Loading...
03/13/2012 Special Meeting It E X17 E E MONASHKA BAY ROAD SERVICE AREA I �., ii I Special Board Meeting - FY2013 Budget . L. U. JUN 7 2012 Bayside Fire Hall March 13, 2012, 7pm , OROUbi1 CLERK'S OFFICE MINUTES Meeting called to order: by President Darlene Turner, on 3/13/2012, 7:10pm Roll Call Board: Darlene Turner (DT), Chaz Glagolich (CG), Tom Lance (TL). Two Board seats vacant. Others Attending: None Approval of March 13, 2012 Agenda: TL moved to approve; CG seconded; approved unanimously. Approval of Feb. 28, 2012 Regular Meeting - Work Session for Budget Minutes: TL moved to approve; CG seconded; approved unanimously. Public Comments: Drew Devries arrived at end of meeting and gave comments (see below). New Business Approval of Budget for FY2013 - Monashka Bay Road Service District: CG moved to approve; TL seconded; approved unanimously. • Program Description: Monashka Bay Road Service District is responsible for the road maintenance in the Service Area. • Goal: To maintain, repair, and provide snow removal for roads in the Monashka Bay Road Service Area. • Summary/Significant Budget Changes: Increase in Snow Removal /Sanding by $6,000 from last year's budget. Budget FY2013 - budget proposal Description Amount Personnel Services & Benefits (Borough staff) $500.00 District Maintenance: Snow Removal /Sanding $26,000.00 District Maintenance: Repairs & Maintenance $25,000.00 District Maintenance: Grading/Ditching $5,000.00 Support Goods & Services: Office Supplies (Borough staff) $350.00 Support Goods & Services: Contingencies $4,000.00 Total $60,850.00 ITEM Priority Assigned Objectives for FY2013 A 1 TI. by Major Item - Bring all our roads up to Code: ask Borough to put Marmot Dr 3/17 (especially near Ridge Circle) on STIP List, replace road with proper fill - need to dig test holes, remove stumps and logs from road bed, replace with proper fill. - - -- contact Borough Engineering ASAP. B 1 TL 2683 Mountain View Dr needs follow -up letter regarding RoW concerns, as ref. in May 8, 2011 Minutes. MBRSA will reshape and enlarge cul-de -sac and direct runoff away from house foundation. Road /cul -de -sac will be widened to most feasible extent to meet Code, to improve safety and other driveway access in cul -de -sac. C 1 Board Improve road at top of Three Sisters: Cut up -hill bank back, correct drainage problem from State Hwy. apron area, down to first dip on Three Sisters (fill /raise road bed). 0 1 TI. Draft letters to TC Enterprises and to State regarding concerns and possible fixes, how to improve drainage problem at intersection of Mountain View Drive and State Hwy. E 1 TL Related to Item D, at bottom of Mountain View Drive - Letters to mailbox owners regarding frame condition and planned road work: Ditch cleaning and drainage work will be on -going issue at this location, and impediment to road maintenance, especially snow plowing. Any future road maintenance and snow plowing done at bottom of Mountain View will disturb part or the entire mailbox framework. The mailbox frame is in such poor condition that it should be reconstructed and relocated at their expense. F 1 Board Ditch cleaning this summer (under Grading /Ditching in 2013 Budget... $5,000). Identify locations during Annual Walk/Regular Mtg. G 1 TL Check w/TC on ordering, amt. needed and costs, for calcium chloride application for dust abatement and pothole reduction for summer months. H 2 TL Ask Borough for assistance with RoW locations, so we can show landowners where to place their culverts...and to clearly identify MBRSA RoW for snow plowing /piling. Private driveways and other roads accessing MBRSA roads should follow KIB Code Chapter 15.35 provisions and related ordinances. Specific locations have unique circumstances and conditions that often require road maintenance or engineering practices beyond MBRSA Board's level of expertise. For example, culverts should be sized according to up- stream runoff area and other criteria, and placed both to function as desired and within the appropriate landowners' jurisdiction. As defined in Code, culvert materials costs are responsibility of the landowner. 2 Board Resurface and crown Marmot and Mountain View Drive. Discuss grading plan, and snowplowing pattern. 2 TL Repair road signs on Spruce Circle, Island Circle, and Forest Drive (contact Borough Engineering) K 3 Board Identify up- welling /seep locations on Three Sisters during Annual Walk/Regular Mtg, and get cost est. from TC for drainpipe and /or "French Drain" construction. 3 Board Improve Island Circle cul -de -sac ITEM Priority Assigned continued - Objectives for FY2013 M 4 Board Based on previous Road Service Area walks and Board observations, culverts are likely needed in the following locations (notify landowners after RoW locations are determined and consulting w/ KIB Engineer; see Item "H" above. Culvert costs are landowners' responsibility per K/B Code Chapter 15.35: • 2159 Island Circle (Hoffman ?) needs culvert across driveway • 1637 Three Sisters driveway (Saltonstall) • 1660 Three Sisters driveway (Andon Brothers) and grade adjusted (crown) to reduce erosion to road • 2182 Three Sisters driveway (Murray) • 2147 Three Sisters driveway (McNeil) • 2144 Three Sisters driveway (St. Denny) N 4 Board 1604 Three Sisters, culvert repair (crushed ?) or clean -out culvert O 4 Board 1855 Three Sisters upper culvert re -set and clean -out, buildup road and shape driveway to remove driveway runoff from road, direct drainage to ditch P 4 TL 1879 Marmot newspaper box in drainage ditch needs to be removed Q 4 n Talk to Borough Code Enforcement Officer about having window stickers to place on vehicles that are parking on roads/blocking snow removal or other concern. Old Business None Public Comments: Drew Devries arrived at end of meeting due to conflict, but wished to express much satisfaction with snow plowing /removal job this winter season. He noted how hard of winter it was...almost broke all -time snowfall record, and some culverts froze too - And many thanks to Andy Dano and son Evan for their efforts at keeping culverts open at bottom of Three Sisters - there was standing water on road but they removed snow and ice chunks from main culvert and helped to keep road safe, possibly averting a washout and expensive road repairs. Thanks! Board Comments: • Collectively agreed with Drew's comments about Andy Dano and son Evan - send letter of appreciation for their efforts (TL) • Darlene Turner Thank -you's to Chaz and Tom for handling MBRSA duties while she was recuperating from her accident. Tom in particular for calling plowing contractor as needed over the winter. • Chaz Glagolich: Property owner at end of Spruce Circle requested MBRSA to open -up road at entrance to their driveway (was overlooked by us and plowing contractor, since drive was not used for several months over the winter); we piled huge snow berm there... Chaz worked out compromise with our contractor, TC Enterprises, and split cost 50/50 with TC Enterprises. Will be plowed from now on. • Tom Lance: No comments Adjournment: Meeting adjourned at 8 pm. SIGNED Darlene T er Date Tom /414274-4„--d c e Date President, Monashka Bay Road Service Area Secretary