FY2011-30 Alternative Delivery Methods for KHS Renovation Project 1 Introduced by: Borough Manager
2 Requested by: E &F Director
3 Drafted by: E &F Director
Introduced on: 06/16/2011
4 Adopted on: 06/16/2011
5
6 KODIAK ISLAND BOROUGH
7 RESOLUTION NO. FY2011 -30
8
9 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
10 IMPLEMENTING ALTERNATIVE DELIVERY METHODS FOR THE KODIAK HIGH
11 SCHOOL RENOVATION AND ADDITION PROJECT WITH THE APPROVAL OF ALASKA
12 DEPARTMENT OF EDUCATION AND EARLY DEVELOPMENT
13
14 WHEREAS, Kodiak Island Borough voters authorized the sale of up to $76.31M in bonds
15 to fund the Kodiak High School Renovation and Addition Project on October 6, 2009; and
16
17 WHEREAS, the Design /Bid /Build method of project delivery is commonly used by KIB,
18 and using this method of delivery for this project presents several significant challenges
19 including: restrictive site spaces, complexity of construction, the need for scheduled
20 phasing, and the need to minimize impacts to the on -site education program; and
21
22 WHEREAS, use of alternative delivery methods for procurement of construction services
23 is allowed under KIB Code 3.30.110 as verified by the Borough Attorney; and
24
25 WHEREAS, the State of Alaska Department of Education and Early Development allows
26 the use of alternative delivery methods as approved by the borough; and
27
28 WHEREAS, use of the Construction Manager as General Contractor at -risk delivery
29 method has advantages for this project including: contractor involvement in the design
30 process, greater budget controls, and reduction of risk to owner and contractor; and
31
32 WHEREAS, use of the Construction Manager as General Contractor at -risk delivery
33 method provides the Kodiak Island Borough with the ability to select contractors based on
34 qualifications and price; thereby, avoiding less qualified low bidders.
35
36 NOW, THEREFORE BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND
37 BOROUGH THAT the Manager is authorized to implement alternative delivery methods for
38 the Kodiak High School Renovation and Addition Project with the approval of Alaska
39 Department of Education and Early Development.
40
41 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
42 THIS SIXTEENTH DAY OF JUNE, 2011
43
44 KODIAK ISLAND BOROUGH
45
46
47 iht 7
48 -
49 ATTEST: Jere e M. Selby, Borough M.yo
50
51
52 n �� , i , ^
53 l/�
54
55 Nova M. Javier, MMCp Borough Clerk
56
Kodiak Island Borough Resolution No. FY2011 -30
Page 1 of 1