Loading...
SHAHAFKA AC BK 1 LT 7B - ZCP 8/15/2011Kodiak Island Borough Print Form Submit by Email „ - - - Community Development Department a Ko M i ll Bay Rd. Rm ��� Ph. (907) 486 9362 Fax (907) 486 - 9396 http://www.kodiakak.us 21961 Zoning Compliance Permit Permit No. BZ2012 -016 The following information is to be supplied by the Applicant: Property Owner /Applicant: John Saunders Mailing Address: PO Box 2309, Kodiak, AK 99615 Phone Number: 1.907.486.3090 Other Contact email, etc.: Legal Description: Shahafka Acs Bk 1 Lot 7B Street Address: 309 Shahafka Cir Use & Size of Existing Structures: SFR & Garage; detc'd acc bldg (28 x 28) Description of Proposed Action: Remove old 12 x 12 shed & replace w/ detc'd acc bld'g (12 x 20) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location ofnew construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: R -2 PACS No. 21961 Lot Area: 12,295 sgft Front Yard: 25' Prk'g Plan Rvw? No Plat / Subdivision Requirements? Lot Width: 60' Rear Yard: 10' # of Req'd Spaces: 3 Bld'g Height: 25' Side Yard: 5' Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? NO "Permit will not be issued until receipt is submitted to K18" Coastal Policy Residential Consistent? Yes Attachment? Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other Date: Aug 15, 2011 Signature: John Saunders /,�� �l•'�h This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. **EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, anew permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Aug 15, 2011 CDD Staff: Martin Payment Verification N 204. oca LOT 7A 1f v ) f�� >t� -old ?n ti — o 0 0 a S W Ka � n y N� 0/ i2, u 9� 5. o/ LOT 7C co, lc:) -s' s.;=. A A.07. 0 �� AO o cP �0 n 2 r h b J 0� �I J h i h MW L� 23.60' S3' ao "W / /O. i cord /ng '_, th¢ r o{ fhG �// d.e.a X RAOUL A 10 ' s 9 .01 •p'7•jcw �0 h � P � P� i