USS 2537B (PIER 2-CITY DOCK) - ZCP 12/15/2011Kodiak Island Borough Print Form Submit by Email
\` Community Development Department I VIII II IIIIIII I I
710 Mill Bay Rd. Rm 205
o Kodiak AK 99615
-- Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http: / /www.kodiakak.us 16216
Zoning Compliance Permit Permit No. CA2021 -048
The following information is to be supplied by the Applicant:
Property Owner / Applicant: City of Kodiak // Am Pres Line // John Saunders
Mailing Address:
PO Bo 2309, Kodiak, AK. 99615
Phone Number:
1.907.486.3090 1.907.539.2019 (John Saunders)
Other Contact email, etc.:
Legal Description:
USS 2537B Pier 2
Street Address:
727 Shelikof Street
Use & Size of Existing Structures:
Warehouse & offices
Description of Proposed Action: Interior alteration (enclose portion of existing warehouse for APL maintenance shop)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location ofnew construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 35,000
ZONING: Industrial
Lot Width: 75'
Rear Yard: Not Applicable
# of Req'd Spaces:
PACS_No. 16216
Bldg Height: Unlimited
Side Yard: Not Applicable
Front Yard: Not Applicable
Prk'g Plan Rvw? No
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bldg Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Dec 15, 2011
List Other:
7
Signature: John Saunders for APL -
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060.'**
CDD Staff Certification
Date: Dec 15, 2011 CDD Staff: Martin
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
g
Fee Schedule
[Lessthan 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
� b
Z
qg
1
U
►I
2
u Kodiak Island Borough
Community Development Department
-a. 710 Mill Bay Rd. Rm 205
a Kodiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396
http://www.kodiakak.us
Zoning Compliance Permit
Lot Width:
The following information is to be supplied by the Applicant:
Property Owner /Applicant: �l7>- ®G�1 ��C� J
Mailing Address: {? c� , ,5 D c 3
Phone Number:
Other Contact email, etc.:
Legal Description: �5S S S 7 /J P 1 Pw2 2
Street Address:
Use &Size of Existing Structures: ( L L obu I
Description of Proposed Action: ��(✓�5 / /� /a � �� ! /��
74:5
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicularparking areas.
Staff Compliance Review: ZONING:
Lot Area: sg'
Front Yard:
Prk'g Plan Rvw? p
Plat /Subdivision N ®
Requirements? 1,t9[P/G[O� F
Does the project involve
an EPA defined facility?
Rear Yard: 'ua
# of Req'd Spaces:
Print Form I I Submit by Email
Permit No.
I
PACS_No. 1 & a 1 Co
Bldg Height: AJ JA
Side Yard:��
Fxc`SL� <�
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the propertyowner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: / ( Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060.**
CDD Staff Certification
Date:
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
CDD Staff: