Loading...
FY2013-19 Adopting a 2013 Communities State Legislative CIP List 1 Introduced by: Borough Manager 2 Requested by: Borough Assembly 3 Drafted by: Special Projects Support Introduced on: 01/03/2013 4 Adopted on: 01/03/2013 5 6 KODIAK ISLAND BOROUGH 7 RESOLUTION NO. FY 2013.19 8 9 A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY ADOPTING A 2013 10 KODIAK ISLAND BOROUGH COMMUNITIES STATE LEGISLATIVE CAPITAL 11 IMPROVEMENT PROJECTS PRIORITY LIST 12 13 WHEREAS, the Kodiak Island Borough is a regional government representing the 14 citizens and communities of the Kodiak Island Archipelago; and 15 16 WHEREAS, these communities have developed a list of improvement and infrastructure 17 needs for their citizens and visitors; and 18 19 WHEREAS, these communities include the home rule city of Kodiak, the second class 20 cities of Akhiok, Larsen Bay, Old Harbor, Ouzinkie, and Port Lions; and the unincorporated 21 community of Karluk; and 22 23 WHEREAS, Community Capital Improvement Project (CIP) needs are identified and 24 prioritized by each of the communities and forwarded to the Kodiak Island Borough for 25 inclusion into an island wide list to be considered by the Alaska Legislature. 26 27 NOW, THEREFORE BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND 28 BOROUGH that the Kodiak Island Borough Communities 2013 State Legislative Capital 29 Improvement Projects Priority Lists are as follows: 30 31 City of Kodiak 32 1. Monashka Pump House Upgrades $5,700,000 33 2. E911 Replacement Equipment $350,000 34 3. Phase 3 Shelikof Street Pedestrian Improvements 35 Bulkhead Parking Area $1,500,000 36 4. Fire Apparatus Replacement $400,000 37 Total $7,950,000 38 39 City of Akhiok 40 1. Planning & Design for Water Treatment Plant $50,000 41 2. Planning & Design for New Water Tank and Distribution Lines $50,000 42 3. Planning & Design for Sewer System $50,000 43 4. Planning & Design for New Landfill $50,000 44 5. Erosion Control /New Water -break $50,000 45 6. Planning & Design for Alternative Energy (Hydro) $50,000 46 7. New Playground Equipment $50,000 47 8. Garage Building Rehabilitation $50,000 48 Total $400,000 49 50 Kodiak Island Borough, Alaska Resolution No. FY2013 -19 Page 1 of 3 51 City of Larsen Bay 52 1. Deepwater Dock/Moorage and Piping for Fuel Delivery $550,000 53 2. Replacement Aggregate for Roads $500,000 54 3. Upgrade and Deepen Water Reservoir and Dam $1,250,000 55 4. Replace Machine Shop Building /Garage $650,000 56 5. Upgrade City /Senior/Teen Center Municipal Building $750,000 57 6. Upgrade and /or Replace Light Fixtures in Boat Harbor and 58 Install Power Outlets in Stalls $100,000 59 7. Install City Wide Sewer System & Install Treatment Plant $3,500,000 60 Total $7,300,000 61 62 City of Old Harbor 63 1. Hydroelectric Power Project $6,000,000 64 2. Airport Improvements $14,000,000 65 3. Dumpster Truck/Swap Loader /Bear Proof Dumpsters $85,000 66 4. City Shop $120,000 67 5. Emergency Response skiff with outboard motor and trailer $75,000 68 6. Building at Landfill for Transfer of Recycling $80,000 69 Total $20,360,000 70 71 City of Ouzinkie 72 1. Municipal Water and Hydro Darn Replacement $2,000,000 73 2. Dock/Industrial Area Construction & Development $3,044,000 74 3. Water Transmission Lines $1,832,000 75 4. Electrical Infrastructure Upgrade $1,000,000 76 5. Electrical Upgrade to Boat Harbor $20,000 77 6. Equipment Upgrades $325,000 78 7. Community Roads Replacement $3,600,000 79 8. Alternative Energy Projects $250,000 80 9. Ouzinkie Municipal Building $1,400,000 81 10. Heavy Equipment Storage Building /Shop $250,000 82 11. Fire Hall Roof Replacement $15,000 83 12. Fire Hall Furnace Replacement $10,000 84 13. Tourism Development $977,500 85 Total $14,723,500 86 87 City of Port Lions 88 1. Public Ferry Dock Facility $3,500,000 89 2. Small Boat Harbor Replacement, Phase II $6,000,000 90 3. Water Reservoir Repair $500,000 91 4. City Maintenance Building Replacement $200,000 92 5. Heavy Equipment $250,000 93 6. Native Village of Port Lions Building $7,000,000 94 7. New Subdivision Development $800,000 95 8. Harbor Water Main $1,000,000 96 9. Rock Screen and Conveyor $100,000 97 10. Municipal Building Repair $75,000 98 11. Road Upgrades $1,200,000 99 Total $20,625,000 100 Kodiak Island Borough, Alaska Resolution No. FY2013 -19 Page 2 of 3 101 102 Community of Karluk 103 1. Install Water Tank and Distribution Lines $250,000 104 2. Planning & Design for Water Treatment Plant $200,000 105 3. Sewer System Upgrade $150,000 106 4. Community Hall /Clinic Renovation $300,000 107 5. Landfill Relocation $400,000 108 Total $1,300,000 109 110 BE IT FURTHER RESOLVED that the Kodiak Island Borough administration is hereby 111 instructed to advise the Governor and our Legislative Representatives of the State of 112 Alaska of the Kodiak Island Borough Communities 2013 State Legislative Capital 113 Improvements Project Priority List adopted by the Kodiak Island Borough Assembly. 114 115 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 116 THIS THIRD DAY OF JANUARY, 2013 117 118 KODIAK ISLAND BOROUGH 119 120 121 �' C , , 122 (( � — fir 4//; r / 123 Jeb M. Selby, Borough Mayor ' 124 w 125 ATTEST: 126 127 11/0Th �i/�y� �y � 129 ' TV s ' akt/C � 130 Nova M. Javier, MMC, Boro gh Clerk Kodiak Island Borough, Alaska Resolution No. FY2013 -19 Page 3 of 3