ALEUTIAN BK 12 LT 46 - ZCP 10/3/2011$ Kodiak Island Borough
n Community Development Department
710 Mill Bay Rd. Rm 205
a Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form Submit by Email
1 I
ar-
Permit No. C-0r2012 -027
The following information is to be supplied by the Applicant:
Property Owner /Applicant: Doug Seward
Mailing Address: PO Box 7865, Kodiak, AK. 99615
Phone Number: 907.942.7865
Other Contact email, etc.:
Legal Description: Aleutian Bk 12 Lt 46
Street Address: 721 Lower Mill Bay Rd
Use & Size of Existing Structures: Two detached SFR(s)
Description of Proposed Action: Replace & repair rear deck & stairs
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review ZONING: R -2 PACS No. 14622
Lot Area: 8,837 Lot Width: 50 Bld'g Height: 35'
Front Yard: 25 ' Rear Yard: 10' Side Yard: 5
Prk'g Plan Rvw? Yes # of Req'd Spaces: 6
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? NO "Permit willnot be issued untilreceipt is submitted to KlB"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Oct 3, 2011
List Other:
Signature: Doug Seward /�
1 �'°' C
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Oct 3, 2011 CDD Staff: Martin Lydick
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
OCT 3— ,a
Finance p.- - 'rrrr r,,,
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
/o b o fl
o fl
/ F /�L p CNECKEp �r�c/ UP- D.4TE0,
�w 7GLC,5 86R /993. (vo cH4rt�E)
J P
P /ELD CyECKED And UP- DATED,
/5 NOVEMBER 2007.
(APOEO FUEL TANK „QE7 /N/NO (w/4LL " 57 ,)
,y[ /\ N\ / 7 \,
'1 0� W / p X
{� V
Z
0
U
O_
A r ';
-r . --
x1p - 0�k
%� ((
�
f1
3
\
l
!
I
\
\ p,
\
v `
�
c
\
v \
F \\
\
\
AS— BUILT SURVEY
PREPARED BY:
HORIZON LAND SURVEYING INC.
P.O. BOX 1945
KODIAK ALASKA 99615
( 9n7 ) nac.. acne
D
\qcvm�AOOYE OFbLt
% 'SORB
2 &P�
A
�o
! �R4oANE TFlN/{
'� (NO FUEL TANK
0
v,
ol
to
4:
>o
7 t
n1 A
L
O
pPn 5 PLw)
(PyP�P