AIRPARK BK 4 LT 8A - ZCP 11/7/2011Kodiak Island Borough Print Form Submit by Email
—
Community Development Department IIIIIIIIIIIIIIIIIIIIIII
A 710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph.(907)486 -9362 Fax(907)486 -9396
htto: / /www.kodiakak.us 14263
Zoning Compliance Permit Permit No. CZ- 2012 -036
The following information is to be supplied by the Applicant:
Property Owner /Applicant: Harbor Enterprises
Mailing Address: P.O. Box 1337 Kodiak, AK
Phone Number: 486 -3421
Other Contact email, etc.:
Legal Description: Lot 8A, Bk4, Airpark Subd
Street Address: 1714 Mill Bay Road
Use & Size of Existing Structures: Former Thompson Transfer Garage
Description of Proposed Action: Repair roof damage from wind storm on existing building
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: Business PACS No. 14263
Lot Area: n/a Lot Width: Not Applicable Bldg Height: Not Applicable
Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? NO "Permit willnotbe issued untilreceiot is submitted to KIB" NO
Coastal Policy Not Applicable Consistent? Not Applicable
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment? Not Applicable
Bld'g Permit No.
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Oct 27, 2011 Signature:
This permit is only for the proposed project as described b� the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 7997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Oct 27, 2011 COD Staff: Bud Cassidy \!`C
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acr s $30.00
�n11 Construction Disposal Deposit
U Payable in Cashier's Office
n..nAunh Room # 104