Loading...
WOODLAND AC 1ST LT 8A - ZCP 11/1/2011Kodiak Island Borough - Print Form Submit by Email / Community Development Department I I III 1111 I 710 Mill Bay Rd. Rm 205 a Kodiak AK 99615 - -= Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http: / /www.kod iaka k us 20700 Zoning Compliance Permit Permit No. B Z2012 -034 The following information is to be supplied by the Applicant: Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Craig Gustafson // Renew Homes, LLC c/o PO Box 2354, Kodiak, AK. 99615 c/o 1.907.942.5127 Woodland Acs 1 st Addition Lot 8A 288 Bay Cir Use & Size of Existing Structures: SFR Description of Proposed Action: Replace - 728 sgft exterior deck Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: RR -1 (City utilities) PACS_No. 20700 Lot Area: 2.03 ac Lot Width: Bld'g Height: 35' Front Yard: 25 Rear Yard: 20' Side Yard: 10' Prk'g Plan Rvw? # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Nov 1, 2011 Signature: Tyrone Walkerfor Renew Homes, LLC This permit is only for the proposed project as described by the applicant. Iftheree are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. * *EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per K /BC 17.03.060. ** CDD Staff Certification Date: Nov 1, 2011 CDD Staff: Martin I v Payment Verification V � \ « $ 4 '2 �.. a� � � I I` F � / � \ 2 ( g's�.�, \ o". � *� § ■ \ 00 � } � \� r ( \ };& \{ � , 2 2 \ \ / / z � 14-33'3 - �__� ®~ � \ « $ 4 '2 �.. a� � � I I` F � / � \ 2 ( g's�.�, \ o". � *� § ■ \ 00 � } � \� r ( \ };& \{ � , 2