NEW KODIAK BK 3 LT 2-6 - ZCP 8/30/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
p Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak,us
Zoning Compliance Permit
Print Form Submit by Email
1�� 11111TIINT I H
Permit No. CZ2012 -014
The following information is to be supplied by the Applicant:
Property Owner/ Applicant: Zimmerman, Barbara ETAL (Sutliff s, Inc.)
Mailing Address: 210 Shelikoff St., Kodiak, AK 99615
Phone Number: 486 -5797
Other Contact email, etc.:
Legal Description: New Kodiak Bk 3 Lot 2 -7
Street Address: 210 Shelikoff St.
Use & Size of Existing Structures: Commercial Retail Bld'g
Description of Proposed Action: Install door, remove windows & fill -in, some exterior siding
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicularporking areas.
Staff Compliance Review:
ZONING: Business PACS No. 15493
Lot Area: 51,522
Lot Width: Not Applicable Bld'g Height: 50'
Front Yard: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? No
# of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? NO "Permit willnot be issued until receipt is submitted to KIB"
Coastal Policy Not Applicable Consistent?
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment?
Bld'g Permit No.
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Aug 30, 2011
List Other:
Signature: John Ure for
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Aug 30, 2011 CDD Staff: Martin Lyd,(
Payment Verification
Zoning Compliance Permit Fee Construction Disposal Deposit
Payable in Cashier's Office Payable in Cashier's Office
Room # 104 Room # 104 k�
Fee Schedule Fee Schedule
Less than 1.75 acres $30.00 I
A 6 ` a 2011 oy
Ko iia island Boroug
nai ice Department