Loading...
ISLAND VISTA BK 1 LT 5A - ZCP 9/11/2012Submit by Email Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form i 20579 Permit No. BZ2013 -013 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: David Putnam PO Box 1541, Kodiak, AK. 99615 907.539.2444 Subdv: Island Vista 2056 Ridge Circle Block: 1 Lot: 5A SFR Description of Proposed Action: Detached Garage & shop 25' x 45' 1C 5`"0' X444 e 9 /0\ Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP_ID 20579 Lot Area: 1.03 ac Lot Width: Bldg Height: 35' Front Yard: 25 ' Rear Yard: 20 ' Side Yard: 15 ' Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Aug 21, 2012 Signature: David Putnam This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. **EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 7997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Aug 21, 2012 CDD Staff: Martin Payment Verificatio c�e Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building � M[:�'r ` AUG 212012 �Oaia lsian®oaroug[ After - the -Fact 2X the published amount Pnanr4 f1P,naCff llpnt Not Applicab e r $0.00 $0.00 Less than 1.75 acres: r $30.00 F $60.00 1.76 to 5.00 acres: r $60.00 r $120.00 5.01 to 40.00 acres: F $90.00 r $180.00 40.01 acres or more: (— $120.00 f $240.00