Loading...
- ZCP 6/9/2011Submit by Email 1 Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 15890 Permit No. CZ2011 -069 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Best Western Kodiak Inn 236 W. Rezanof Drive, Kodiak AK 99615 1.907.486.5712 Kodiak Inn Subdivision (KTwnst Bk 19 Lt 14) 236 W. Rezanof Drive, Kodiak AK 99615 Use & Size of Existing Structures: Hotel Description of Proposed Action: Upgrades to elevator service - extend to third floor Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 27,498 Front Yard: Not Applicable ZONING: Business PACS_No. 15840 Lot Width: Not Applicable Bld'g Height: 50' Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? No # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to KIB" Coastal Policy Business Consistent? Yes Attachment? Subd Case No. Driveway Permit? Septic Plan Approval: Fire Marshall: Plat No. Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: Jun 9, 2011 List Other: Signature: Susan Johnson Bld'g Permit No. This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, orif the building construction or use is abandoned at anytime, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (sec. 706.4.4 Expiration. 7997 UBC) per KIBC 17.03.060. ** CDD Staff Certification 1 4 Date: Jun 9, 2011 CDD Staff: Martin Lydi Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule Department