Loading...
KADIAK AK TR B-1 UNIT 5 - ZCP 11/20/2012Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 16481 Submit by Email 11 Permit No. CZ2013 -045 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Kodiak Island Housing Authority 3137 Mill Bay Rd., Kodiak, AK. 99615 Subdv: Kadiak Ak 2815 Woody Way Lp Block: B -1 Lot: 5 MFR Description of Proposed Action: Construct 36' x 36' Metal BId'g to be used for sand /gravel storage Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R3 KIBC 17.85 PROP_ID 16481 Lot Area: 4.44 acres Lot Width: Bldg Height: 35 ' Front Yard: 25 ' Rear Yard: 10' Side Yard: 10' Prk'g Plan Rvw? No # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve an EPA defined facility? No change to existing requirements NO If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan r Date: Nov 7, 2012 Signature: Leonard Martin for KIHA This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Nov 7, 2012 CDD Staff: Martin re Payment Verification Zoning Compliance Permit Fee Payable in Cashier's WM�(/r WV 202012�' gi Not Applicable � ir2Anr.P P o � + $0.00 Less than 1.75 acres: F $30.00 1.76 to 5.00 acres: r $60.00 5.01 to 40.00 acres: r $90.00 40.01 acres or more: r $120.00 List Other: # 104 - Main floor of Borough Building After - the -Fact 2X the published amount r $0.00 $60.00 F $120.00 F $180.00 F $240.00 h LCaIF10 SM-k I`cotr ✓xl� L,Ned /� UNIT 100 0 Q �,uNmrt uxK Slovwvxo. � ��, /, quoin PPD EKCROPLHNEM // f I I I A I/ U 1'2� I � 1 1 I C)NTRACTORS EQUIPMENT AND KI ' °'KRNO s• ° '� 1 � ONF I , �� OSR f / CO xO RIICM.� xEd6fNE '^ I PE R iT TIMx NWMN `r I qWx p)REf 'f I I CM mm i0R iNPEE / PR mI. / SNErTER. U I I 1 i MESA se • UNIT 2 PHASE CONTRAbT AREA — % 1 i I I , I o f o \ L P CIO �R HOPE.ORIJN 99� / /Ie rJ' • ']'O I oIl"i �nJ�EYd�� hFVJe U