Loading...
EAST ADD BK 45 LT 9 & 10 - ZCP 2/13/2012Kodiak Island Borough �' - Community Development Department 710 Mill Bay Rd. Rm 205 e Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 htt Zoning Compliance Permit Permit No. CZ 2012 -56 The following information is to be supplied by the Applicant: Property Owner /Applicant: Jesse Mickelson Mailing Address: 141 Rezanof Drive Phone Number:. 509- 392 -2422 Other Contact email, etc.: sicmunky @aol.com Legal Description: Lots 9 & 10, Bk45, East Addn Street Address: 1410 Rezanof Drive Use & Size of Existing Structures: Existing Two story mobile home - SFR Description of Proposed Action: Enclose an existing 4'x 8' porch on the Rezanof Drive side of home Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: .2 ac Front Yard: Not Applicable Prk'g Plan Rvw? Not Applicable Plat /Subdivision Requirements? Does the project involve an EPA defined facility? N/A ZONING: R -1 Lot Width: Not Applicable Print Form Submit by Email I VIII IIII IIIIIIIIII PACS_No. 15047 Bld'gHeight: Not Applicable Rear Yard: Not Applicable # of Req'd Spaces: 0 Side Yard: Not Applicable If YES, do you have an EPA Return Receipt of Notification? N/A "Permit will not be issued until receipt is submitted to K1011 Coastal Policy Not Applicable Consistent? Not Applicable Attachment? No Subd Case No. Driveway Permit? Septic Plan Approval: Fire Marshall: Plat No. Bld'g Permit No. Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable List Other: Date: Feb 13, 2012 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Feb 13, 2012 CDD Staff:. CKBud Cassidy Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule 1 I L 12 n\ �`32U12