LEITE ADD BK 3 LT 15A - ZCP 4/4/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
1
Print Form
1111
11
1
15380
111
11
Permit No. CZ2011 -051
Submit by Email U„_
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Jody Nummer // Tyrone Walker
c/o 1.907.512.2969
Leite Add Bk 3 Lt 15A
1619 Mission Rd
Use & Size of Existing Structures: SFR
Description of Proposed Action: Exterior stairs & landings (- 350 sqft)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: R -1 PACS No. 15380
Lot Area: Lot Width: 60' Bld'g Height: 35'
Front Yard: 25' Rear Yard: 10' Side Yard: 5'
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
NO If YES, do you have an EPA Return Receipt of Notification? N / A
"Permit will not be issued until receipt is submitted to KlB"
Coastal Policy Residential Consistent? Yes
Subd Case No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Plat No.
Attachment?
:..
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. i agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Apr 1, 2011
List Other:
Signature: Jody Nummer
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Apr 1, 2011 CDD Staff: Martin Lydi
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
t ii.h 1
t f
�Ay� LOT 14A
cov•
PAP
o xcr-
LOT
e
b O
� h
14
NO
2042