Loading...
MONASHKA BAY BK 1 LT 13B - ZCP 5/16/2012Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 a Kodiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 http://www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email I IIIIIIIIIIIIII III III Permit No. N/A The following information is to be supplied by the Applicant: Property Owner/ Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Leslee Zeloof PO Box 2728, Kodiak, AK. 99615 907.481.2882 aaabay @alaska.com Subdv: Monashka Bay Block: 1 Lot: 13B 2915 Bavview Dr. Use & Size of Existing Structures: SFR Description of Proposed Action: Declaration of Bed & Breakfast per KIBC 17.15.110 Registration No. (application verified) -Ak I KIBC 17.25.030 * *Maximum of 5 guest rooms ** requires 3 additional guest rooms. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 1.31 ac Front Yard: Current Zoning: RR1 KIBC 17.70 Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? Lot Width: Rear Yard: # of Req'd Spaces: 6 PROP 16763 Bld'g Height: 35' Side Yard: Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? List Other: Date: May 16, 2012 Signature: Leslee Zeloof This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: May 16, 2012 CDD Staff: Martin Lydick Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable F $0.00 F $0.00 Less than 1.75 acres: r $30.00 F $60.00 1.76 to 5.00 acres: r $60.00 r $120.00 5.01 to 40.00 acres: F $90.00 r $180.00 40.01 acres or more: F $120.00 F $240.00