NEW KODIAK BK 3 LT 2-6 - ZCP 9/4/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
1111
11
11
15493
Submit by Email
Permit No. CZ2013 -017
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Sutliff Hardware, Inc
210 Shelikoo
907 - 486 -5797
John Ure
Subdv: New Kodiak Subdivision
210 Shelikoff St
Block: 3 Lot: 2 -6
Commercial Building
Description of Proposed Action: Remove & replace existing siding north wall. R &R lap cedar siding warehouse & coffee shop walls.
Paint new siding.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: Business KIBC 17.90 PROP_ID 15493
Lot Area: 1.18 ac Lot Width: Not Applicable Bld'g Height: 50'
Front Yard: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
No change to existing requirements
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until receipt is submitted to K1B"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, oras a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Sep 4, 2012
List Other:
Signature: John Ure (for Don
a
This permit is only for the proposed project as described by the applicant. If t77ere are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 780 days. Before such work can be recommenced a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 77.15.060 A. **
CDD Staff Certification
Date: Sep 4, 2012 CDD Staff:
Martin
G r , . 4 1 -
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's
PAID
SEP 4 .2012
Not Applicabb,q' 8K'Slanaljoro P t $0.00
InnnrPnQnift .n+
Less than 1.75 acres: r $30.00
1.76 to 5.00 acres: r $60.00
5.01 to 40.00 acres: r $90.00
40.01 acres or more: r $120.00
# 104- Main floor of Borough Building
After - the -Fact 2X the published amount
F $ 0.00
F $ 60.00
F $ 120.00
F $ 180.00
F $ 240.00