Loading...
T24S R24W TL 1101 AFOGNAK ISLAND - ZCP 3/11/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form u....11 111 hill 11 18749 Submit by Email Permit No. BZ2011 -043 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Kodiak Island Borough / City of Kodiak Ieasee 71O Mill Bay Rd., Kodiak, AK. 99615 1.907.486.9301 T27S R20W Monashka Bay Reservoir Pump house Use & Size of Existing Structures: Water facility Description of Proposed Action: Replace roof on pumphouse Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: Front Yard: Prk'g Plan Rvw? Plat / Subdivision Requirements? Does the project involve an EPA defined facility? ZONING: Conservation Lot Width: Rear Yard: # of Req'd Spaces: PACS_No. 18749 Bldg Height: Side Yard: N/A If YES, do you haver an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" N/A Coastal Policy Industrial Consistent? Yes Attachment? Subd Case No. Plat No. List Other: Driveway Permit? Septic Plan Approval: Fire Marshall: Bld'g Permit No. Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Date: Mar 11, 2011 Signature: .- Doug Mathers for the City of Kodiak This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Mar 11, 2011 CDD Staff: Martin Lydick c Sl'' . < Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule than 40 acres $120.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 x , Kodiak Island Borough y * Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us The following information is to be supplied by the Applicant: Property Owner / Applicant: , Mailing Address: `7 (p Wl'� Phone Number. Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Description of Proposed Action: IesQ-p t I(L ( - ;e F b fl Site Plan to include: lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. P erm i t • 0 � tfo mai Staff Compliance Review ZONING Lot Area: �. Lot Width: Bid'g Height: Front Yard: Rear Yard: Side Yard: Prk'g Plan Rvw? # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve if YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until recebt is submitted to K/B" Coastal Policy Consistent? Attachment? Subd Case No. Plat No. Bid'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: thereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that have the authority to certify this as the property owner, or as a representative of the property owner, [agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? List Other: Date: t / (90P. Signature :( This permit is only for the proposed project as described by the applicant if there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KiBC 17.03.060.** CDD Staff Certification Date: CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule Fee Schedule `V Ey