 9363 Fax (907) 486 - 9396 19330 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2019-037 The following information is to be supplied by the Applicant: Property Owner/ Applicant: TRAVIS NELLIE Mailing Address: PO Box 5528 Phone Number: 486-5593 Other Contact email, etc.: Legal Description: Subdv: CHINIAK AK BK 1 LT 1B Block: 1 Lot: 1B Street Address: Use & Size of Existing Structures: SFR and accessory structure! 42820 Chiniak Highway Description of Proposed Action: Add fill to property Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR2 KIBC 17.60 PROP—ID 19330 Lot Area: 2.33 Acres Lot Width: 200' Bld'g Height: 35 ' Front Yard: 50' Rear Yard: 20' Side Yard: 20' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements: No change to building footprint Subd Case No. Plat No. Bld'g Permit No. TBD Bldg Dept Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet, 160 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Jan 25, 2019 List Other: Signature:A Q ®. l This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Any zoning compliance permit issued is subject to the some expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Jan 25, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: 0 F $60.00 1.76 to 5.00 acres: C00o 00 $120.00 5.01 to 40.00 acres: r�$180.00 40.01 acres or more: $120.00 � 0.00 ,Ak25V019 r. KODINKIWAMdUNUGh Ior 1A