MILLER PT 1ST BK 1 LT 4A-2 - ZCP 7/26/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396
htti)://www.kodiakak.us
Zoning Compliance Permit
Print Form Submit by Email
Permit No. BZ2012 -008
The following information is to be supplied by the Applicant:
Property Owner/ Applicant: Patrick Costello
Mailing Address:
PO Box 8831, Kodiak AK 99615
Phone Number:
907.539.5737 (c /o Luke Smith 907.486.2746)
Other Contact email, etc.:
Patman @yahoo.com
Legal Description:
Miller Pt 15t Bk 1 Lt4A -2
Street Address:
3283 Balika Ln
Use & Size of Existing Structures:
Small SFR
Description of Proposed Action: Construct new SFR
Existing SFR must be demo'd or otherwise converted to legal acc bld'g priorto C.O.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicularparking areas.
Staff Compliance Review:
Lot Area: 15,929 sft
Front Yard: 25'
Prk'g Plan Rvw? Yes
Plat / Subdivision
Requirements?
ZONING: R -2
Lot Width: 60'
Rear Yard: 10'
# of Req'd Spaces: 3
PACS_No. 21472
Bldg Height: 35'
Side Yard: 5'
Does the project involve If YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? NO "Permit will be issued untilreceint submitted to KlB"
Coastal Policy Residential Consistent? Yes
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment?
Bld'g Permit No.
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Jul 26, 2011 Signature: Luke Smith for Patrick Costello per contract
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
* *EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
706.4.4 Expiration. 7997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Ju126,2011 CDD Staff: Martin
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
(1 4-Z
JUL 26 2011
Kodiak island Uorougti
k
�>
iRS" 5�Yve �t
IL
1�
I
t
I i I
I �
_I -
r 1_
�-
-I !- �rt
— - - --
I
— al -- � —' — -- — —r — — — -- — — — —
i
I
-- j -AIL
i