EAST ADD BK 51 LT 18A - ZCP 4/11/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
1111
1111
1
15124
111
Submit by Email
11
Permit No. CZ2011 -050
1
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Ken Magregor / /Tyrone Walker
c/o 1.907.512.2969
East Add Bk51 Lt 18A
1526 E. Rezanof Dr
Use & Size of Existing Structures: SFR
Description of Proposed Action: Exterior deck ( -220 sqf)
* *This permit replaces original dated 4/1/2011 - corrected legal description & address - fee has already been paid **
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: R -1 PACS_No. 15124
Lot Area: 7,500 sqft Lot Width: 60' Bld'g Height: 35 '
Front Yard: 25' Rear Yard: 10' Side Yard: 5'
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
If YES, do you have an EPA Return Receipt of Notification?
NO "Permit will not be issued until receipt is submitted to MB" / A
Coastal Policy Residential
Subd Case No.
Consistent?
Plat No.
Yes
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Attachment?
:.. •-
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. l agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Apr 11, 2011 Signature: Tyrone Walker for Magregor - ---- --
This permit is only for the proposed project as described by the applic t f th are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Apr 11, 2011 CDD Staff: Martin Lydick
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
• . • • -�
Lot Width: 60'
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Ken Magregor H Tyrone Walker
Mailing Address:
Phone Number: c/o 1.907.512.2969
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures: SFR
Description of Proposed Action: Exterior deck (— 220 sqft)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review ZONING: R -1 PACS_No. �—
Lot Area:
Front Yard: 25'
Prk'g Plan Rvw? No
Plat / Subdivision
Requirements?
Permit No . CZ2011 -050
Bld'g Height: 35'
Side Yard: 5'
Rear Yard: 10'
# of Req'd Spaces:
Does the project involve If YES, do you have an EPA Return Receipt of Notification? N/A
an EPA defined facility? NO `Permit will not be issued until receipt is submitted to K18"
Coastal Policy Residential Consistent? Yes
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment?
Bld'g Permit No.
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: A r 1, 2011 Signature: K M
p g agregor
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
Date: Apr 1, 2011 CDD Staff: Martin L
61
Payment Verification
PAID
Less than 1.75 acres $30.00 APR 0 4 20 11
Kod ak
Finance artment