Loading...
USS 2537B (PIER 2-CITY DOCK) - ZCP 12/15/2011Kodiak Island Borough Print Form Submit by Email \` Community Development Department I VIII II IIIIIII I I 710 Mill Bay Rd. Rm 205 o Kodiak AK 99615 -- Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http: / /www.kodiakak.us 16216 Zoning Compliance Permit Permit No. CA2021 -048 The following information is to be supplied by the Applicant: Property Owner / Applicant: City of Kodiak // Am Pres Line // John Saunders Mailing Address: PO Bo 2309, Kodiak, AK. 99615 Phone Number: 1.907.486.3090 1.907.539.2019 (John Saunders) Other Contact email, etc.: Legal Description: USS 2537B Pier 2 Street Address: 727 Shelikof Street Use & Size of Existing Structures: Warehouse & offices Description of Proposed Action: Interior alteration (enclose portion of existing warehouse for APL maintenance shop) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location ofnew construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 35,000 ZONING: Industrial Lot Width: 75' Rear Yard: Not Applicable # of Req'd Spaces: PACS_No. 16216 Bldg Height: Unlimited Side Yard: Not Applicable Front Yard: Not Applicable Prk'g Plan Rvw? No Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Dec 15, 2011 List Other: 7 Signature: John Saunders for APL - This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060.'** CDD Staff Certification Date: Dec 15, 2011 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 g Fee Schedule [Lessthan 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule � b Z qg 1 U ►I 2 u Kodiak Island Borough Community Development Department -a. 710 Mill Bay Rd. Rm 205 a Kodiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 http://www.kodiakak.us Zoning Compliance Permit Lot Width: The following information is to be supplied by the Applicant: Property Owner /Applicant: �l7>- ®G�1 ��C� J Mailing Address: {? c� , ,5 D c 3 Phone Number: Other Contact email, etc.: Legal Description: �5S S S 7 /J P 1 Pw2 2 Street Address: Use &Size of Existing Structures: ( L L obu I Description of Proposed Action: ��(✓�5 / /� /a � �� ! /�� 74:5 Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicularparking areas. Staff Compliance Review: ZONING: Lot Area: sg' Front Yard: Prk'g Plan Rvw? p Plat /Subdivision N ® Requirements? 1,t9[P/G[O� F Does the project involve an EPA defined facility? Rear Yard: 'ua # of Req'd Spaces: Print Form I I Submit by Email Permit No. I PACS_No. 1 & a 1 Co Bldg Height: AJ JA Side Yard:�� Fxc`SL� <� If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the propertyowner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: / ( Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. **EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060.** CDD Staff Certification Date: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule CDD Staff: