Loading...
LAKESIDE 2ND LT 1A-1 - ZCP 1/2/20136 Submit by Email 1 Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form iii 1 11 II 1 I II 11 1 II 1111 III 16406 Permit No. CZ2013 -054 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Jim Ashford 2521 Selief Ln, Kodiak, AK 99615 (907) 539 -1298 Subdv: Lakeside 2nd 2521 Selief Ln Block: Lot: 1A -1 Mini storage bld'gs w/ residenced Description of Proposed Action: Enclosed arctic entry (16' x 8') on front of residence t cam) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Industrial KIBC 17.105 PROP JD 16406 Lot Area: 1.03 Lot Width: Front Yard: Rear Yard: Prk'g Plan Rvw? No # of Req'd Spaces: Plat / Subdivision Requirements? Bldg Height: Side Yard: Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, oras a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jan 2, 2013 Signature: Jim This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBQ per KIBC 17.15.060 A. ** CDD Staff Certification Date: Jan 2, 2013 COD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building � 1 e -Fact 2X the published amount Not Applicable r $0.00 �� F $0.00 Less than 1.75 acres: � $30.00 F $60.00 1.76 to 5.00 acres: F $60.00 JAN'_,' �Q r $120.00 5.01 to 40.00 acres: F $90.00 J $180.00 �; ,. J1 ug� OW , 40.01 acres or more: F $120.00 $240.00 FM s 1 1 A SNEO � s' � FUEG TnN� r3 A B3 �O L�olC>l Zsr , S/ Q /•S �� � 2O6 / �0 7 � I^ � I (v SHED LOT I 0 �a y 1.028 ACRE a a, z S 1 (g v) b CD N� \o _J o ` O 69530 X60 �S s 2 O DD i 34.23 y 8 45 / ro� � �6� lam. � O • ��� x AS -BUILT SURVEY HORIZON LAND SURVEYING INC. P.O. BOX 1945 KODIAK AIASKA 091E