Loading...
FY2012-16 Communities State CIP List 1 Introduced by: Borough Manager 2 Requested by: Borough Assembly 3 Drafted by: Special Projects Support Introduced on: 01/05/2012 4 Adopted on: 01/05/2012 5 6 KODIAK ISLAND BOROUGH 7 RESOLUTION NO. FY2012 -16 8 9 A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY ADOPTING A 2012 10 KODIAK ISLAND BOROUGH COMMUNITIES STATE LEGISLATIVE CAPITAL 11 IMPROVEMENT PROJECTS PRIORITY LIST 12 13 WHEREAS, the Kodiak Island Borough is a regional government representing the citizens 14 and communities of the Kodiak Island Archipelago; and 15 16 WHEREAS, these communities have developed a list of improvement and infrastructure 17 needs for their citizens and visitors; and 18 19 WHEREAS, these communities include the home rule city of Kodiak, the second class 20 cities of Akhiok, Larsen Bay, Old Harbor, Ouzinkie, and Port Lions, and the unincorporated 21 community of Karluk; and 22 23 WHEREAS, Community Capital Improvement Project (CIP) needs are identified and 24 prioritized by each of the communities and forwarded to the Kodiak Island Borough for 25 inclusion into an island wide list to be considered by the Alaska Legislature. 26 27 NOW, THEREFORE BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND 28 BOROUGH that the Kodiak Island Borough Communities 2012 State Legislative Capital 29 Improvement Projects Priority Lists are as follows: 30 31 City of Kodiak 32 1. Planning, Permitting and Design Costs for Pier III Replacement $2,500,000 33 2. Phase 3 Pedestrian Improvements, Pier II to Downtown $5,000,000 34 3. Phase 2 Baranof Park Improvements $1,750,000 35 Total $9,250,000 36 37 City of Akhiok 38 1. Planning & Design for Water Treatment Plant $50,000 39 2. Planning & Design for New Water Tank and Distribution Lines $50,000 40 3. Planning & Design for Sewer System $50,000 41 4. Planning & Design for New Landfill $50,000 42 5. Erosion Control /New Water -break $50,000 43 6. Planning & Design for Alternative Energy (Hydro) $50,000 44 7. New Playground Equipment $50,000 45 8. Garage Building Rehabilitation $50,000 46 Total $400,000 47 48 City of Larsen Bay 49 1. Deepwater Dock/Moorage and Piping for Fuel Delivery $550,000 50 2. Replacement Aggregate for Roads $500,000 51 3. Upgrade and Deepen Water Reservoir and Dam $1,250,000 52 4. Replace Machine Shop Building /Garage $650,000 Kodiak Island Borough Resolution No. FY2012 -16 Page 1 of 3 53 5. Upgrade City /Senior/Teen Center Municipal Building $750,000 54 6. Install Street Lights and Replace Underground Lines $300,000 55 Total $4,000,000 56 57 City of Old Harbor 58 1. Hydroelectric Power Project $6,000,000 59 2. Airport Improvements $14,000,000 60 3. Dumpster Truck/Swap Loader /Bear Proof Dumpsters $85,000 61 4. Water Distribution Improvement $18,000 62 5. City Shop $120,000 63 6. Emergency Response skiff with outboard motor and trailer $75,000 64 7. Fish Cleaning Float/Gut Barge $30,000 65 Total $20,328,000 66 67 City of Ouzinkie 68 1. Hydroelectric Power System $4,250,000 69 2. Dock/Industrial Area Construction & Development $3,044,000 70 3. Water Transmission Lines $3,782,000 71 4. Electrical Infrastructure Upgrade $600,000 72 5. Equipment Upgrades $325,000 73 6. Community Roads Replacement $3,600,000 74 7. Alternative Energy Projects $250,000 75 8. Ouzinkie Municipal Building $1,400,000 76 9. Heavy Equipment Storage Building /Shop $250,000 77 10. Fire Hall Roof Replacement $10,000 78 11. Fire Hall Furnace Replacement $7,500 79 12. Electrical Upgrade to Boat Harbor $20,000 80 13. Tourism Development $892,500 81 Total $18,431,000 82 83 City of Port Lions 84 1. Public Ferry Dock Facility $2,000,000 85 2. Small Boat Harbor Replacement, Phase II $4,000,000 86 3. Water Reservoir Repair /Replacement $2,000,000 87 4. City Maintenance Building Replacement $200,000 88 5. Heavy Equipment $250,000 89 6. Native Village of Port Lions Building $7,000,000 90 7. New Subdivision Development $800,000 91 8. Harbor Water Main $1,000,000 92 9. Rock Screen and Conveyor $100,000 93 10. Municipal Building Repair $75,000 94 11. Road Upgrades $1,200,000 95 Total $18,625,000 96 97 Community of Karluk 98 1. Community Development Plan $50,000 99 2. Planning & Design for Alternative Energy (Wind) $60,000 100 3. Planning & Design for Water Treatment Plant $375,000 101 4. Planning & Design for Replacement of Water Tank & Distribution Lines $300,000 102 5. Sewer System Upgrade $150,000 103 Total $935,000 104 Kodiak Island Borough Resolution No. FY2012 -16 Page 2 of 3 105 BE IT FURTHER RESOLVED that the Kodiak Island Borough administration is hereby 106 instructed to advise the Governor and our Legislative Representatives of the State of 107 Alaska of the Kodiak Island Borough Communities 2012 State Legislative Capital 108 Improvements Project Priority List adopted by the Kodiak Island Borough Assembly 109 110 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 111 THIS FIFTH DAY OF JANUARY, 2012 112 KODIAK ISLAND BOROUGH 113 114 , di U Last 116 Jer.j e M. Selby, Borough u - • 117 118 ATTEST: 119 120 I .J./ 122 Nova M. Javier, MM , Borough Clerk Kodiak Island Borough Resolution No. FY2012 -16 Page 3 of 3