Loading...
USS 3467 ROW 1 SP 6 CITY A/P LEASE - ZCP 9/12/2012Submit by Email 1 Print Form Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit 16442 Permit No. CZ2013 -021 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: James Chase 1710 Larch St., Kodiak, AK. 99615 206 -679 -4535 Subdv: USS 3467 2285 City Airport Rd Block: 1 Lot: 6 Vacant Description of Proposed Action: New Airplane Hangar (60' x 80') Municipal airport lease: KIBC 17.120.070 "Airport protection & safety regulations may limit building height." Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Light Ind KIBC 17.120 PROP_ID 16442 Lot Area: 4,800 square feet Lot Width: Bld'g Height: Not Applicable Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? Yes # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve an EPA defined facility? If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KM" Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: Sep 12, 2012 List Other: Signature: James Chas� -\�.� (`e This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. **EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Sep 12, 2012 CDD Staff: MartipdV f / �� 1 Payment Verification Zoning Compliance Permit Fee Payable in Cashier's OffL Room # 104- Main floor of Borough Building 2X the published amount Not Applicable r ( /(/w' r r $0.00 Less than 1.75 acres: $30.00 (— $60.00 1.76 to 5.00 acres: r Al $120.00 5.01 to 40.00 acres: F $90.00 F $180.00 40.01 acres or more: rn S (- $120.00 E 122 F $240.00 (agiaNWRIG a OW :ir1"1,P nPnarhnPnf