Loading...
FY2011-20 Borough Communities State CIP List 1 - Introduced by: Borough Manager 2 Requested by: Borough Assembly 3 Drafted by: Special Projects Support 4 Introduced on: 03/03/2011 Adopted on: 03/03/2011 5 6 7 KODIAK ISLAND BOROUGH 8 RESOLUTION NO. FY 2011.20 9 10 A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY ADOPTING A 2011 11 KODIAK ISLAND BOROUGH COMMUNITIES STATE LEGISLATIVE CAPITAL 12 IMPROVEMENT PROJECTS PRIORITY LIST 13 14 WHEREAS, the Kodiak Island Borough is a regional government representing the citizens 15 and communities of the Kodiak Island Archipelago; and 16 17 WHEREAS, these communities have developed a list of improvement and infrastructure 18 needs for their citizens and visitors; and 19 20 WHEREAS, these communities include the home rule city of Kodiak, the second class cities 21 of Akhiok, Larsen Bay, Old Harbor, Ouzinkie, and Port Lions; and the unincorporated 22 community of Karluk; and 23 24 WHEREAS, Community Capital Improvement Project (CIP) needs are identified and 25 prioritized by each of the communities and forwarded to the Kodiak Island Borough for 26 inclusion into an island wide list to be considered by the Alaska Legislature. 27 28 NOW, THEREFORE BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND 29 BOROUGH that the Kodiak Island Borough Communities 2011 State Legislative Capital 30 Improvement Projects Priority Lists are as follows: 31 32 City of Kodiak 33 1. UV Water Treatment Facility Construction $3,528,000 34 2. New Public Library Design $6,888,110 35 3. Phase 1 Baranof Park Improvements $2,000,000 36 4. Pedestrian Improvements Pier II to Downtown $1,000,000 37 5. Pathway Design from Pier II to Kodiak City Boundary $384,000 38 Total $13,800,110 39 40 City of Akhiok 41 1. New Water Treatment Plant $2,990,000 42 2. New Water Holding Tanks and Distribution Lines $750,000 43 3. Sewer System $250,000 44 4. Landfill $250,000 45 5. New Waterbreak (erosion control) $750,000 46 6. Feasibility Study for Alternative Energy $100,000 47 7. Tsunami Shelter $50,000 48 Total $5,140,000 49 50 51 Kodiak Island Borough Resolution No. FY2011 -20 Page 1 of 3 52 City of Larsen Bay 53 1. Design, Engineering and Cost Analysis for Deepwater 54 Dock/Moorage for Fuel Barge & Header Piping $550,000 55 2. Replacement Aggregate for Road System Resurfacing $500,000 56 3. Upgrade and Deepen Water Reservoir and Dam $1,250,000 57 4. Upgrade City /Senior/Teen Center Municipal Building $750,000 58 5. Replace Machine Shop Building /Garage $650,000 59 6. Electric Heat vs. Boilers in Municipal Building $25,000 60 Total $3,725,000 61 62 City of Old Harbor 63 1. Hydroelectric Power Project $6,000,000 64 2. Airport Improvements $14,000,000 65 3. Dumpster Truck/Swap Loader /Bear Proof Dumpsters $85,000 66 4. Water Distribution Improvement $18,000 67 5. City Shop $120,000 68 6. Emergency Response Skiff With Outboard Motor and Trailer $75,000 69 7. Fish Cleaning Float/Gut Barge $30,000 70 8. Equipment Upgrade $25,000 71 9. Equipment: Mini Excavator $50,000 72 Total $20,403,000 73 74 City of Ouzinkie 75 1. Dock/Industrial Area Construction & Development $4,000,000 76 2. Water Transmission Lines $4,132,000 77 3. Electrical Infrastructure Upgrade $730,000 78 4. Community Roads Replacement $3,735,000 79 5. Alternative Energy Projects $250,000 80 6. Community Vehicle $30,000 81 7. Fork Lift Replacement $125,000 82 8. Fuel Truck Replacement $400,000 83 9. Ouzinkie Municipal Building $1,400,000 84 10. Heavy Equipment Storage Building /Shop $250,000 85 11. Fire Hall Roof Replacement $10,000 86 12. Fire Hall Furnace Replacement $7,500 87 13. Electrical Upgrade to Boat Harbor $20,000 88 14. Tourism Development $392,500 89 15. Rock Crusher $150,000 90 16. Landfill Maintenance Equipment $100,000 91 17. Community Commercial Kitchen Facility $150,000 92 18. Upgrade Freezer Building /Fish Processing Facility $350,000 93 Total $16,232,000 94 95 Kodiak Island Borough Resolution No. FY2011 -20 Page 2 of 3 96 City of Port Lions 97 1. City Dock and Ferry Terminal Replacement $8,000,000 98 2. Small Boat Harbor Replacement, Phase 11 $4,000,000 99 3. Port Lions Causeway $25,000 100 4. Rock Screen and Conveyor $100,000 101 5. Excavator $85,000 102 6. Native Village of Port Lions Building $7,000,000 103 7. Harbor Water Main $1,000,000 104 8. Municipal Building $300,000 105 9. City Maintenance Shop $200,000 106 10. Road Upgrades $500,000 107 11. New Subdivision $800,000 108 12. Search & Rescue Skiff $100,000 109 Total $18,410,000 110 111 Community of Karluk 112 1. Water Treatment Plant $2,990,000 113 2. Pre -pay electrical system $50,000 114 3. Landfill $500,000 115 4. Karluk Church Restoration $275,000 116 5. Permanent Dock Facility $12,000,000 117 6. Multi- Purpose Building $750,000 118 7. Fuel Truck, Bull Dozer, Fire Truck $600,000 119 8. Grant Writing Assistance $20,000 120 Total $17,185,000 121 122 BE IT FURTHER RESOLVED that the Kodiak Island Borough administration is hereby 123 instructed to advise the Governor and our Legislative Representatives of the State of Alaska 124 of the Kodiak Island Borough Communities 2011 State Legislative Capital Improvements 125 Project Priority List adopted by the Kodiak Island Borough Assembly. 126 127 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 128 THIS THIRD DAY OF MARCH, 2011 129 130 KODIAK ISLAND BOROUGH 131 132 133 � r 1 ► 134 Je 'me M. Selby, Bo • g Ma or 135 136 ATTEST: 138 1111 4 137 .� • ^^^A� 139 I 111 . :_ '� MA 140 Nova M. Javier, MMC, Boro • h Clerk Kodiak Island Borough Resolution No. FY2011 -20 Page 3 of 3