WOODLAND AC 2ND BK 1 LT 7 - ZCP 3/21/2012Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
Submit by Email
ffl IIIIIIIIIDhII 1 IU
20721
Permit No. BZ 2011 -042
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Gerald Pherson
3584 Woodland Drive
486 -2242
gpherson @msn.com
Lot 7, Bk1, Woodland Acres Subd
3584 Woodland Dr.
Use & Size of Existing Structures: SFR
Description of Proposed Action: 32' x 48' detached garage
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
ZONING: RR PACS NO. 20721
Lot Area: n/a Lot Width: Not Applicable Bldg Height: Not Applicable
Front Yard: 25 ' Rear Yard: Not Applicable Side Yard: 15 '
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
n/a
NO
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to K18"
N/A
Coastal Policy Residential Consistent? Yes
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment? Yes
Bld'g Permit No.
Borough Access Permit from Bob Scholze
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? As -Built Survey List Other:
Date: Mar10,2011
Signature: T�
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, fora period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
706.4.4 Expiration. 7997 UBC) per KIBC 77.03.060. **
CDD Staff Certification
Date: Mar 10, 2011 COD Staff:
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
/
Less than 1.75 acres $30.00 �/ P
MAR
Kodiak
Bud Cassidy lllk,41
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
007 486 5100 Western AK Land Title
04 62.10 p.m 71 07 2007
1 It
n
t
N�
p�
W A N
�a
�
er* o i
IwPI
r,
I ` i i
25' y j
q
b
a
b
r
i
C
� o
N
n 7 i 0 °
O _
y K
I ro t •
r
6
N O
� u
0
N m
a '1
0
j
-0
N
I�
t
mb
Z
r
h
n
bh�
bX
P (�
M
U
d
O � ,
a
p �
I
•� I
er* o i
n 7 i 0 °
O _
y K
I ro t •
r
6
N O
� u
0
N m
a '1
0
j
-0
N
I�
t
mb
Z
r
h
n
bh�
bX
P (�
M
U
d
O � ,
a
p �
I
•� I
\ 'Ile
0 1 .
P
0
s
F �
\ c rp 9 0
\ c c^
\G
\ \�l J
1Q,