ESTELLE LT 3A - ZCP 9/10/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
Submit by Email
11111
15272
Permit No. CZ2013 -019
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
David Cole
1130 Mission Road, Kodiak Alaska 99615
907 - 942 -0204
Subdv: Estelle
1130 Mission Road
Block: Lot: 3A
24 by 24 foot Single- family Dwelling
Description of Proposed Action: Construction of an attached 32 by 32 foot addition. No change of use from Single - family Res.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R2
KIBC 17.80 PROP ID 15272
Lot Area: 7,202 Sq. Ft. Lot Width: 60' BId'g Height: 35'
Front Yard: 25' Rear Yard: 10' Side Yard: 5'
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
NA
N/A
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
N/A
Subd Case No. NA Plat No. NA Bld'g Permit No. Pending
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
NA
NA
NA
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Sep 10, 2012
List Other
Signature: David Cole (/
i
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
* *EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Sep 10, 2012 CDD Staff: Duane Dvorak
Payment Verification Zoning COPAID Fee Payable in Cashier's Office Room # 104 -Main floor of Borough Building
SEP 10 2012
(001hisianoo0r0V
Not ApplicabrJnim.pnpmomp.re
$0.00
Less than 1.75 acres: FX_
$30.00
1.76 to 5.00 acres: [_
$60.00
5.01 to 40.00 acres: F
$90.00
40.01 acres or more: r"
$120.00
After - the -Fact 2X the published amount
$0.00
r $60.00
I $ 120.00
(— $180.00
r $240.00
KODIFIK -ISL. BOROUGH ID:907 -486 -9376 JAN 12'01 15:37 No.006 F.02
e 4
9 �� ,DAD
r
7d �
t y�4t/171
7
�
�
1
� SutV6Y
-
I
1
1
h 0
--
1
0
Cr o "
e4 vJ
4 '
4 i
m
f , j i•J l: � r+�
.s
®t �
-- 1
- Z
\ �r
1 .y,
I I
1 1
1 !
1
1
I
�-
1
)T /A' 1 1 1
w
,
P N
I
1
f
1
4
7
�
�
1
� SutV6Y
-
I
1
1
h 0
--
1
0
Cr o "
e4 vJ
4 '
4 i
m
f , j i•J l: � r+�
.s
®t �
-- 1
- Z
\ �r