ELDERBERRY HGTS 1ST BK 2 LT 3A - ZCP 8/8/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
[ Print Form
16012
Submit by Email
Permit No. CZ2013 -007
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Clay, Wm
PO Box 441, Kodiak, AK. 99615
907.486.9453
Subdv: Elderberry 1st
514 Mozart Cir
Block: 2 Lot: 3A
SFR
Description of Proposed Action: Add 32 sqft enclosed entry
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R2 KIBC 17.80
PROP_ID 16012
Lot Area: 6894 Lot Width: 60' BId'g Height: 35 '
Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 '
Prk'g Plan Rvw? Yes # of Req'd Spaces: 3
Plat / Subdivision
Requirements?
* *May not reduce existing off - street parking **
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Aug 8, 2012
List Other:
Signature: Wm Clay
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 780 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBq per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Aug 8, 2012 CDD Staff: Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Ploom # 104 - Main floor of Borough Building
/4—q% After- the -Fact 2X the published amount
P A II)e:t than 1a 5 IAr'',, s than 1.75 acres:
AUS — 8 1012.76 to 5.00 acres:
waiamslanotjgah6�40.00 acres:
"In anRC nanarm } acres or more:
00
r
$0.00
� $30.00
r
$60.00
60.00
F
$120.00
F $90.00
F
$180.00
F $120.00
F
$240.00
"-&cr v /v
z
5
8166 .
0l'/
14 c
t
01 1
d-
O
s o
Laj�
to
8 ba E 3 N
1. S •Q C O.� , 'O
A Q
pwiv
v �
i
x 1
�O fy rt
� � p
b0�y`n
j
O A U
Q O"
a
Ilk
wQ za
p
Co