Loading...
USS 3099 LT 23B - ZCP 9/11/2012Submit by Email j Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form u 1 IDhlllIulI 20892 Permit No. BZ2013 -018 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Aaron & Jamie Still 2657 Metrokin Way, Kodiak, AK. 99615 907 - 481 -3629 539 - 5672/539 -5673 Subdv: USS 3099 2657 Metrokin Way Block: Lot: 23 -B Detc'd garage (3 car) Description of Proposed Action: New Single Family Residence (replaces previous mhr destroyed by fire) *Front deck (30'w x 8'd) must be no more than 30" above grade & must remain uncovered & unenclosed.* KIBC 17.150.030 A.2 & Table 1. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R1 KIBC 17.75 PROP_ID 20892 Lot Area: 11,550sgft Lot Width: 60' Bld'g Height: 35' Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 ' Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KM" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Sep 11, 2012 Signature: Jamie Still This permit is only for the proposed project as described by thelappJiL` .. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBQ per KIBC 17.15.060 A. ** CDD Staff Certification Date: Sep 11, 2012 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Robm # 104 - Main floor of Borough Building Aker - the -Fact 2X the published amount Not Applicable $0.00 (— $0.00 Less than 1.75 acres: $30.00 $60.00 1.76 to 5.00 acres: r $60.00 � 1 U $120.00 5.01 to 40.00 acres: 40.01 acres or more: r (— $90.00 9 $120.00 � 1 1 2 r $180.00 $240.00 �r��a�a�c(s���r�isoraugr c ;nn r,p11p.FvOwnt ;v IN r�. W ' i N) .N IC w o