CUT-OFF SUB LT 3 - ZCP 10/24/2011Kodiak Island Borough
Community Development Department
i r " 710 Mill Bay Rd. Rm 205
Kodiak AK 99615
' Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http: / /www.kod iakak.us
ZONING: R -1
Zoning Compliance Permit Permit No. BZ2012 -032
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Energy Plus Homes
Mailing Address:
P O Box 1066, Kodiak, AK. 99615
Phone Number:
1.907.486.6966
Other Contact email, etc.:
e- plus @ah.net
Legal Description:
Lot 3 Cut -Off Subd
Street Address:
670 Cut -Off Rd
Use & Size of Existing Structures:
Vacant
Description of Proposed Action: NSFR w/ Gar
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 9,750 sqft
Front Yard: 25'
Prk'g Plan Rvw? Yes
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Lot Width: 60'
Rear Yard: 10'
# of Req'd Spaces: 3
Print Form Submit by Email
I I I I I
PACS_No. 20841
Bld'g Height: 35'
Side Yard: 5'
NO If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receiot is submitted to KIB"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Oct 21, 2011
List Other:
Signature: Brent Arndt
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Oct 21, 2011 CDD Staff: Martin
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
W
Fee Schedule
) 4 2011
anorou
pep8rtman�
d2EZ ANbF l��T ✓F_ EIS T
6(a56' LOT
I z
gao5n - 7dOy °i
1
— A 1
' •19�d 1
i
i
S
� � Q
O
40C. -S EAsfmENT
ta1�e o.
1
� r
x
tr
4
0
M
/07'3
EPdM PLUS HOMES
PA. OWI108tl
KUkN4lG me S96iS
SALE i�' ,o••
Kodiak Island Borough
A o Community Development Department
710 MiII Bay Rd. Rm 205
K odiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396
a
httpV/www.kodiakak.us
Zoning Compliance Permit
Print Form Submit by Email
Permit No. ,� -p�
The following information is to be supplied by the Applicant:
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Description of Proposed Action:
V
ret'.JPv?r & ,
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: q alp S
Front Yard:
Prk'g Plan Rvw?
Plat / Subdivision
Requirements?
ZONING: PACS_No. �J/J
Lot Width: Bld'g Height: ( t
Rear Yard: Side Yard:
# of Req'd Spaces:
Does the project involve
an EPA defined facility?
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to K/B"
- 'f ct.C_"-'�
Coastal Policy (A Consistent? �' Attachment? Wit&
Subd Case No. Plat No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Bldg Permit No. s-
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: /d -,21 -11
List Other:
Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
* *EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date:
CDD Staff:
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule