MONASHKA BAY BK 1 LT 13B - ZCP 5/16/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
a Kodiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form Submit by Email
I IIIIIIIIIIIIII III III
Permit No. N/A
The following information is to be supplied by the Applicant:
Property Owner/ Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Leslee Zeloof
PO Box 2728, Kodiak, AK. 99615
907.481.2882
aaabay @alaska.com
Subdv: Monashka Bay Block: 1 Lot: 13B
2915 Bavview Dr.
Use & Size of Existing Structures: SFR
Description of Proposed Action: Declaration of Bed & Breakfast per KIBC 17.15.110 Registration No. (application verified) -Ak I
KIBC 17.25.030 * *Maximum of 5 guest rooms ** requires 3 additional guest rooms.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 1.31 ac
Front Yard:
Current Zoning: RR1 KIBC 17.70
Prk'g Plan Rvw? Yes
Plat / Subdivision
Requirements?
Lot Width:
Rear Yard:
# of Req'd Spaces: 6
PROP 16763
Bld'g Height: 35'
Side Yard:
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bldg Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
List Other:
Date: May 16, 2012
Signature: Leslee Zeloof
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: May 16, 2012 CDD Staff: Martin Lydick
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
F
$0.00
F
$0.00
Less than 1.75 acres:
r
$30.00
F
$60.00
1.76 to 5.00 acres:
r
$60.00
r
$120.00
5.01 to 40.00 acres:
F
$90.00
r
$180.00
40.01 acres or more:
F
$120.00
F
$240.00