ALDERWOOD BK 3 LT 3A - ZCP 6/14/2012Print form Submit b Email
KodiaklslandBorough - - - - -- y
Community Development Department III VIII IIIIIIIIIIII V III
710 Mill Bay Rd. Rm 205
_ Kodiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396 15979
httip://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2012 -087
The following information is to be supplied by the Applicant:
Property Owner /Applicant:
Kodiak Island Housing Authority
Mailing Address:
3137 Mill Bay Rd., Kodiak, AK. 99615
Phone Number:
48 -8111
Other Contact email, etc.:
Legal Description:
Subdv: Alderwood Block: 3 Lot: 3A
Street Address:
1225 Selief Lane, Kodiak AK. 99615
Use & Size of Existing Structures:
4 -Plex Rental
Description of Proposed Action:
Replace two Windows
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicularparking areas.
Staff Compliance Review:
Current zoning: R3 KIBC 17.85 PROP 15979
Lot Area: 17,270 Square Feet Lot Width: Not Applicable Bld'g Height: Not Applicable
Front Yard: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? Not Applicable
# of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
N/A
If YES, do you have an EPA Return Receipt of Notification?
N/A
an EPA defined facility?
"Permit willnotbe issued untilreceiptissubmittedtoKIB"
Subd Case No. NA Plat No. NA Bld'g Permit No. Pending
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
NA
NA
NA
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Jun 14, 2012
Signature: Leonard Martin for KlHA
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit mussf st be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 77.15.060 A. ** /� I
CDD Staff Certification
Date: Jun 14, 2012 CDD Staff: Duane Dvorak
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
PA
RID
J ohj1. fr.,Vgthe- 2X the published amount
kodeakrsr�nq�orough
Not Applicable 110" r $0.00
Less than 1.75 acres: � $30. 1J � qment r $60.00
1.76 to 5.00 acres: r $60.00 $120.00
5.01 to 40.00 acres:
40.01 acres or more:
F $90.00
F $120.00
F $150.00
F $240.00