Loading...
FY2013-21 Rescinding Resolution No. FY2013-12 and Adopting a Revised State Legislative CIP List for 2013 Introduced by: Administrative Official Requested by: Borough Assembly Drafted by: Special Projects Support 1 Introduced: 01/17/2013 2 Adopted: 01/17/2013 3 4 KODIAK ISLAND BOROUGH 5 RESOLUTION NO. FY2013 -21 6 7 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 8 RESCINDING RESOLUTION NO. FY2013 -12 AND ADOPTING A 9 REVISED STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS 10 PRIORITY LIST FOR THE 2013 LEGISLATIVE SESSION 11 12 WHEREAS, the Kodiak Island Borough represents approximately 14,000 residents of the 13 Kodiak Island Archipelago living in six incorporated cities and one community governed by 14 a tribal council government; and 15 16 WHEREAS, a Borough —wide capital improvement program has been adopted by the 17 Kodiak Island Borough Planning & Zoning Commission which identifies major needs of the 18 island community for the next five years; and 19 20 WHEREAS, the Kodiak Island Borough Assembly has identified major projects to submit 21 to the Alaska Governor and State Legislative Delegation for funding consideration; 22 23 NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK 24 ISLAND BOROUGH THAT: 25 26 Section 1: The Kodiak Island Borough's State Legislative capital improvement project 27 priorities for the 2013 legislative session are as follows: 28 29 1. Kodiak Landfill Leachate Treatment Plant 30 Estimated Project Cost $6,592,000 31 KIB Funding Sources: revenue bonds $2,976,458 32 State Funding Request $3,615,542 33 The Borough is closing out the existing landfill footprint and creating a new EPA/DEC 34 lined cell. The lined cell when in operation will generate leachate which will be treated by 35 an on -site waste water treatment plant. This structure is stand -alone skid mounted piece 36 of equipment. It will be installed as Phase III of our landfill expansion project. The cost of 37 Phase III is estimated to cost $6.592 million. Funding is in place for Phase I and Phase II. 38 An on -site Leachate Treatment Plant was chosen as the method to address leachate 39 produced at the landfill after the alternative of piping it to the City of Kodiak Wastewater 40 Treatment Facility was found not to be a feasible option. This waste water plant is 41 required to treat waste water to DEC drinking water standards. The Borough has also 42 submitted a matching grant application through DEC for the maximum amount allowable 43 for this plant. The Borough view this project as a basic infrastructure need for the 44 community. 45 Kodiak Island Borough, Alaska Resolution No. FY2013 -21 Page 1 of 4 46 2. Monashka Bay Water and Sewer Project — Phase 1 (Feasibility, Planning and 47 Design). 48 Estimated Project Cost $500,000 49 State Funding Request $500,000 50 The borough has chosen to treat leachate generated at the Borough landfill with a waste 51 water treatment plant. This option was chosen after careful study and in order to allow for 52 future expansion of this plant to address failing septic systems common in Monashka Bay 53 and provide treatment of waste water generated from the Monashka Bay Residential 54 subdivisions. This section of town includes 256 residential parcels that lie outside the 55 reach of the existing sanitary sewer utilities and public water. Funding is requested for 56 feasibility, planning and design. 57 58 3. KHSNoc -Ed Renovation 59 Estimated Project Cost $8,500,000 60 State Funding Request $8,500,000 61 The voters approved the construction and renovation of the existing high school, This $76 62 million project includes the redesign and renovation of the existing on- campus vocational 63 facilities at a cost of approximately $15,500,000. The Borough received $7,000,000 during 64 the 2012 legislative session and is requesting the remaining $8.5 million. The 65 Vocational /Career Tech training is essential for Kodiak students. It includes training in the 66 traditional vocational education classes such as welding, woods, and auto mechanics, but 67 the Kodiak High School Career Tech program has broadened to prepare students for 21st 68 century careers. Currently Career Tech at KHS also includes CAD drafting, Multi -Media 69 Production, Seamanship /Maritime' Science, Culinary Arts, and Computer Applications. 70 The existing vocational complex was built in 1966 with several additions and renovations 71 made throughout the years. The complex is now functionally obsolete and unable to 72 support the program. Renovation of the existing high -bay spaces and large footprint of the 73 existing complex provides the basis for design and construction of a facility to house a 74 quality Career Tech Program at Kodiak High School. Approval of this project will reduced 75 the overall bonded indebtedness of the project and will reduce the amount of property tax 76 increases expected for the community. Failure to receive this funding means increases in 77 property tax. 78 79 4. Service Area Road and Paving Improvements 80 Estimated Project Cost $5,000,000 81 KIB Funding Sources: local improvement district $1,000,000 82 State Funding Request $4,000,000 83 This project addresses the on -going need to pave portions of Borough Service Area 84 roads. There are approximately 26 miles of road among four Road Service Areas that 85 connect residential neighborhoods with the greater Kodiak community. Paving projects will 86 address main thoroughfares or busy neighborhood roads as well as improvements to 87 major drainage course that runs through these areas. Funding will be applied to priority 88 projects identified by the road service districts (Service Area One, Womens Bay Service 89 Area, Bayview Service Area, and Monashka Bay Service Area). Priorities will be based Kodiak Island Borough, Alaska Resolution No. FY2013 -21 Page 2 of 4 90 on recommendations made by the elected service area boards. Local contributions to 91 project engineering and design may be funded through local improvement districts where 92 those in the district are taxed a proportion of the project costs. 93 94 5. East Elementary Traffic Flow Improvements 95 Estimated Project Cost $1,000,000 96 KIB Funding Sources $100,000 97 State Funding Request $900,000 98 East Elementary School was constructed in 1966 with a substantially addition in 1988. 99 The facility now totals 39,842 square feet with twenty -five teaching stations. Since the 100 expansion, increased traffic flows have created dangerous vehicle /student hazards when 101 students are entering and leaving school. Reconfiguration of the parking area will reduce 102 risks by providing for a safer separation of pedestrians, small vehicle traffic and bus 103 loading /unloading. A new design will require an increase in the total area of the parking 104 lot to allow adequate parking to support increased building usage and occupant load. 105 106 6. Peterson Elementary School Parking Rehabilitation, Drainage and Paving 107 Estimated Project Cost $1,000,000 108 KIB Funding Sources $100,000 109 State Funding Request $900,000 110 Peterson Elementary School was built in 1945 by the U.S. Navy on government property 111 to provide an educational facility for dependent children. The building was conveyed to 112 the Kodiak Island Borough and provides elementary education for children of Coast Guard 113 families living on base and for children of the Womens Bay community. The parking lot 114 for this 39,967 square foot facility is gravel, and requires excessive maintenance expense 115 due to continual pothole repair, re- grading, and surfacing. A paved surface will not only 116 reduce maintenance expenses, it will mitigate ice hazards in the cold months of the year 117 and will provide safer and cleaner facilities for the students, faculty, staff and parents. 118 119 7. Mill Bay Beach and Island Lake Trail Access Upgrade and Trail Improvements 120 Estimated Project Cost $400,000 121 State Funding Request $400,000 122 This beach is heavily used by residents, sports fisherman and the community who come 123 to recreate at this bay located dose to town. It is also the terminus of the Island Lake Trail. 124 New construction items proposed here would include the construction of new access way 125 to the beach as well as trail enhancements between the two beaches as well as a small 126 raft/kayak launch. The planning, permitting and design cost estimate has come in at 127 approximately $69,000 and has been partially funded through a state grant of $48,000. 128 129 8. Parks and Field Plan 130 Estimated Project Cost $100,000 131 KIB Funding Sources $10,000 132 State Funding Request $90,000 133 Borough owns and manages land and fields for recreational purposes which need a 134 master plan to ensure best utilization and maintenance by the community. A master plan Kodiak Island Borough, Alaska Resolution No. FY2013 -21 Page 3 of 4 135 would also help to reconcile jurisdictional and policy concerns with regard to cooperative 136 use arrangements with City of Kodiak and KIB School District. 137 138 9. Kodiak Island Trail Improvements 139 Estimated Project Cost $100,000 140 KIB Funding Sources $10,000 141 State Funding Request $90,000 142 This is a priority identified by the Kodiak Island Borough Parks and Recreation Committee. 143 The purpose of the project would be to design and implement trail system improvements 144 as recommended and prioritized in the recently adopted Kodiak Road System Trail Plan, 145 to include, but not limited to, trail head improvements, parking area and circulation plans, 146 drainage improvements, environmental permitting, etc. 147 148 10. Womens Bay Boat Ramp Planning and Design 149 Estimated Project Cost $100,000 150 KIB Funding Sources $10,000 151 State Funding Request $90,000 152 The 2007 Womens Bay Comprehensive Plan identifies a goal to provide public access to 153 the shoreline of Womens Bay for recreational purposes. This access would include 154 access for skiffs, kayaks and small pleasure craft. The project would initially develop a 155 boat ramp design with parameters and specifications that could be used in a site selection 156 process. The investigation of potential sites for public acquisition would then provide the 157 necessary information to develop a detailed cost breakdown of what would be required to 158 complete the project. 159 160 Section 2: The Kodiak Island Borough administration is hereby instructed to advise our 161 State of Alaska Governor and Legislative Delegation of the Capital 162 Improvement Projects Priority List adopted by the Kodiak Island Borough 163 Assembly. 164 165 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 166 THIS SEVENTEENTH DAY OF JANUARY, 2013 167 168 169 KODIAK ISLAND BOROUGH 170 171 / 172 173 ATTEST: J� me M Sel by, Borou ayo 174 175 176 tall Ai _A Ala 177 Nava M. Javier MMC, Boro .h Clerk Kodiak Island Borough, Alaska Resolution No, FY2013 -21 Page 4 of 4