Loading...
OUZINKIE TR 1 OF TR C AIRPORT - ZCP 7/28/2011q� Kodiak Island Borough Community Development Department j, 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 htto://www.kodiaka k.us Zoning Compliance Permit VOTA ti[:fiifl The following information is to be supplied by the Applicant: Property Owner / Applicant; Owner: Alaska Department of Transportation & Public Facilities; Applicant: West Construction Co Mailing Address: West Const. Co.: 6120 A Street, Anchorage, Alaska 99518 Phone Number: 907 561 9811 Other Contact email, etc.: dave @bwcc.us Legal Description: Street Address: Ouzinkie Airport, Ouzinkie, Alaska Use & Size of Existing Structures: rural airport Description of Proposed Action: Construction of new Snow Removal Equipment Storage Building at the existing ouzinkie Airport, 2000 square foot, Pre - engineered metal building (44'x50') Site Plan to include. Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: Public Use PACS No. 19860 Lot Area: 74.92 acres Front Yard: 25' Prk'g Plan Rvw? No Plat / Subdivision Requirements? Print Form Submit by Email I Permit No . BZ2012 -009 Rear Yard: 25' # of Req'd Spaces: 3 Bldg Height: 50' Side Yard: 25' Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA clef ined facility? NO "Permit will n ot be issued untilreceipt is submitted to K18" Coastal Policy Other Consistent? Yes Attachment? Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jul 28, 2011 Signature: Dave Montgomery, for West Construction Company This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 180 days. Before such work can be recommenced, anew permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification c Date: Jul 28, 2011 CDD Staff: Martin Lydi / . Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule " More than 40 acr $120.00 JU 1 1.1 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule r r� \ AIRPORT PROPERTY BOUNDARY 2 .�- .\ 3 4 8 BZ2012 -009 7/28/11 Dave Montgomery (by reference) Q PROJECT WORK ITE 1 CONSTRUCT 44' x 50' SNOW REMOVAL EQUIPMENT BUILDING. 2 INSTALL MEDIUM INTENSITY RUNWAY/TAXIWAY LIGHTING SYSTEM. 3 INSTALL ROTATING BEACON ON THE ERE BUILDING. 4 CONNECT POWER TO LIGHTED. WIND CONE. THE WIND CONE WAS INSTALLED IN STAGE I WITH A 2" STUB. 5 PROVIDE EROSION AND SEDIMENT CONTROL FOR THE CONSTRUCTION OF THE THE POWER LINE EXTENSION. THE ALASKA ENERGY AUTHORIT IS RESPONSIBLE FOR CONSTRUCTING THE POWER LINE EXTENSION. 400' 200' 0' 400' 800' 6 SPREAD SEED, FERTILIZER. AND HECP OVER DISTURBED AREAS OF COMPLETED POWER LINE EXTENSION. 7 INSTALL FUEL TANKS AND ELECTRICAL ENCLOSURE BUILDING. B STAGING AREA. r= STATE OF ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES CENTRAL REGION OUZINKIE AIRPORT WZINKIE, ALASKA AIRPORT RELOCATION STAGE n PROJECT N°. 52837 AIP N°. 3 -02- 0480- 002 -7011 PROJECT LAYOUT PLAN DAM. 2/22, SHEM" 4 D AS -ONLY BY DATE REVISION