Loading...
THORSHEIM LT 18 SUBLT 20A - ZCP 4/11/2012Kodiak Island Borough Print Form Submit by Email " Community Development Department III IIIII II IIIIIII II III �;. 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 oa Ph. (907) 486 - 9362 Fax(907)486 -9396 http://www.kodiakak.us `622 Zoning Compliance Permit Permit No CZ2012 -063 The following information is to be supplied by the Applicant: Property Owner /Applicant: Rella Mae Corp. //Juris Mindenbergs Mailing Address: P O Box 774, Kodiak, AK. 99615 Phone Number: 1.907.486.4141 Other Contact email, etc.: Legal Description: Subdv: Thorsheim Block: 18 Lot: 20A Street Address: Use & Size of Existing Structures: Hotel / Hospitality Description of Proposed Action: Replace exterior siding Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current zoning: UN op 17.95 t/ PROP ID 156z2 Lot Area: Lot Width: Bldg Height: Front Yard: Rear Yard: Side Yard: Prk'g Plan Rvw? No # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Per will not be issued until receipt is submitted to KIB" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: Apr 11, 2012 List Other: Signature: Juris Minder)�Irgsfor Rella Mae Corp This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Apr 11, 2012 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's VA Not Applicable oclakisiaQ404 r pacres: C11"A" P nP n T. to gpt acres: ( FX F $0.00 $30.00 $60.00 5.01 to 40.00 acres: r $90.00 40.01 acres or more: r $120.00 Room # 104- Main floor of Borough Building After - the -Fact 2X the published amount r $0.00 F $60.00 F $120.00 r $180.00 r $240.00