T24S R24W TL 1101 AFOGNAK ISLAND - ZCP 3/11/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form u....11
111
hill
11
18749
Submit by Email
Permit No. BZ2011 -043
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Kodiak Island Borough / City of Kodiak Ieasee
71O Mill Bay Rd., Kodiak, AK. 99615
1.907.486.9301
T27S R20W Monashka Bay Reservoir Pump house
Use & Size of Existing Structures: Water facility
Description of Proposed Action: Replace roof on pumphouse
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area:
Front Yard:
Prk'g Plan Rvw?
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
ZONING: Conservation
Lot Width:
Rear Yard:
# of Req'd Spaces:
PACS_No. 18749
Bldg Height:
Side Yard:
N/A
If YES, do you haver an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
N/A
Coastal Policy Industrial Consistent? Yes Attachment?
Subd Case No. Plat No.
List Other:
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Bld'g Permit No.
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
Date: Mar 11, 2011
Signature: .- Doug Mathers for the City of Kodiak
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Mar 11, 2011 CDD Staff: Martin Lydick
c Sl'' . <
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
than 40 acres $120.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
x , Kodiak Island Borough
y * Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
The following information is to be supplied by the Applicant:
Property Owner / Applicant: ,
Mailing Address: `7 (p Wl'�
Phone Number.
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Description of Proposed Action: IesQ-p t I(L ( - ;e F b fl
Site Plan to include: lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
P erm i t •
0
� tfo mai
Staff Compliance Review ZONING
Lot Area: �. Lot Width: Bid'g Height:
Front Yard: Rear Yard: Side Yard:
Prk'g Plan Rvw? # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve if YES, do you have an EPA Return Receipt of Notification?
an EPA defined facility? "Permit will not be issued until recebt is submitted to K/B"
Coastal Policy Consistent? Attachment?
Subd Case No. Plat No. Bid'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: thereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that
have the authority to certify this as the property owner, or as a representative of the property owner, [agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? List Other:
Date: t / (90P. Signature :(
This permit is only for the proposed project as described by the applicant if there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KiBC 17.03.060.**
CDD Staff Certification
Date: CDD Staff:
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule Fee Schedule
`V Ey