THORSHEIM LT 18 SUBLT 20A - ZCP 4/11/2012Kodiak Island Borough
Print Form Submit by Email
" Community Development Department III IIIII II IIIIIII II III
�;. 710 Mill Bay Rd. Rm 205
Kodiak AK 99615
oa
Ph. (907) 486 - 9362 Fax(907)486 -9396
http://www.kodiakak.us `622
Zoning Compliance Permit Permit No CZ2012 -063
The following information is to be supplied by the Applicant:
Property Owner /Applicant: Rella Mae Corp. //Juris Mindenbergs
Mailing Address: P O Box 774, Kodiak, AK. 99615
Phone Number: 1.907.486.4141
Other Contact email, etc.:
Legal Description: Subdv: Thorsheim Block: 18 Lot: 20A
Street Address:
Use & Size of Existing Structures: Hotel / Hospitality
Description of Proposed Action: Replace exterior siding
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: Current zoning: UN op 17.95 t/ PROP ID 156z2
Lot Area: Lot Width: Bldg Height:
Front Yard: Rear Yard: Side Yard:
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Per will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Apr 11, 2012
List Other:
Signature: Juris Minder)�Irgsfor Rella Mae Corp
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Apr 11, 2012 CDD Staff: Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's
VA
Not Applicable
oclakisiaQ404 r pacres:
C11"A" P nP n
T. to gpt acres:
(
FX
F
$0.00
$30.00
$60.00
5.01 to 40.00 acres:
r
$90.00
40.01 acres or more:
r
$120.00
Room # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
r $0.00
F $60.00
F $120.00
r $180.00
r $240.00