ALEUTIAN BK 6 LT 22 - ZCP 8/24/2011A Kodiak Island Borough
, Community Development Department
A- ' 710 Mill Bay Rd. Rm 205
Kodiak AK 99615
a
Ph. (907) 486 - 9362 Fax(907)486 -9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form Submit by Email
II IIIIIII IIIIIIIIIIIIII
Permit No. CZ- 2012 -26
The following information is to be supplied by the Applicant:
Property Owner /Applicant: John Lindberg
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
P.O. Box KWP Uganik Bay West Point
539 -8995
Lot 22, Blk 6 Aleutian Homes Subd
514 Thorsheim
Vacant
Description of Proposed Action:
Construction of 30 x 32 Home Using front yard averaging
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 6001
Front Yard: Not Applicable
ZONING: R -1
Lot Width: Not Applicable
Rear Yard: 10'
# of Req'd Spaces: 3
PACS_No. 14442
Bldg Height: 35'
Side Yard: 5'
Prk'g Plan Rvw? No
Plat / Subdivision
Requirements?
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? N/A "Permit will not be issued until receipt is submitted to K/B" N/A
Coastal Policy Residential Consistent? Yes Attachment? Yes
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Bld'g Permit No.
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Aug 24, 2011
List Other:
�}d
Signature: X •O�� /`_L
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, anew permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Aug 24, 2011 CDD Staff: Bud Cassidy ,
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
2011
Department
w
0
b�q
P.
O
0
a
W
C�
I
i
f
i
4
1--1
m
a t
m
z
s'
00
` !®
0
N
N
00
4� y
♦ IL O
- o
a