ISLAND VISTA BK 1 LT 5A - ZCP 9/11/2012Submit by Email
Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
i
20579
Permit No. BZ2013 -013
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
David Putnam
PO Box 1541, Kodiak, AK. 99615
907.539.2444
Subdv: Island Vista
2056 Ridge Circle
Block: 1 Lot: 5A
SFR
Description of Proposed Action: Detached Garage & shop 25' x 45'
1C 5`"0' X444 e 9 /0\
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: RR1
KIBC 17.70 PROP_ID 20579
Lot Area: 1.03 ac Lot Width: Bldg Height: 35'
Front Yard: 25 ' Rear Yard: 20 ' Side Yard: 15 '
Prk'g Plan Rvw? Yes # of Req'd Spaces: 3
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
List Other:
Date: Aug 21, 2012
Signature: David Putnam
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 7997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Aug 21, 2012 CDD Staff: Martin
Payment Verificatio c�e Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
� M[:�'r `
AUG 212012
�Oaia lsian®oaroug[
After - the -Fact 2X the published amount
Pnanr4 f1P,naCff llpnt
Not Applicab e
r
$0.00
$0.00
Less than 1.75 acres:
r
$30.00
F
$60.00
1.76 to 5.00 acres:
r
$60.00
r
$120.00
5.01 to 40.00 acres:
F
$90.00
r
$180.00
40.01 acres or more:
(—
$120.00
f
$240.00