Loading...
CUT-OFF SUB LT 3 - ZCP 10/24/2011Kodiak Island Borough Community Development Department i r " 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 ' Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http: / /www.kod iakak.us ZONING: R -1 Zoning Compliance Permit Permit No. BZ2012 -032 The following information is to be supplied by the Applicant: Property Owner / Applicant: Energy Plus Homes Mailing Address: P O Box 1066, Kodiak, AK. 99615 Phone Number: 1.907.486.6966 Other Contact email, etc.: e- plus @ah.net Legal Description: Lot 3 Cut -Off Subd Street Address: 670 Cut -Off Rd Use & Size of Existing Structures: Vacant Description of Proposed Action: NSFR w/ Gar Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 9,750 sqft Front Yard: 25' Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? Does the project involve an EPA defined facility? Lot Width: 60' Rear Yard: 10' # of Req'd Spaces: 3 Print Form Submit by Email I I I I I PACS_No. 20841 Bld'g Height: 35' Side Yard: 5' NO If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receiot is submitted to KIB" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Oct 21, 2011 List Other: Signature: Brent Arndt This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Oct 21, 2011 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 W Fee Schedule ) 4 2011 anorou pep8rtman� d2EZ ANbF l��T ✓F_ EIS T 6(a56' LOT I z gao5n - 7dOy °i 1 — A 1 ' •19�d 1 i i S � � Q O 40C. -S EAsfmENT ta1�e o. 1 � r x tr 4 0 M /07'3 EPdM PLUS HOMES PA. OWI108tl KUkN4lG me S96iS SALE i�' ,o•• Kodiak Island Borough A o Community Development Department 710 MiII Bay Rd. Rm 205 K odiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 a httpV/www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email Permit No. ,� -p� The following information is to be supplied by the Applicant: Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Description of Proposed Action: V ret'.JPv?r & , Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: q alp S Front Yard: Prk'g Plan Rvw? Plat / Subdivision Requirements? ZONING: PACS_No. �J/J Lot Width: Bld'g Height: ( t Rear Yard: Side Yard: # of Req'd Spaces: Does the project involve an EPA defined facility? If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to K/B" - 'f ct.C_"-'� Coastal Policy (A Consistent? �' Attachment? Wit& Subd Case No. Plat No. Driveway Permit? Septic Plan Approval: Fire Marshall: Bldg Permit No. s- Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: /d -,21 -11 List Other: Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. * *EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule