RUSSELL EST BK 1 LT 8 - ZCP 7/1/2011Kodiak Island Borough Print Form Submit by Email
/ Community Development Department I IIIIIIIIII IIII
' 710 Mill Bay Rd. Rm 205 I I I
Kodiak AK 99615
-_=
Ph. (907) 486 - 9362 Fax(907)486 -9396 16068
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2012 -001
The following information is to be supplied by the Applicant:
Property Owner /Applicant: Laurie Orvedal
Mailing Address:
1710 Larch Street, Kodiak AK 99615
Phone Number:
1.206.251.4602
Other Contact email, etc.:
ellelsea @hotmail.com
Legal Description:
Russell Est Bk 1 Lot 8
Street Address:
1515 Larch St
Use & Size of Existing Structures: Residential Duplex
Description of Proposed Action: Residential Fill (rearyard)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicularparking areas.
Staff Compliance Review:
Lot Area: 10,710
Front Yard: 25'
Prk'g Plan Rvw? Yes
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Var Case No. 402A
ZONING: R -3
Lot Width: 60'
Rear Yard: 10'
# of Req'd Spaces: 6
PACS_No. 16068
Bld'g Height: 35'
Side Yard: 5'
N/A If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to K18"
Coastal Policy Residential Consistent? Yes Attachment?
Subd Case No.
Plat No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Bld'g Permit No.
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Jul 1, 2011
List Other:
Signature: Laurie Orvedal
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 77.03.060. **
CDD Staff Certification
C
Date: Jul 1, 2011 CDD Staff: Martin Ly. ck
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
C
1
Fee Schedule