Loading...
MILLER PT 1ST BK 1 LT 4A-2 - ZCP 7/26/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 htti)://www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email Permit No. BZ2012 -008 The following information is to be supplied by the Applicant: Property Owner/ Applicant: Patrick Costello Mailing Address: PO Box 8831, Kodiak AK 99615 Phone Number: 907.539.5737 (c /o Luke Smith 907.486.2746) Other Contact email, etc.: Patman @yahoo.com Legal Description: Miller Pt 15t Bk 1 Lt4A -2 Street Address: 3283 Balika Ln Use & Size of Existing Structures: Small SFR Description of Proposed Action: Construct new SFR Existing SFR must be demo'd or otherwise converted to legal acc bld'g priorto C.O. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicularparking areas. Staff Compliance Review: Lot Area: 15,929 sft Front Yard: 25' Prk'g Plan Rvw? Yes Plat / Subdivision Requirements? ZONING: R -2 Lot Width: 60' Rear Yard: 10' # of Req'd Spaces: 3 PACS_No. 21472 Bldg Height: 35' Side Yard: 5' Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? NO "Permit will be issued untilreceint submitted to KlB" Coastal Policy Residential Consistent? Yes Subd Case No. Driveway Permit? Septic Plan Approval: Fire Marshall: Plat No. Attachment? Bld'g Permit No. Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jul 26, 2011 Signature: Luke Smith for Patrick Costello per contract This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. * *EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 706.4.4 Expiration. 7997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Ju126,2011 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 (1 4-Z JUL 26 2011 Kodiak island Uorougti k �> iRS" 5�Yve �t IL 1� I t I i I I � _I - r 1_ �- -I !- �rt — - - -- I — al -- � —' — -- — —r — — — -- — — — — i I -- j -AIL i