Loading...
ATS 49 TRACT N-26 AND TRACT N-29C - ZCP 5/16/2012 (2)Kodiak Island Borough Print Form Submit by Email �.. Community Development Department I I III II II VIII I I I 710 Mill Bay Rd. Rm 205 p - Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 14846 httr)://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2012 -79 The following information is to be supplied by the Applicant: Property Owner/ Applicant: Island Fish Co. LLC Mailing Address: 317 Shelikof Phone Number: 486 -8575 Other Contact email, etc.: Legal Description: Subdv: ATS Block: 26B Lot: 29B Street Address: 317 Shelikof Use & Size of Existing Structures: Processing Plant with Retail component Description of Proposed Action: Installation of Exterior stairway to second floor portion of plant. Processing plant is located on two parcels Tract 29B and Tract 26B Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Industrial KIBC 17.105 PROP_ID 14846 Lot Area: 2 lots at .69 and .75 ac Front Yard: Not Applicable Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? Does the project involve an EPA defined facility? N/A If YES, do you have an EPA Return Receipt of Notification? N/A "Permit will not be issued until receipt is submitted to KIB" Lot Width: Not Applicable Rear Yard: Not Applicable # of Req'd Spaces: 21 Bldg Height: Not Applicable Side Yard: Not ADDlicable Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? As -Built Survey Date: May 16, 2012 List Other: Parking Plan Signature: — This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 77.15.060A.** CDD Staff Certification �L. Date: May 16, 2012 CDD Staff: Bud Cassidy Payment Verification Zoning it Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building MAY 116 J 0) Kud L+ d12 r After- the -Fact 2X the published amount NotApplica 1`1 UL7 n {��P $0.00 r $0.00 .P Less than 1.75 acres: FX_ $30.00 F_ $60.00 1.76 to 5.00 acres: F_ $60.00 F_ $120.00 5.01 to 40.00 acres: r $90.00 40.01 acres or more: r $120.00 F_ $180.00 F_ $240.00 3 z U 3 1 � 0 e n % q A A la C ST• PAUL 14Al2BQR Building Square Footage Total = 14,180 Parking Calculation (14,1801700) = 20.26 Parking Spaces Required = 21 (20.26 rounded up) w Cz-Zo12 -79 30