USS 3099 LT 23B - ZCP 9/11/2012Submit by Email j
Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
u
1
IDhlllIulI
20892
Permit No. BZ2013 -018
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Aaron & Jamie Still
2657 Metrokin Way, Kodiak, AK. 99615
907 - 481 -3629
539 - 5672/539 -5673
Subdv: USS 3099
2657 Metrokin Way
Block: Lot: 23 -B
Detc'd garage (3 car)
Description of Proposed Action: New Single Family Residence (replaces previous mhr destroyed by fire)
*Front deck (30'w x 8'd) must be no more than 30" above grade & must remain uncovered & unenclosed.* KIBC 17.150.030 A.2 &
Table 1.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R1 KIBC 17.75
PROP_ID 20892
Lot Area: 11,550sgft Lot Width: 60' Bld'g Height: 35'
Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 '
Prk'g Plan Rvw? Yes # of Req'd Spaces: 3
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KM"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Sep 11, 2012 Signature: Jamie Still
This permit is only for the proposed project as described by thelappJiL` .. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBQ per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Sep 11, 2012 CDD Staff: Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Robm # 104 - Main floor of Borough Building
Aker - the -Fact 2X the published amount
Not Applicable
$0.00 (—
$0.00
Less than 1.75 acres:
$30.00
$60.00
1.76 to 5.00 acres:
r
$60.00 � 1
U
$120.00
5.01 to 40.00 acres:
40.01 acres or more:
r
(—
$90.00
9
$120.00 � 1 1 2 r
$180.00
$240.00
�r��a�a�c(s���r�isoraugr
c ;nn r,p11p.FvOwnt
;v
IN
r�.
W '
i N)
.N
IC
w
o