USS 2537B BLK 2 TR 16-B - ZCP 11/9/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
14870
Permit No. CZ2013 -045
1
Submit by Email 1
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Int'I Seafoods of AK
PO Box 2997, Kodiak, AK. 99615
907 - 486 -4768
Subdv: ATS 49 Tract P -16B
714 Marine Way E
Block: Lot:
Bunkhouse, warehouse, ice house
Description of Proposed Action: Construct storage /shipping container dock w/ utilities
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: Industrial KIBC 17.105
PROP_ID 14870
Lot Area: 1.46 acre Lot Width: Bld'g Height: Unlimited
Front Yard: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? Yes # of Req'd Spaces: 19
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Exempt waterfront industry; prior prk'g = 16 + 3 this permit = total 19
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to Klf1"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Nov 8, 2012
List Other:
Signature: Hiro Ikawa (for ISA) ,; r 7t� ✓
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 7997 UBQ per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Nov 8, 2012 CDD Staff: Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Rohnn # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
F
$0.00 /�q,/�p Pd,31
F
$0.00
Less than 1.75 acres:
�
$30.00 L'!�'n
$60.00
1.76 to 5.00 acres:
r
$60.00
F
$120.00
5.01 to 40.00 acres:
F
$90.00
■ is E I D
r
$180.00
40.01 acres or more:
r"
$120.00
NOV - 91012
F
$240.00
Koala slSIOU'Augh
FinanrpnPrinImPnt
C75
H, L ,