Loading...
SOUTHEAST ADD BK 2 LT 1A - ZCP 5/10/2012Kodiak Island Borough \\ Community Development Department 710 Mill Bay Rd. Rm 205 o Kodiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 http:L/www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email II IIIIIIIIIIIIIIIIIIIII 56 Permit No. CZ2012 -076 The following information is to be supplied by the Applicant: Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Don Zimmerman & Carol Hult PO Box 1157, Kodiak, AK 99615 907.486.4497 907.539.6591 dshaker @gci.net hultcraft @gmail.com Subdv: Southeast Addition Block: 2 Lot: to Street Address: 1213 Kouskov St. Use & Size of Existing Structures: Description of Proposed Action: New SFR w/ attached Garage & detached accessory bld'g Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current zoning: RI KIBC 17.75 Lot Area: 14,841 Lot Width: 60' Front Yard: 25' Rear Yard: 10' Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? PROP ID 15611 Bld'g Height: 35' Side Yard: 5' # of Req'd Spaces: 3 Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? NO "Permit will not be issued until receipt is submitted to KlB" Subd Case No. Plat No. Driveway Permit? Septic Plan Approval: Fire Marshall: Bld'g Permit No. Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: May 10, 2012 List Other: Signature: Carol Hult This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: May 10, 2012 Payment Verification Not Applicable COD Staff: Martin Lydic Payable in Cashier's Office Room # 104- Main floor of Borough Building n1U MAY I o zote Kodlakisiana8oro Finance nenaompnt$0.00 Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: r $30.00 F $60.00 F $90.00 F $120.00 After - the -Fact 2X the published amount F $0.00 F $60.00 F $ 120.00 r $180.00 F $240.00 rariM1p�u'rt'y Ndl¢Wrvprojaa'LVCUnenVllmmerman 8 NWYBIMW_COmWCrm OOa/e012 2H_CA.pin oq� a4\ \ /A 3Y\ N \ q 4 Z jy 4 \. w ■' iSC'y g.'.R s m " „gig 'e ZIMMERMAN HULT RESIDENCE Y O 4 H� OON ZIMMEFMM BO OL HULT _ e 4 d y _n Kouak. Street 'o KWiak Aluka Ph.