KADIAK AK TR B-1 UNIT 5 - ZCP 11/20/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
16481
Submit by Email
11
Permit No. CZ2013 -045
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Kodiak Island Housing Authority
3137 Mill Bay Rd., Kodiak, AK. 99615
Subdv: Kadiak Ak
2815 Woody Way Lp
Block: B -1 Lot: 5
MFR
Description of Proposed Action: Construct 36' x 36' Metal BId'g to be used for sand /gravel storage
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R3 KIBC 17.85
PROP_ID 16481
Lot Area: 4.44 acres Lot Width: Bldg Height: 35 '
Front Yard: 25 ' Rear Yard: 10' Side Yard: 10'
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
No change to existing requirements
NO
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
r
Date: Nov 7, 2012 Signature: Leonard Martin for KIHA
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Nov 7, 2012 CDD Staff: Martin
re
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's
WM�(/r
WV 202012�'
gi
Not Applicable � ir2Anr.P P o � + $0.00
Less than 1.75 acres: F $30.00
1.76 to 5.00 acres: r $60.00
5.01 to 40.00 acres: r $90.00
40.01 acres or more: r $120.00
List Other:
# 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
r $0.00
$60.00
F $120.00
F $180.00
F $240.00
h LCaIF10 SM-k I`cotr ✓xl� L,Ned /�
UNIT 100 0
Q �,uNmrt uxK Slovwvxo. � ��, /,
quoin PPD
EKCROPLHNEM // f I I I A I/
U
1'2�
I �
1
1
I
C)NTRACTORS EQUIPMENT AND
KI '
°'KRNO s• ° '� 1 �
ONF
I
,
��
OSR f /
CO
xO RIICM.� xEd6fNE
'^ I PE R iT TIMx NWMN
`r I qWx p)REf 'f I I CM mm i0R iNPEE /
PR mI.
/
SNErTER.
U I I 1 i MESA
se •
UNIT 2
PHASE CONTRAbT AREA
—
%
1
i I
I ,
I o
f
o \ L P
CIO �R HOPE.ORIJN 99� / /Ie rJ' • ']'O I oIl"i �nJ�EYd�� hFVJe
U