Loading...
WOODLAND AC 7TH BK 11 LT 4 - ZCP 12/27/2011Kodiak Island Borough Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 I 11111111111111 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 16 647 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2012 -036 The following information is to be supplied by the Applicant: Property Owner / Applicant: Berestoff, A & B Mailing Address: 3478 Puffin Dr., Kodiak, AK. 99615 Phone Number: 907.654.9880 Other Contact email, etc.: Legal Description: Wdlnd Acs 7th Bk 11 Lot4 Street Address: 3478 Puffin Or Use & Size of Existing Structures: Duplex Description of Proposed Action: Convert attached garage to living area Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: R -2 PACS No. 16647 Lot Area: 7,553 Front Yard: 25' Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? Does the project involve an EPA defined facility? Lot Width: 60' Rear Yard: 10' # of Req'd Spaces: 4 4 spaces rq'd per original determination 3/22/90 (BZ -90 -019) Bldg Height: 35' Side Yard: 5' NO If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Dec 27, 2011 Signature: Bennita Berestoff This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 706.4.4 Expiration. 1997 UBQ per KIBC 17.03.060. ** CDD Staff Certification C Date: Dec 27, 2011 CDD Staff: Marti Ly. ' k / Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 for 9 I, oC m I m ------------ - - - - -- 8.ffi AM 0! $ twsvFau r ; i -. • II -- - - - ---- --------- AY I IO O y 4 i o ff pp. !': :to �� s Ono , CvdRAOF 1,' 11 for 2 I i a "1 I \ I I n w^ G � � c ..,.. w 3 � ? $ 7tl 'sue �� , CvdRAOF 1,' 11 for 2 I i a "1 I \ I I