Loading...
ALDERWOOD BK 2 LT 10A - ZCP 4/27/2012/ Kodiak Island Borough Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 I IIII III IIIIII IIII III Kodiak AK 99615 - Ph. (907) 486 - 9362 Fax (907) 486 - 9396 15 975 htt Zoning Compliance Permit Permit No. CZ2012 -065 The following information is to be supplied by the Applicant: Property Owner /Applicant: Corriere, Matt Mailing Address: PO Box 8753, Kodiak AK. 99615 Phone Number: 907.539.1044. Other Contact email, etc.: matt_ coastalservices @hotmail.com Legal Description: Subdv: Alderwood Block: 20,369 Lot: 10A Street Address: 1333 Mylark Ln & 1337 Mylark Ln Use & Size of Existing Structures: Vacant Description of Proposed Action: Lot 10A & 11 A designated Zero Lot Line Development. Permitted work is development activity leading to water & sewer hookups & building pads. Actual bld'g construction to be under subsequent permit. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R3 KIBC 17.85 PROP ID 15975 Lot Area: Lot Width: Bld'g Height: Front Yard: Rear Yard: Side Yard: Prk'g Plan Rvw? No # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Apr 27, 2012 List Other: Signature: Matt Corriere This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Apr 27, 2012 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's • �` 2 NAtrApplicable r $0.00 KodlaKjSlan(. Ng�S acres: r $30.00 inIn,pnp11Ayfl -v acres: ( $60.00 5.01 to 40.00 acres: r $90.00 40.01 acres or more: r $120.00 # 104 -Main floor of Borough Building After - the -Fact 2X the published amount F $0.00 (— $60.00 F_ $120.00 F_ $180.00 $240.00 STATE OF ALA: MY CO om:S is : I SE - - - -- a� Own, 2 0 }4,$05 p - o '50, z� �q �, p 00' 0 0 V Ll (, ' I t J f e �Z `I i L � POIA -065 `x/74 VA-( ER f• I � h I �f \ •Z J • I`I f � V ( �I J • • 1 1 1 � rr