MILLER PT 2ND BK 1 LT 8B - ZCP 10/24/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
Submit by Email
IM IIOIIIUIIUIIIII 1
21923
Permit No. BZ2013 -024
1
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Clifford and Brenda Zawacki
P.O. Box 14, Kodiak AK 99615
907 - 487 -4986
Subdv: Miller Point Alaska 2nd Addition
4150 Cliffside Road
Block: 1 Lot: 8B
SFR 2,300 Sq. Ft.
Description of Proposed Action: 12 by 16 foot detached accessory building
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R2
KIBC 17.80 PROP_ID 21923
Lot Area: 31,008 Sq. Ft. Lot Width: 60' Bldg Height: 25'
Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 '
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
10 foot utility easement on south property line. South portion of lot restricted from principal structures.
If YES, do you have an EPA Return Receipt of Notification?
N / A "Permit will not be issued until receipt is submitted to MB" / A
Subd Case No. NA Plat No. NA Bldg Permit No. Pending
Driveway NA
Permit? _
Septic Plan NA
Approval:
Fire NA
Marshall:
List Other:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Oct 24, 2012
Signature: Clifford Zawacki
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the
work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Oct 24, 2012 CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
r'
$0.00 F
$0.00
Less than 1.75 acres:
[X
$30.00 F
$60.00
1.76 to 5.00 acres:
r
$60.00 F
$120.00
5.01 to 40.00 acres:
r
$90.00 r
$180.00
40.01 acres or more:
r
$120.00 iDI r
� I �
40.00
OCT 2 4 2012 .
Koa�4 ;tb0uroug
Finance��O�Ot!1"O
I
l i
I
u
N
I ,oj E.
D
� � I
m
Cn �
� I
� m
_ m I
p m
.Z
I
A I
O
c I
I
D
�I I
� 4 I
ti � I
O I
C) - Or \
UTILITY
o cr o cm
_ m
— EASEMENT -p
f 01>-
0 l r S /
C1J o '8' ° f os?
.�: mm 1 40 \ o�
n
ti m
r W Tj n '
h w � 0
1,3g ¢2
W
0 O
/ 00 ---d
703
/ I+ W
mm
o cn
m m
mm
N�s
V
f
�Cw SSotr
%< p48
- 2ar3 -62 G
16•1(
I
v
03'
� I
A n I
N
� N
� m I
� ; I
z
� I
T
]J
O
m I
D I
L I
NC I
O
O I
I -�-- co
r� D
Manz
0.10
Amm�
i mam
z�c
(10 yym
Z
I D A O
Mrz
N O
Z O O
CO r
O Z O
m m�
m5
N O
D
0
+w
r
of
.to D
rQ
i
v x
s
V
? � 0
.V
ZOT.DO
G) � O O mZ 1
m• mADZlyIOZl
m O 0 002 m
A D mD mm zDmm
yis'6`I�Y\ m ZOO -0c C:
N m � AAmoSO ��
!f 0
Q
� A
X4.9 o m
O ?4
W
/00
/ W
In
„
I+
unLITY
EAS EMENT
m
n � K
\
O
�
\ �
o
O` �
m OO
/ A
pm /q.0 n.
` 0
I
v
03'
� I
A n I
N
� N
� m I
� ; I
z
� I
T
]J
O
m I
D I
L I
NC I
O
O I
I -�-- co
r� D
Manz
0.10
Amm�
i mam
z�c
(10 yym
Z
I D A O
Mrz
N O
Z O O
CO r
O Z O
m m�
m5
N O
D
0
+w
r
of
.to D
rQ
i
v x
s
V
? � 0
.V
ZOT.DO
G) � O O mZ 1
m• mADZlyIOZl
m O 0 002 m
A D mD mm zDmm
yis'6`I�Y\ m ZOO -0c C:
N m � AAmoSO ��
!f 0
Q
� A
X4.9 o m
O ?4
W
/00
/ W
In
„
I+